Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

South Field Industrial Waste System Improvements

Active
11822.61State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Field Industrial Waste System Improvements project, contract number 11822.61, is a design-bid-build solicitation by the City and County of San Francisco for work at the San Francisco International Airport. The scope of work includes the installation of Cure-In-Place-Pipe along South McDonnell Road and between inbound and outbound roads, the replacement of submersible pumps at one pump station, and the upgrading of SCADA panels at two pump station locations to improve remote monitoring and control via the SCADA Wonderware/Aveva system. The contract is awarded to the responsible bidder with the lowest total bid price. A California Class C contractor license is required at the time of bid, and the project includes a Local Business Enterprise subcontracting requirement. The total contract duration is 365 consecutive calendar days following the Notice to Proceed, with substantial completion required within 280 days. Bids must be submitted via the airport's e-Procurement portal in PDF format and original bid forms and security must be postmarked by November 30, 2026. Key requirements include the provision of performance and payment bonds equal to 100 percent of the contract sum for awards exceeding 25,000 dollars, compliance with California Department of Industrial Relations prevailing wage rates, and adherence to the Citybuild/First Source Referral Program. Technical standards include ISA/IEC-62443 and NIST SP-800-53 for cybersecurity, and ADA standards for accessible design. Acceptance of the work involves a 45-day period following the Notice of Completion, after which the warranty period begins.

General Info

San Francisco airport contract for industrial waste system improvements and SCADA panel upgrades.

Documents

4
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first3 pages · form
High
PDF, High priority: read this first680 pages · rfb
High
PDF, High priority: read this first529 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Design and Construction - Utility Engineering
Contacts2 people available
OfficeSan Francisco, CA, 94128, USA
Office AddressSan Francisco, CA, 94128, USA
Contacts
Nnaemeka OnyebuenyiJunior Engineer
Tiffany Gonzalez-RuizProcurement Officer I

Interested Companies (13)

EntramPORT CHARLOTTE, FL
ArchKey/Sprig ElectricSan Jose, CA
Schembri ConstructionSan Francisco, CA

See All 13 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
1.01 Project Summary Contract Number: Project ID Project Title: Project Title Delivery Type: Design-Bid-Build Funding: Local Funding Source 1.02 Project Description: Contract Description 1.03 Contract Duration: The Contract Time is Total Contract Time / Final Completion total consecutive calendar days after the effective date indicated in the Notice to Proceed. See Document 00 54 39 (Contract Time and Liquidated Damages) for additional details. 1.04 Estimate: The estimated cost of construction is Estimated Construction Range . 1.05 License Requirements: California Class " Contractor License Requirements " license is required at the time of Bid. 1.06 LBE Subcontracting Requirement: The Local Business Enterprise (LBE) subcontracting requirement is LBE Sub Requirement % of the Contract Sum. 1.07 Pre-Bid Meeting: A virtual pre-bid meeting will be held at Pre-Proposal Time , Pacific Time, on Pre-Proposal Date , using Microsoft Teams video conferencing. Participation in the virtual pre-bid meeting is not mandatory but recommended. To participate in the virtual pre-bid meeting using Microsoft Teams or Microsoft Teams web app, please use the following link: Virtual Pre-Bid / Pre-Conference Meeting Link To join by phone, call +1 (555) 000-0000 and use the Conference ID: Virtual Pre-Bid / Pre-Conference - Conference ID# 1.08 Bid Opening Date: Bidders shall submit their Bids through the Airport's e-Procurement portal found at: https://procurement.opengov.com/portalsfoconstuction no later than Proposal Submission Time , Pacific Time, on Proposal Submission Date . Completed Bids and required documents must be uploaded in Portable Document Format (PDF). Bids received after the Bid opening time will not be considered. All details for the preparation of Bids are set forth in Document 00 21 13 (Instructions to Bidders). Bidder shall transmit their original Bid Forms (Document 00 41 00) and original Bid security by U.S. Mail in a sealed envelope addressed to Procurement Contact Full Name , Contract Administrator, San Francisco International Airport, P.O. Box 8097, San Francisco, CA 94128, postmarked no later than Proposal Submission Date . Bids will be opened and read virtually using Microsoft Teams video conferencing. To participate in the virtual bid opening using Microsoft Teams or Microsoft Teams web app, please use the following link: Virtual Bid Opening Meeting Link To join by phone, call +1 (555) 000-0000 and use the Conference ID: Virtual Bid Opening - Conference ID# 1.09 Project Site Visit: Please see the Timeline for more information about the Site Visit. 1.10 Contact Information: CONTRACT MANAGER: Contact Full Name Contact Phone Contact Email CONTRACT ADMINISTRATOR: Procurement Contact Full Name Procurement Contact Phone Procurement Contact Email
Addendum #1: A. MODIFICATIONS TO THE CONTRACT DOCUMENTS The following changes, additions or deletions as set forth herein shall apply to the Contract Documents and shall be made a part thereof and shall be subject to all of the requirements thereof as though originally shown and/or specified. All other conditions remain unchanged. MODIFICATIONS TO THE ADVERTISEMENT FOR BIDS. The Site Visit has been updated from Monday, November 9, 2026 at 2:00PM PST to Monday, November 9, 2026 at 1:00PM PST. The site visit requirements have been revised to include instructions that all attendees must present a valid government-issued photo ID.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe in 18 and 24-inch diameters. Technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Site preparation tasks include clearing and grubbing over 5,130 square yards of wooded areas, seeding, and fine grading. Key operational deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), the maintenance of flows and bypass during construction, and the provision of geotechnical instrumentation and monitoring. Additionally, contractors are required to obtain railroad insurance for applicable work areas. The project also involves various pipe and manhole abandonment tasks and extra depth excavation.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 30 days
View Details

More opportunities from California → Design and Construction - Utility Engineering

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS