Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CMR for Texas Finance Commission – New Building

Closed
0008789State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a subcontracting opportunity with Adams and Associates, Inc., operating for the U.S. Department of Labor at the Grafton Job Corps Center in North Grafton, Massachusetts. The project requires the multi-floor water damage restoration of Building 17, which houses dormitory, administrative, medical, and dental facilities, following a fire sprinkler discharge on June 13, 2026. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the affected areas to their original condition. All work must comply with ADA, OSHA, EPA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60%), quality (20%), past performance (10%), and schedule (10%). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026, including a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of $13.65 per hour and specific paid sick leave provisions. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return them to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100. Proposing contractors must provide itemized pricing by room and trade, a detailed work plan addressing project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include the provision of payment and performance bonds for the full project value, as well as general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate, all due within ten days of award. Final acceptance by CSD is contingent upon the successful testing of all restored systems, removal of debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. Key construction activities include replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new vanities and lavatories, and updating doors and life-safety components. Technical upgrades include the installation of raised flooring and electrical distribution for classrooms, the replacement of variable air volume systems, and the implementation of new lighting controls and ceiling fans. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by November 18, 2026, and must be submitted electronically to the contracting officer. Award evaluation is based on price, past performance, and corporate relevant experience, with non-cost factors holding equal importance to price. The contractor is required to provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. All work must comply with ADA accessibility guidelines, Buy American requirements, and FLETC safety and hazardous waste management plans.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a project to repair and modernize the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing, and exterior wall systems. Interior improvements involve reconfiguration, new finishes, epoxy mortar flooring, and the installation of wire mesh partitions. Critical system upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be evaluated based on the lowest price for two primary line items: building renovation and paving work. Award requirements include tiered bonding based on proposal value, adherence to the Davis-Bacon Act, and compliance with the Buy American Requirement. Contractors must implement a government-approved Quality Control Plan utilizing three phases of control and submit monthly invoicing through Wide Area Work Flow. All work must meet ADA accessibility guidelines and specific cybersecurity standards for facility-related control systems.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Texas Facilities Commission is soliciting a Construction Manager-at-Risk (CMR) for Project 26-029-2597 to provide pre-construction and construction management services for the Texas Finance Commission Office Building at 3608 Jackson Ave, Austin, Texas. The scope of work includes the demolition of the existing Building 10 and associated surface parking, followed by the construction of a new 63,500 square foot three-story building and a new surface parking area with 230 spaces. The estimated cost of work is 38,263,728 dollars, though respondents must demonstrate a bonding capacity of up to 55,000,000 dollars. The project timeline includes an estimated 365 calendar days for pre-construction and 365 calendar days for construction, with work commencing within 30 days of the Notice to Proceed. This procurement follows a two-step award process based on best value. Step one evaluates company experience, qualifications, methodology, and safety records, while step two requires pricing proposals from the top five or fewer ranked respondents. Pricing must include a not-to-exceed pre-construction management fee, a construction management fee as a percentage of the cost of work, and a not-to-exceed fee for general conditions. The contract is governed by Texas Government Code Chapter 2269, Subchapter F, and requires compliance with the Texas Prevailing Wage Law, HUB subcontracting goals, and domestic iron and steel certifications. Key deliverables include the development of a Guaranteed Maximum Price and the implementation of a Building Information Model (BIM) coordinated by a dedicated BIM Coordinator.

General Info

CMR for new 63,500 sq ft Austin office building costing approximately 38.3 million dollars.

Agency

Texas Facilities Commission

Place of Performance

TX, USA

Set-Aside

NONE

Documents

5
DOCX, High priority: read this firstpast-performance
High
DOCX, High priority: read this firstrfq
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstspecifications
High
ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Facilities Commission
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas Facilities Commission
Office AddressTX, USA

Full Description

Show more
1) SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to provide Pre-Construction and construction management services for the Texas Finance Commission Office Building located at 3500 Jackson Ave, Austin, TX 78731, hereinafter described as TFC Project # 26-029-2597 (the Project). This Project will be administered by TFC. This procurement will be a two-step award process with a two-part work requirement.a) Step One of the solicitation will include a submittal of company experience and qualifications focusing on projects of similar size and type. Respondents will be evaluated on experience and qualifications, as detailed in Section V, Submission Requirements.b) Step Two of the solicitation will include only the highest ranked five or fewer Respondents from Step One who will be asked to provide pricing.2) COST OF WORK: Respondents to the RFQ should consider the “Cost of Work” as thirty-eight million two-hundred sixty-three thousand seven hundred twenty eight dollars ($38,263,728), not including any Pre-construction Management fees, Construction Management fees, and Construction General Conditions, as part of the construction budget or the Guaranteed Maximum Price (GMP).3) CONTRACT TERM: Construction is required to commence within thirty (30) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be three-hundred sixty-five (365) calendar days. The construction contract period is projected for a term of three-hundred sixty-five (365) calendar days except as may be otherwise amended or negotiated. SECTION 2 - PROJECT DESCRIPTION1) PROJECT DESCRIPTION: The project is located at Camp Hubbard, 3608 Jackson Ave, Austin, TX 78731. The scope involves the demolition of the existing Building 10 and associated surface parking. Once the demolition is complete, contractor shall construct a new three-story building totaling 63,500 square feet. In addition, the contractor shall install a new surface parking area with 230 parking spaces to support the facility.2) ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ.3) THIRD PARTY TESTING: TFC shall provide or contract with third party for Testing and Balancing Services, RAS Review, Commissioning, and Construction Materials Testing.SECTION 3 - SCHEDULE OF EVENTS1) SCHEDULE OF EVENTS: TFC reserves the right to change the dates shown below upon written notification.EVENTDATEIssue RFQ9/15/2026Mandatory Pre-Submittal Teleconferences1st Pre-Submittal ConferenceOR2nd Pre-Submittal Conference 9/29/2026, 10:00 AMOR9/30/2026, 10:00 AMDeadline for Submission of Questions10/06/2026TFC’s Response to Questions10/08/2026Deadline for Submission of Qualifications and SP10/14/2026, 3:00 PMNotification of Short List Selection10/30/2026Site Visit (Mandatory)11/03/2026Deadline for Submission of Step 2 Pricing Proposals11/12/2026, 3:00 PM If interviews are NOT required by TFC Award by CommissionTBDExecute ContractTBD If interviews are required by TFC Notification of Interview Selection10/30/2026Interviews11/10/2026Award by CommissionTBDExecute ContractTBD

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS