Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

CLASS 2 LANDFILL PARTIAL CLOSURE

Active
RFP #27027State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Greenville is soliciting proposals for the partial closure of the Class 2 Unit 2 Landfill at the Twin Chimneys Landfill in South Carolina. The project scope involves significant earthwork, including the excavation of approximately 301,000 cubic yards of soil and the placement of 120,000 cubic yards of structural fill. Key construction elements include the installation of a stormwater pond, subgrade preparation, a perimeter berm, a stone access road, and various erosion control measures such as silt fencing, gabion baskets, seeding, and erosion control blankets. The County requires substantial completion within 210 calendar days, with a tentative notice to proceed date of December 18, 2026. The contract is governed by the EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Award will be based on a weighted point system, and the successful contractor must provide a South Carolina-licensed land surveyor and a licensed firm for soil testing. Performance and payment bonds equal to the contract price are required. Proposals must be submitted via the online portal by November 16, 2026. Strict adherence to material handling standards for geotextiles and compliance with South Carolina licensing and federal safety regulations is mandatory. Payment is due upon receipt of undisputed invoices, with a 30-day past-due threshold and a 60-day window before the contractor may suspend services.

General Info

Greenville County seeks proposals for the partial closure of Twin Chimneys Landfill.

Place of Performance

SC, USA

Set-Aside

NONE

Documents

5

Greenville County RFP #27027 - Class 2 Landfill Partial Closure

PDF, High priority: read this first30 pages · rfp
High

Greenville County Sample Services Agreement 2022

PDF, High priority: read this first11 pages · contract-document
High

Twin Chimneys Class 2 Landfill Partial Closure - Proposal Form

PDF, High priority: read this first148 pages · rfp
High

Twin Chimneys Landfill Partial Closure - Contract Drawings

PDF, High priority: read this first8 pages · specifications
High

County of Greenville Substitute Form W-9

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySouth Carolina → LANDFILL OPERATIONS
Contacts1 person available
OfficeGreenville, SC, 29601, USA
Office AddressGreenville, SC, 29601, USA
Contacts

Interested Companies (10)

Upstate GradingInman, SC
Atlantic LiningEastampton, NJ
Miller Soil SolutionsDillsburg, PA

See All 10 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The County of Greenville is seeking proposals for the Partial Closure Construction of the Class 2 Unit 2 Landfill at the Twin Chimneys Landfill, subject to the conditions and all provisions set forth herein and in the Drawings and Specifications (attachment C & D). A portion of the Class 2 Unit 2 Landfill has achieved final grades. The closure consists of constructing: A stormwater pond Subgrade preparation Structural fill of a perimeter berm Stone access road Erosion control measures (silt fence, erosion control blankets, seeding). The project is approximately 301,000 cy excavation and 120,000 cy of structural fill. The soil borrow area is within the Unit 2 Landfill footprint and has been cleared. The County desires the project to reach substantial completion within 210 calendar days.

Similar Contracts

Same NAICS industry code

More opportunities from South Carolina → LANDFILL OPERATIONS

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS