Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on December 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CM and INSPECTION SERVICES FOR THE SOUTH SAN FRANCISCO BRIDGE REPAIRS PROJECT

Closed
ST1703 BPMPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 3 hours ago

DEADLINE

N/A
NAICS: 541330
New
SLED
Request for Qualifications - Conn Dam Stability Assessment, Spillway Improvements, and Feasibility Alternatives Study
Solicitation # 2026-RFQL-054
The City of Napa Utilities Department is seeking a qualified consulting team through Request for Qualifications 2026-RFQL-054 to perform a stability assessment, spillway improvements, and a feasibility alternatives study for the Conn Dam. The project is driven by requirements from the California Department of Water Resources Division of Safety of Dams (DSOD), which identified that the existing spillway does not meet current Probable Maximum Flood (PMF) design criteria and raised concerns regarding the long-term geotechnical stability of the dam embankment. The selected consultant will be responsible for conducting comprehensive subsurface explorations, performing static and seismic slope stability evaluations, and recommending alternatives to mitigate spillway deficiencies. Additionally, the scope includes evaluating options to increase reservoir storage capacity to enhance water supply reliability and flood protection, while supporting future U.S. Army Corps of Engineers (USACE) feasibility studies. This procurement follows a Qualifications-Based Selection process per the Brooks Act, where the award is based on technical capability and experience rather than cost. Evaluation is a two-step process consisting of a Statement of Qualifications weighted at 70 percent and optional oral interviews weighted at 30 percent. A critical project milestone is the submission of a comprehensive geotechnical investigation report to the DSOD by December 31, 2028. The contract requires strict adherence to federal and state regulations, including 2 CFR Part 200 Uniform Guidance, the Build America Buy America Act, and various civil rights and accessibility certifications. Statements of Qualifications are due by October 29, 2026, via the City's Opengov procurement portal.
Utilities Department

POSTED

about 4 hours ago

DEADLINE

in about 5 hours

AI Contract Overview

Show more

The contract involves construction management and inspection services for the South San Francisco Bridge Repairs Project, which is expected to commence in early Summer 2026 and last approximately nine months. A critical component of the project is ensuring effective public notification to allow ample time for the community to prepare for the impacts of the bridge repairs. The project is managed by the Public Works/Engineering Division in California, with the office located in South San Francisco. The solicitation emphasizes the need for contractors with experience in creek diversion systems and the ability to monitor and sample water quality, including preparing and submitting related reports. The response deadline for the solicitation is January 29, 2026. The primary point of contact for this contract is Lawrence Henriquez, a Senior Civil Engineer. The contract is publicly solicited and aims to secure expertise that ensures environmental compliance and community engagement throughout the repair process.

General Info

Contract for South San Francisco Bridge repairs, including construction management, water quality monitoring, and public notification.

Documents

5

100% Plans for SSF BPMP 7 Bridge Repairs

PDF, High priority: read this first15 pages · specifications
High

2021097 SSF BPMP 7 Bridge Repairs Engineer's Estimate

PDF, High priority: read this first4 pages · engineers-estimate
High

Appendix A - Proposal Requirements for ST1703 BPMP 9 Bridges RFP CM Services

PDF, High priority: read this first2 pages · sow
High

Appendix B - Proposal Evaluation Criteria for City of South San Francisco RFP

PDF, High priority: read this first2 pages · proposal-evaluation
High

South SF BPMP Bridge Repairs Project No. ST1703 Bid No. 2710 Proposal Forms and Bid Schedule

PDF, High priority: read this first302 pages · rfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works/Engineering Division
Contacts1 person available
OfficeSouth San Francisco, CA, 94080, USA
Office AddressSouth San Francisco, CA, 94080, USA
Contacts
Lawrence HenriquezSenior Civil Engineer

Interested Companies (25)

EntramPORT CHARLOTTE, FL
MNS EngineersSanta Barbara, CA
ConstructConnectCincinnati, OH

See All 25 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
1.) Public noticing will be very important in providing ample time for the public to prepare for the bridge repairs. The South SF Bridge Repairs Project is expected to have a construction duration of nine (9) months and is tentatively set to begin in early Summer 2026. 2.) Experience in handling creek diversion systems and monitoring/sampling water quality including the submission of water quality reports is highly desireable.

More opportunities from California → Public Works/Engineering Division

Same awarding agency

NAICS: 237110
SLED
2027 Sanitary Sewer Spot Repair and Rehabilitation Project
Solicitation # SS2601
The 2027 Sanitary Sewer Spot Repair and Rehabilitation Project (Solicitation SS2601) is a public works contract issued by the City of South San Francisco, California, for sewer infrastructure improvements within the Sunshine Garden, Lindenville, and Orange Park neighborhoods. The scope of work includes sanitary sewer inspection, point repairs, open trench replacements, pipe bursting, manhole rehabilitation or replacement, and the reconnection of existing laterals. The project involves a base bid estimated at 4.95 million dollars and an alternate bid estimated at 627 thousand dollars. Key deliverables include pre- and post-construction CCTV inspections with detailed PDF reporting and full site restoration of pavement, sidewalks, and landscaping. The contract is awarded to the responsive bidder with the lowest total base bid. Work must commence within 15 calendar days of contract approval and be completed within 115 working days, with a specific requirement that Phase 1 work be finished by May 1, 2027. The project adheres to Caltrans State Standard Specifications and requires compliance with prevailing wage laws under the California Labor Code. Bidders must provide a bid bond of at least 10 percent of the bid, as well as performance and payment bonds equal to the contract amount. Technical standards include adherence to ASTM D3350 and F714 for HDPE pipes and UPC standards for pipe-bursting. Administration is managed by the Public Works/Engineering Division, with specific notice requirements for material and work inspections ranging from 24 hours to 5 working days.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 15 days
View Details
NAICS: 237110
SLED
Oyster Point Sanitary Sewer Pump Station Relocation
Solicitation # SS2202
The Oyster Point Sanitary Sewer Pump Station Relocation project (Project No. SS2202, Bid No. 2723) is a public works initiative by the City of South San Francisco located at the Oyster Point Marina. The scope of work involves relocating and upgrading an existing vacuum and ejector pump station to a traditional pump station, relocating electrical switchgear serving the eastern marina, installing new ejector pumps at each marina facility, and implementing a new collection force main system. Additionally, the project requires installing a new pump ahead on the public dock, decommissioning the existing pump station, and abandoning the current vacuum main system. The Engineer's Estimate for the project is 5.16 million dollars, and a Class A Contractor's license is required for performance. The contract is structured with a total completion time of 300 working days, divided into a two-stage work order: Stage 1 focuses on submittals and permits within 50 working days, followed by Stage 2, which consists of four construction phases. Liquidated damages for delays are set at 3,600 dollars per calendar day. Key technical requirements include asbestos abatement for twenty pipe flange gaskets following OSHA and EPA standards, adherence to a Construction and Demolition Waste Management Plan requiring 65 percent non-inert waste diversion, and compliance with groundwater discharge permits. The contract will be awarded to the lowest responsive and responsible bidder, with payments for semi-final and final estimates due within 30 calendar days of issuance.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS