Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

CLSU J-475-DB Campus Infrastructure Phase III

Active
PE-47200-RFQ-2027-000000153State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Board of Regents of the University System of Georgia is soliciting proposals for design-build services for Project No. J-475-DB, Campus Infrastructure Phase III, located at Clayton State University in Morrow, Georgia. This solicitation, identified by number PE-47200-RFQ-2027-000000153, requires interested parties to submit their responses by September 15, 2026. Primary contact for the project is Mr. Scott Bailey, and all submissions must be uploaded via the specified USG file sharing system using the provided Egnyte link. Proposals must include detailed cost breakdowns as specified in the provided exhibits. Exhibit D requires a comprehensive breakdown of preconstruction costs and expenses, including labor, materials, and subcontractor costs. Exhibit E requires a detailed general conditions breakdown covering site supervision, management, office expenses, and safety and security. It is critical that these costs are categorized correctly, as any attempt to recategorize these expenses as fees or costs of work will result in a proposal being deemed non-responsive.

General Info

Design-build proposals for Clayton State University infrastructure due September 15, 2026.

Agency

Board Of(university System of Georgia) RegentsView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(9)

Exhibit G _ Proposer_s Disclosure Statement.doc

DOC

_CLSU J_475 DB RFQ_RFP.pdf

PDF

Exhibit B _ Contractor Affidavit.docx

DOCX

Exhibit C _ DB Fee Proposal.docx

DOCX

Exhibit F _ Project Cost Matrix.xlsx

XLSX

Exhibit A _ Certification Form.docx

DOCX

USG File Sharing Upload Instructions

PDFother

Exhibit E - General Conditions Breakdown

XLSXcost-breakdown

Exhibit D - Preconstruction Cost and Expenses Breakdown

XLSXexhibit

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
Contacts1 person available
OfficeN/A
Organization / Agency
Board Of(university System of Georgia) Regents
View Agency Profile
Office AddressN/A
Contacts
Mr. Scott Bailey

Full Description

Show more
Design-Build Services for Project No. J-475-DB, Campus Infrastructure Phase III, Clayton State University, Morrow, Georgia. Please see the attached documents for project information and upload instructions. Questions about any aspect of the RFQ or the project should be submitted in writing to the contact listed above.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
The Northlands Job Corps Center, operated by Education and Training Resources (ETR), is soliciting bids for a firm fixed price subcontract to perform comprehensive bathroom renovations in two dormitory buildings located in Vergennes, Vermont. The project involves the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade shower pans, vitreous China toilets, high-pressure plastic laminate countertops, porcelain flooring, and LED lighting. All work must comply with ADA, OSHA, and applicable building, plumbing, and electrical codes, including the National Electrical Code and NFPA 101 Life Safety Code. To maintain center operations, contractors must renovate the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. To be considered, responses must include a completed bid sheet, a detailed cost breakdown separating materials and labor, a proposed project schedule, and proof of current Vermont state professional licensing. The winning bidder must maintain an active registration in SAM.gov with a Unique Entity ID. Depending on the contract value, payment and performance bonds may be required for projects exceeding 35,000 dollars. Additionally, contractors must provide certificates of insurance for Builders Risk, Automobile, Liability, and Workers Compensation, and certify compliance with the Davis Bacon Act and prevailing wage laws. Payment terms are net 30 days upon satisfactory receipt of services and a proper invoice. ETR serves as the sole judge for award selection, and the lowest bid does not guarantee a contract award.
Northlands Job Corps Center /ETR

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. involves the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project spans 1828 calendar days and encompasses the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. Key structural elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundation features such as rigid inclusions and load transfer mats. Additionally, the scope includes the construction of a new Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The comprehensive scope of work requires pricing for a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, roofing, mechanical, electrical, plumbing, and fire protection. Site preparations involve clearing, rock excavation, and grading, with specific requirements for wetland mitigation. Infrastructure improvements include the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB, with a response deadline of October 31, 2026.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

NAICS: 238160
SLED
GGC J-449-DB, Building B-Roof Replacement
Solicitation # PE-47200-RFQ-2027-000000152
The Board of Regents of the University System of Georgia and Georgia Gwinnett College are soliciting design-build services for Project No. J-449-DB, which involves the roof replacement of Building B in Lawrenceville, Georgia. This solicitation, identified by number PE-47200-RFQ-2027-000000152, requires a comprehensive proposal that includes detailed cost breakdowns for preconstruction and construction overhead, as well as a fixed fee proposal covering design consultants, preconstruction, and construction fees. The scope of work encompasses site operations, including the deployment of equipment, temporary utilities, workforce logistics, and safety compliance. Proposers must adhere to strict legal and ethical certifications, including the submission of a Certification Form affirming the absence of felony convictions or debarments within the last five years and a Proposer's Disclosure Statement to identify potential conflicts of interest. A critical requirement is compliance with O.C.G.A. § 13-10-91(b)(1), necessitating the use of the E-Verify system for all employees and subcontractors. Proposals must be submitted by September 8, 2026, via the designated USG file sharing website. The selection process emphasizes transparency and regulatory adherence, with specific cost matrices provided to ensure proposals are responsive and properly categorized.
Roofing Contractors

POSTED

7 days ago

DEADLINE

in 14 days
View Details