CN-0915-24(BRJ) Stick Ross Loop

Open
CN-0915-24(RHJ)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cherokee Nation Department of Transportation and Infrastructure is soliciting bids for the Stick Ross Loop Phase 1 Project CN-0915-24(RHJ) in Cherokee County, Oklahoma. This fixed completion date contract involves the rehabilitation and bridge replacement of 2.58 miles of an asphalt county road, featuring a 24-foot wide roadway and a 3-12’x6’x36’ reinforced concrete box culvert. The scope of work includes the removal of salvaged materials, surface restoration, environmental protection, and the management of railroad-highway grade crossings. Performance must begin within 30 calendar days of the Notice to Proceed, and the contractor is required to provide a detailed quality control plan, an as-planned progress schedule, and an independent testing laboratory for materials verification. Bids will be awarded to the lowest responsible bidder whose proposal is in the best interests of the Nation, with a strong emphasis on Indian preference requirements. A mandatory pre-bid conference is scheduled for December 1, 2026, at the CNDOT building in Tahlequah; failure to attend will result in bid disqualification. Sealed bids must be submitted via Bid Express by 10:00 a.m. on December 22, 2026. Required documentation includes a bid bond, bidder qualifications, and TERO certifications. Upon award, the contractor must provide performance, payment, and maintenance bonds, as well as proof of comprehensive insurance. While the contract references various amended sections of the Federal Acquisition Regulations, it explicitly states that FAR requirements are not applicable unless expressly stated in the contract.

General Info

Bids for the Stick Ross Loop road rehabilitation and bridge replacement project.

Documents

4
PDF, High priority: read this first9 pages · request-for-approval-of-subcontractor
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority1 page · award
Low

Read all 4 documents

Due in 36 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 36 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 4 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → Cherokee Nation Department of Transportation & Infrastructure
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Date Bid Notice Issued November 16, 2026. Project Lat. 35°50’30.5”N Long. 94°59’45.9”W. The Cherokee Nation is seeking bids for the Stick Ross Loop Phase 1 Project CN-0915-24(RHJ). Located in Cherokee County, this project is 2.58 miles in length. This project is the rehabilitation and bridge replacement of 2.58 miles of an asphalt county road which consist of 24’ wide asphalt roadway including shoulders and a 3-12’x6’x36’ Lg RCB.
Project will be a Fixed Completion Date Contract consisting of: [See schedule of items] (See Part 2, Specifications, subsections 108.02, “Notice to Proceed and Preconstruction Conference” and 108.07.C, “Fixed Completion Date Contract”). Plans and Specifications are available for viewing at: www.bidexpress.com.
Attendance at the pre-bid conference is MANDATORY. A pre-bid conference shall be at 10:00 a.m. on December 1, 2026, at the CNDOT building at Cherokee Nation headquarters, approximately 3.5 miles south of Tahlequah, Oklahoma on Highway 62. A location map is included on the Bid Express website at www.bidexpress.com. Bids will not be accepted from Bidders who do NOT have a representative attending the pre-bid conference.
The Bidder must not make telephone or other oral inquiries concerning this Bid Notice or the Bid Proposal. All correspondence and questions regarding this Bid Notice and requests for additional information must be directed in writing on Bid Express under Q & A, no later than 5:00 p.m., December 8, 2026.
Responses to questions and any bid document updates and/or addendums will be posted on or before 5:00 p.m., December 15, 2026, on Bid Express at www.bidexpress.com. Failure of the Bidder to receive responses to questions shall not relieve the Bidder from any obligation under a bid as submitted.
SUBMISSION OF BIDS Bidders must complete Part 1 of the Bid Proposal Forms (See Instructions, p. 1 of this Part, Bid Proposal Checklist, p. 2-5 of this Part.). The original sealed Bid shall be submitted on the Bid Express website at www.bidexpress.com. The original Bid shall be completed on the website no later than 10:00 a.m. on December 22, 2026. Any bid received after this deadline will not be considered. The Bidder may modify or withdraw the Bid at any time prior to the bid submission deadline, provided such communication is received in writing by the designated contact person for this Bid Notice prior to the bid submission deadline. Cherokee Nation Department of Transportation, P.O. Box 948 Tahlequah, OK 74465.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Wright Ave. Bridge Demolition (Bid No. 26-20)
Solicitation # 26-20
The City of Fairborn, Ohio, is soliciting sealed bids for the Wright Avenue Bridge Demolition project, identified as Bid No. 26-20. The scope of work involves the permanent demolition and removal of the existing N. Wright Avenue Bridge over Hebble Creek, located northeast of 117 N. Wright Avenue, and the creation of a permanent termination of Wright Avenue. The contractor is responsible for the proper disposal of all waste and surplus excavated materials and must restore existing roadways to a condition equal to or better than their original state. The project is governed by the 2023 Standard Specifications of the State of Ohio Department of Transportation, the City of Fairborn Engineering Standards, and the Manual of Uniform Traffic Control Devices. The contract will be awarded to the lowest responsible bidder based on a base bid cost comparison. Bidders must provide a non-collusion affidavit and an experience statement as evidence of resources. Required security includes a performance bond and a bid bond or certified check payable to the City of Fairborn. The contractor must adhere to USDOL prevailing wage regulations, and failure to do so is considered a breach of contract. Additionally, the City of Fairborn must be listed as an additional insured on the contractor's liability insurance. While the specific completion date is located on the proposal form, any delays beyond that date will result in liquidated damages of 700 dollars per business day.
City of Fairborn

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237310
New
SLED
CMGC - 112T37CM D11 I-5/I-805 Express Lanes Corridor Project
Solicitation # 112T37CM
The I-5/I-805 Express Lanes Corridor Project is a Construction Manager/General Contractor (CMGC) initiative managed by the California Department of Transportation. Located in San Diego County, the project aims to modernize roadway infrastructure across the cities of San Diego, Chula Vista, National City, Del Mar, Solana Beach, Encinitas, Carlsbad, and Oceanside. The scope involves creating over 40 miles of continuous Express Lanes through the installation of pavement striping, signage, traffic safety elements, paving, and electrical components. The estimated cost for construction capital is 386 million dollars, with an additional 1 million dollars allocated for Right of Way capital and utility relocation. The procurement process utilizes a ranking system based on Statements of Qualifications (SOQs) and interviews to evaluate the legal, technical, financial, and management capabilities of proposers. The project is divided into a preconstruction services phase, which is a reimbursement contract not to exceed 2.5 million dollars, and a subsequent construction phase based on a unit price contract. Key requirements include compliance with Buy America regulations, Title VI of the Civil Rights Act, and strict safety reporting for the past three to five years. Proposers must submit a comprehensive SOQ in a three-ring binder by January 11, 2027, following a rigorous evaluation of experience, key personnel, and project approach.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Replacement of Bridge No. 104005, Grassy Hill Road over Unnamed Brook, Town of Old Lyme, CT
Solicitation # 49815
This project involves the replacement of Bridge No. 104005 on Grassy Hill Road over an unnamed brook in the Town of Old Lyme, Connecticut. The primary scope of work consists of replacing a twin pipe barrel culvert with a precast concrete box culvert, including a demolition plan and the installation of guide rails and pedestrian railings using DOT-approved chemical anchors. The project is governed by EJCDC Standard General Conditions and a stipulated price agreement, with technical requirements including the use of SCH B0 PVC conforming to ASTM D1785 and adherence to ADA Standards for Accessibility. Performance involves specific excavation and fill quantities as ordered by the Engineer, with a strict prohibition on blasting. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, evaluated based on total gross sum or unit price totals. Bidders must provide a bid bond, a statement of qualifications, and a non-collusion affidavit. Key compliance requirements include adherence to Connecticut Prevailing Wage Rate Laws, a Small Business Enterprise goal of 29.39%, and strict OSHA standards for temporary excavation and de-watering. The contractor is also required to maintain a progress schedule and ensure the site is in a clean and finished state prior to final inspection. Administrative oversight is managed by the Town of Old Lyme, with specific coordination required with CTDOT for encroachment permits.
Nathan L. Jacobson & Associates, Inc.

POSTED

about 4 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS