Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Virginia was posted on April 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CM at Risk Delivery of JCC New General Services HQ - Part 2 of 2

Closed
20240819-RFPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262, as well as associated buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. This single firm fixed price contract involves comprehensive renovations including the replacement of corridor and classroom flooring with composite modular materials, full restroom remodeling with new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, upgrading lighting controls, and installing new signage. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited then negotiate methodology, evaluating price alongside corporate relevant experience and past performance from the previous five years. Proposals are due by November 18, 2026, and must include a detailed cost breakdown via Exhibit A. Key administrative requirements include a bid guarantee of 20 percent of the bid price or 3 million dollars, strict adherence to FLETC safety and hazardous waste management plans, and mandatory background checks for personnel accessing sensitive areas.
Bristol Alliance of Companies

POSTED

29 minutes ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the project requires a full NFPA-compliant fire suppression system, replacement of electrical distribution and lighting, building automation controls, and site improvements including paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract is awarded based on the lowest price, with pricing required for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to the Davis-Bacon Act and Buy American requirements, and the project must comply with ADA accessibility guidelines. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for proposals of 150 thousand dollars or more. Invoicing must be processed through Wide Area Workflow. Quality control is managed via a three-phase process, and final acceptance is contingent upon a series of on-site inspections and the submission of comprehensive technical documentation and closeout manuals.
Bristol Alliance of Companies

POSTED

29 minutes ago

DEADLINE

in 17 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

30 minutes ago

DEADLINE

in 23 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the areas to their original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Bidders must be small businesses or certified socio-economic categories and must provide a valid Massachusetts Contractor's License, a detailed cost breakdown, and a minimum 90-day bid guarantee. Contractors must comply with the Davis-Bacon Act, including specific minimum wage requirements and paid sick leave mandates. Safety and regulatory compliance are mandatory, adhering to OSHA, EPA, NFPA-101 life safety codes, ADA standards, and local Massachusetts building codes. Required insurance includes automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence. Final acceptance is contingent upon a substantial completion walk-through, a one-year material and workmanship warranty, a 20-year product warranty for LVP flooring, and the release of liens from all subcontractors.
Grafton Job Corps

POSTED

30 minutes ago

DEADLINE

in 10 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged spaces to safe residential use, specifically targeting sixteen residential rooms and associated bathrooms, common areas, and mechanical rooms. Key deliverables include the installation of approximately 13,390 square feet of fire-rated drywall, 2,000 square feet of vinyl plank flooring, sixteen half-height room partitions, and specific insulation requirements of R-49 for attics and R-19 for walls and ceilings. The contractor is responsible for all labor, materials, equipment, and supervision, as well as testing all restored mechanical, plumbing, electrical, and life-safety systems to obtain required inspection approvals. This solicitation is set aside for Small Businesses and various SBA-certified categories. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing that remains firm for 60 days. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of award. Final acceptance is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty along with all manufacturer warranties and test records.
Career Systems Development Corporation

POSTED

30 minutes ago

DEADLINE

in 13 days

AI Contract Overview

Show more

James City County is issuing a Request for Proposal (RFP) for the Construction Manager at Risk (CMAR) delivery of its new General Services Headquarters Building, with proposals limited to firms that have been pre-qualified through a competitive RFQ process. This procurement is part of a two-step, qualifications-based selection process authorized by Virginia law, emphasizing teamwork between the construction manager and the architect to achieve project goals and adhere to schedule and performance standards. The RFP outlines the minimum performance criteria and encourages collaborative efforts to ensure the successful completion of the project. The project is designated under NAICS code 236220, indicating commercial building construction, and is managed by James City County in Virginia. The deadline for submitting proposals is May 23, 2024, with the primary contact being Jessica Yost, reachable via email or phone. Interested firms can access additional details and the bidding portal through the county’s official website. This project aims to deliver a modern, efficient headquarters that meets the county’s operational needs while fostering a cooperative construction environment.

General Info

Documents

2
XLSX, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → James City County
Contacts1 person available
OfficeN/A
Organization / AgencyVirginia → James City County
Office AddressN/A
Contacts
Jessica YostGovernment Official

Full Description

Show more
James City County is seeking competitive proposals from pre-qualified Offerors, selected as part of the evaluation process for RFQ 20240819, to provide Construction Manager at Risk Delivery of the New James City County General Services Headquarters Building in accordance with all terms, conditions and specifications as set out in this Request for Proposal (RFP).  ONLY FIRMS WHO HAVE BEEN SHORTLISTED AS PART OF THE RFQ PROCESS MAY SUBMIT A PROPOSAL. This is the second step of a two-step qualifications-based competitive negotiation process as authorized by Section 2.2-4382 of the Code of Virginia and James City County’s adopted written procedures governing the selection, evaluation, and award of CM at Risk contracts. This RFP sets forth the minimum performance criteria for the Work and services to be provided by the CM.  By utilizing the Construction Manager at Risk construction delivery method, it is intended and expected that the CM and the A/E shall work in the spirit of teamwork to ensure the Project goals and schedule are met to support the Owner’s program.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS