Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Class IV Bicycle Network Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Class IV Bicycle Network Installation is a subcontract project for the City of Santa Ana in California, specifically targeting mixed-use redevelopment areas. The scope of work involves the construction of Class IV bicycle lanes along Bear Street and Sunflower Avenue, which requires the installation of physical separators and barriers to meet the specific safety and design standards of a Class IV designation. The primary objective of this contract is to deliver a fully completed and protected bicycle network within the 92704 zip code. Classified under NAICS code 237310 for highway, street, and bridge construction, the project focuses on enhancing urban mobility and safety through the implementation of protected cycling infrastructure.

General Info

Subcontract for installing protected Class IV bicycle lanes on Bear Street and Sunflower Avenue.

Agency

California → City of Santa Ana

Place of Performance

Santa Ana, CA, 92704

Set-Aside

NONE

Documents

This scope was carved out of AA No. 2025-01.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

The Village Santa Ana Specific Plan

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom The Village Santa Ana Specific Plan
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Ana
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Santa Ana
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs protected bicycle lanes for prime contractors on City of Santa Ana mixed-use redevelopment projects. Constructs Class IV bike lanes along Sunflower Avenue and Bear Street. Requires installation of physical separators and barriers required for Class IV designation. Delivers a completed Class IV bicycle network.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS