Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on May 25, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Clean and seal masonry split face block walls

Closed
W9128F-16-Q-G008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238140
New
SLED
ITB 2026-1019 WMHS Old Gym Structural & Masonry Repairs
Solicitation # 2026-1019
Augusta County Public Schools has issued Invitation to Bid 2026-1019 for structural and masonry repairs at the Wilson Memorial High School Old Gym located in Fishersville, Virginia. The scope of work requires the provision of structural, brick veneer, expansion joint, and masonry repair services, specifically including the installation of engineered structural anchors to connect the roof structure to existing Concrete Masonry Unit walls to prevent lateral displacement. All work must strictly adhere to the stamped repair drawings prepared by DMWPV Engineers. The contract is expected to be awarded on November 6, 2026, with work beginning around January 4, 2027. Bids will be evaluated based on best value, considering price, schedule, experience, past performance, and completeness. Qualified contractors must submit firm-fixed line item pricing and a Contractor Data Sheet including three references from the last three years. The agreement is governed by the laws of the Commonwealth of Virginia and requires compliance with the Virginia Public Procurement Act, the Americans with Disabilities Act, and various non-discrimination and equal opportunity regulations. Contractors must maintain appropriate workers' compensation insurance and adhere to strict environmental management and hazardous material handling protocols, including the provision of Material Safety Data Sheets. Sealed bids must be delivered in person to the Augusta County Maintenance Department by the November 3, 2026, deadline, as electronic submissions are prohibited.
Augusta County Public Schools

POSTED

1 day ago

DEADLINE

in 14 days

General Info

NAICS

238140 - Masonry Contractors

Place of Performance

US Army Corps of Engineers, Gavins Point Project, located 5 miles SW of Yankton, SD, CROFTON, NE, 68730, USA

Set-Aside

SBA

Documents

7

Front_Elevation.pdf

PDF

Lake_Yankton_drawing.pdf

PDF

Overlook_C_drawing.pdf

PDF

Overlook_Shelter_drawing.pdf

PDF

Project_location_drawing.pdf

PDF

RFQ.pdf

PDF

Split_face_block_drawing.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts

Full Description

Show more
GAVINS POINT PROJECT MASONRY SEAL 1. SCOPE OF WORK: Contractor shall be responsible for all labor, material and equipment required to power wash clean and seal the exterior masonry split face block walls with an approved masonry seal material listed in the specification enclosed. Work will be done on a number of buildings at various locations, approximate surface area to be sealed is 15,000 sf. 1.6.7 All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes. No background checks are required for this contract. 1.6.8 Special Qualifications The Contractor must pre-screen Candidates using the E-verify Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file. 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: The Contractor will be required to commence work under this contract after receipt of award, and to complete the work by 26 August, 2016. The time stated for completion shall include final cleanup of the premises. 3. CONTRACT DRAWINGS AND SPECIFICATIONS: Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work but they shall be performed as if fully and correctly set forth and described in the drawing and specifications. The Contractor shall check all drawings furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. 4. SITE VISIT: Offerors or quoters are strongly urged and expected to inspect the site where the work will be performed. Contact Mike Callaghan at 402-667-2563, or Curt Bisgard at 402-667-2565 to arrange for a site visit. 5. APPROVAL OF MATERIALS: Mike Callaghan shall approve all materials before being used in subject contract. 6. SPECIAL REQUIREMENTS: Contractor shall apply the siloxane water repellant as per the manufactures recommendation as well as the attached specification. 7. Not Used. 8. PROTECTION OF EXISTING FACILITIES: Contractor shall be responsible for protection of the existing structures glass and metal from overspray of sealant material. In the event of contact of overspray on the glass or metal the surface shall be washed immediately with soap and water to remove the overspray. 9. ENVIRONMENTAL PROTECTION: In order to prevent, and to provide for abatement and control of any environmental pollution arising from the construction activities in the performance of this contract, the Contractor and his sub contractors shall comply with all applicable federal, state and local laws and regulations concerning environmental pollution control and abatement. a. Notification: The Contracting Officer will notify the Contractor in writing of any non compliance with the aforementioned federal, state or local laws or regulations. Such notice, when delivered to the Contractor or his authorized representative at the site of the work, shall be deemed sufficient for the purpose. The Contractor shall, after receipt of such notice, immediately inform the Contracting Officer of proposed corrective action and take such action as may be approved. If the Contractor fails or refuses to comply promptly, the contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall make the subject of a claim for extension of time or no part of the time lost due to any such stop orders for excess costs or damages. 10. SAFETY REQUIREMENTS: The Contractor shall ensure that safe working practices are utilized and that all equipment meets the requirements of the US Army Corps of Engineers, "Safety and Health Requirements Manual", EM 385 1 1, September 2008, before work begins. A copy of the above manual is available at the Gavins Point Project Office, 55245 Highway 121, Crofton, NE. a. Ground Fault Circuit Interrupters: In addition to the requirements of paragraph 11.C.05 of EM 385 1 1, ground fault circuit interrupters are required for all extension cord systems. b. First Aid and Medical: First aid facilities shall be made available on the job site. Arrangements for emergency medical attention shall be made prior to start of work. All emergency numbers (doctor, hospital, ambulance, fire department) shall be posted, or made available at the work site. 11. HOUSEKEEPING: Daily clean up of all debris and waste materials are required. Debris shall be removed on a regular basis as contractor's responsibility to dispose of off project site. 12. AVAILABILITY AND USE OF UTILITY SERVICES: Use of public and private utilities will be as found available. The Contractor shall make his own arrangements for use of public and private utilities. 13. WORK AND MATERIALS GUARANTEE: The Contractor will guarantee materials for one year from the date the Government assumes use of the equipment or materials. 14 PAYMENT: Payment for subject work will be for entire work complete in conformance with this specification and drawings, and paid within 30 days of acceptance by the Government and receipt of a proper invoice. Section 07 19 23 Siloxane Water Repellants PART 1. GENERAL 1.01 SUMMARY A. Section Includes: Siloxane Water Repellents Specifier Note: Article below may be omitted when specifying manufacturer's proprietary products and recommended installation. Retain Reference Article when specifying products and installation by an industry reference standard. If retained, list standard reference in this section. Indicate issuing authority name, acronym, standard designation and title. Establish policy for indication edition date of standard referenced. Conditions of the Contract or Division 1 References Section may establish the edition date of standards. This article does not require compliance with standard, but is merely a listing of references used. Article below should list only those industry standards referenced in this section B. Related Sections: 1. Section 0400-Masonry 1.02 REFERENCES A. American Society for Testing and Materials (ASTM) 1. ASTM E-514 Standard Test Method for Water Penetration and Leakage through Masonry B. National Cooperative Highway Research Program (NCHRP) 1. NCHRP Report 244 Reduction of Chloride Ion Uptake 1.03 SUBMITTALS A. General: Submit Listed Submittals in accordance with Conditions of the Contract and Division 1 Submittal Procedures Section. B. Product Data: Submit manufacturer's product data and installation instructions. C. Quality Assurance/Control Submittals: Submit the following: 1. Certificates: Submit certificate that applicator complies with the requirements of this section. 1.04 QUALITY ASSURANCE. A. Applicator Qualifications: Utilize an applicator trained and approved by waterproofing manufacturer. 1.05 DELIVERY, STORAGE, & HANDLING A. General; Comply with Division 1 Product Requirement Section B. Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact. C. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer. 1.06 PROJECT/SITE CONDITIONS A. Environmental Requirements: Comply with application temperature range 40- 950F B. Substrate shall be rain free 24 hours prior to application and 24 hours after application. C. Substrate shall be power washed to remove mold, dirt and other debris, then allowed to dry 24 hours prior to application of sealant. 1.07 WARRANTY A. Waterproofing Warranty: Product has a five (5) year material warranty. Manufacturer's warranty shall be independent from any other warranties made by the Contractor under requirements of the Contract Documents and may run concurrent with said warranties. Should the product fail to perform as specified the manufacturer shall reimburse the purchase price of the material used or supply new material for replacement. PART 2 PRODUCTS. 2.01 SILOXANE WATER REPELLENT A. Manufacturer: Applied Technologies, LLC , better than or equal to. B. Proprietary Products/Systems to be purchased directly from Applied Technologies by Applicator. C. Siloxane Water Repellants include the following: 1. A-Tech Masonry & Brick Sealer a. Material: Water-based emulsion siloxane water repellent b. Siloxane Content: 7-10% c. Application Method: [Brush] [Roller] [Sprayer] d. Color: Milky white, dries clear e. Active Content: 100% f. Freeze Point: 320F g. Coverage Rate: 1 gallon/100 ft2 h. Water Penetration and Leakage: (ASTM E-514): 83% average reduction i. Chloride Ion Uptake: (NCHRP Report 244): 77% reduction 2.02 LIMITATIONS A. Will not prevent water through cracks, defects or open joints B. Mortar and concrete shall be cured for 28 days prior to use 2.03 TESTING A. Test a minimum 3' x 3' area on each type of masonry. Use the manufacturer's application instructions. Let test area cure before inspection. Keep test panels available for comparison throughout application procedure. PART 3. EXECUTION 3.01 MANUFACTURER'S INSTRUCTIONS A. Comply with the most current written installation instructions and recommendations of the waterproofing manufacturer. 3.02 EXAMINAITON A. Site Verification of Condition: 1. Verify that conditions are acceptable for application of the waterproofing system. 2. Do not proceed with the application until unacceptable conditions are corrected. a. Substrate must not have rain for 24 hours prior to application b. Substrate must not have rain for 24 hours after application c. Site temperatures must be above 400F during and after application 3.03 PREPARATION A. Surface Preparation: 1. Ensure that surfaces to be coated are structurally sound and free of moisture, dust, loose materials, frost, loose mortar or any materials or obstructions that would be detrimental to the penetration of the sealer, this shall be accomplished by power washing the substrate prior to the application. 3.04 APPLICATION A. Stir before use. Do not dilute. So not apply in high winds. Protect glass and metal from coverage. Wash off with soap and water. 1. Vertical Application: Spray, brush or roll sealer onto substrate starting at bottom of area. Maintain 6-8" run down of sealer. Protect coated areas for 24 hours from rain. 2. Horizontal Application: Spray, brush or roll sealer onto substrate. Maintain even coating and spread out any ponding that may occur prior to curing. Protect coated areas for 24 hours from rain. 3.05 CLEAN UP A. Clean any over application of sealer off glass and metal with soap and water before drying. Six drawings are attached as a separate document

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS