CITY OF FORT WORTH NOTICE TO OFFERORS
CONSTRUCTION MANAGER-AT-RISK (CMAR)
200 Texas Street Renovations
Electronic submittal of (“Proposals”) from Construction Manager-at-Risk (CMAR) Offerors to perform
pre-construction and construction services for the 200 Texas Street Renovations (“Project”) located
at 200 Texas Street Fort Worth, Texas, will be received by the Purchasing Office, Fort Worth City
Hall, through the Bonfire website accessed by logging into :
https://fortworthtexas.bonfirehub.com/login , until 2:00 P.M., Thursday, October 31, 2024, and will
be opened and publicly read aloud at that time in the Council Chambers at 200 Texas Street. CMAR
Offerors may access the Instructions to Offerors, any Addendum, Sample Contract, General
Conditions, and any other related documents through the City’s Bonfire website.
A Pre-Proposal Conference and tour of the building will be held Tuesday October 8 at 9:00AM at
Property Management Department, Facilities Division office Room T107, 200 Texas Street, Fort Worth,
76102. Enter the building from the North entrance. Please email your questions to through the
City’s Bonfire website and can be accessed by logging on to the following link
https://fortworthtexas.bonfirehub.com/login
The total construction cost is anticipated to be approximately $26,000,000.00.
The architect retained by the City to act as the City’s representative is: Elements of
Architecture.
Written questions may be submitted via the Bonfire portal. The deadline to submit questions is
close of business on the Tuesday immediately prior to the date Proposals are due. Questions will
not be answered directly and if any answer is forthcoming, it shall be summarized so as to not
reveal the identity of the entity asking and provided to registered interested parties via
addendum, which shall also be posted in Bonfire.
The last day for questions from prospective Offerors is by 5:00 PM on Tuesday, October 22, 2024. A
final Addendum will be posted Thursday, October 25, 2024.
The City will select the CMAR Contractor by using a one-step process. After evaluating the
submitted Proposals from the CMAR Offerors, the City will shortlist, and may interview up to three
Offerors. The City will select the Offeror offering the best value for the City and enter into
contract negotiations which may include scope or time modifications and any price change associated
therewith.
The selected CMAR Contractor will provide Pre-Construction Services including Constructability
Reviews, Value Engineering Recommendations and Estimating Services Fees to review during the
various phases of the design process. The CMAR contractor shall, during the Pre-Construction
Services phase, work with the City’s Architect to complete the design documents and publicly
procure its trade contractors for the major work elements to develop a Guaranteed Maximum Price
(GMP) and construction performance period for the work. This GMP will be inclusive of Value
Engineering and Estimating Services fees, General Conditions, Construction Manager’s Fee,
contingency, bonds, insurance, and other agreed upon costs; plus, the Owner’s Contingency
Allowance. The Offeror will add a 7.5% Owner’s Contingency Allowance on a separate line item on the
Proposal form and only the Owner will approve the use of this allowance during construction. Any
Allowance remaining at the end of construction will be retained by the City of Fort Worth. This
Allowance is not to be included in the Base Proposal and will not be used in the CMAR selection
process. Please refer to the “Project Proposal Form” found in the Instructions to Construction
Manager-At-Risk (CMAR) Offerors.
The City of Fort Worth intends to negotiate a Pre-Construction Services Contract and a Construction
Services Contract, with the selected CMAR firm for the two major phases of this Project.
The Business Equity goal is 25% for the estimated construction budget. There is no goal for the
Pre- Construction Services. The goal will be applied to the GMP when the GMP agreements are
reached. Offerors must submit an anticipated M/WBE Utilization Plan with their CMAR Proposal
submittal. The Business Equity Utilization form and Goal Requirements are included in the project
documents in the Bonfire folder. The submitted Utilization Plan will be part of the weighted
selection criteria. Refer to Instructions to Construction Manager-at-Risk (CMAR) Offerors for
additional information. Contact the Department of Diversity & Inclusion Office at
+1 (•••) •••-••••Sign up to see this detail
or email
•••••@•••••.•••Sign up to see this detail to obtain a list of certified subcontractors and
suppliers.
Also, Refer to Section 3. BUSINESS EQUITY PROVISIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR)
SOLICITATION
The selected CMAR Contractor will be required to provide Payment and Performance Bonds and provide
Contractors General Liability and Statutory Workers Compensation Coverage once the GMP is agreed
upon.
Advertisement Date: September 26, 2024
October 3, 2024
Submissions must be uploaded, finalized and submitted on or prior to the due date. The City
strongly recommends allowing sufficient time to complete the submission process (ideally a week
before the deadline) to begin the uploading process and to finalize your submission to give
adequate time in the event an issue arises. Uploading large documents may take time, depending on
the size of the file(s) and your Internet connection speed. The Bonfire portal can be accessed
using Microsoft Edge, Google, and Chrome.
Electronic submission is subject to electronic interface latency, which can result in transmission
delays. All respondents assume the risk of late transmission/submission. The City shall not be held
liable if a respondent is unable to submit a complete submittal before the on or before the
deadline due to transmission delays or any other technical issues or obstructions.
All submissions must be submitted electronically prior to the close date and time under the
respective Project via the Bonfire Procurement Portal:
https://fortworthtexas.bonfirehub.com/portal/?tab=openOpportunities.
Failure to submit all required information listed in the Solicitation will be grounds for rejection
of a submittal as non-responsive. No late submittals shall be accepted. Submittals delivered in any
manner other than using the Bonfire Procurement Portal will not be accepted or considered.
If, upon being opened, a submission is unreadable to the degree that material conformance to the
requirements of the procurement specifications cannot be ascertained, such submission will be
rejected without liability to the City, unless such bidder provides clear and convincing evidence
(a) of the content of the submission as originally submitted and (b) that the unreadable condition
of the Electronic Bid was caused solely by error or malfunction of the Bonfire Platform or its
Procurement Portal. Failure to scan a clear or readable copy of a bid into the system does not
constitute and shall not be considered an error or malfunction of the Bonfire Platform’s
Procurement Portal. Respondents are encouraged to fully review each page of every document of their
submission package prior to final submittal thereof to ensure all documents are clear, legible, and
complete.
For technical questions, visit Bonfire’s help forum at https://vendorsupport.gobonfire.com/hc/en-us
Contact the Bonfire support team at
•••••@•••••.•••Sign up to see this detail or by calling
+1 (•••) •••-••••Sign up to see this detail.
To get started with Bonfire, watch this five-minute training video:
Vendor Registration and Submission [VIDEO] – Bonfire Vendor Support (gobonfire.com)