Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CNG Garage Bus Heater Replacement

Closed
23-24-019State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves comprehensive work to upgrade and maintain electrical and mechanical systems for the CNG Garage Bus Heater Replacement project for the Rialto Unified School District in California. The scope encompasses all labor, materials, equipment, and services necessary to complete the project in accordance with the contract documents and within the specified deadline, which is the Required Completion Date outlined in the Master Schedule. Key tasks include the demolition and removal of existing electrical components such as switchboards, distribution boards, lighting fixtures, and wiring, as well as the installation, testing, and balancing of air conditioning systems and related ancillary equipment. The work also involves site visits, coordination with authorities, verification of dimensions, and the preparation of accurate as-built drawings to ensure compliance and proper functioning. The project solicitation was posted on February 8, 2024, with a response deadline of March 1, 2024. It is categorized under NAICS code 238910, which pertains to electrical contractors and other wiring installation services. The primary point of contact for the project is Janet Lozano, reachable via email at [email hidden] or by phone at [phone hidden]. Interested parties can find additional details and submit responses through the provided online portal link. The contract aims to ensure a timely, compliant, and efficient upgrade of the garage's electrical and mechanical systems to support the district's operational needs.

General Info

Agency

California → Rialto Unified School District

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Rialto Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Rialto Unified School District
Office AddressN/A

Full Description

Show more
The Work consists of any and all labor, materials, goods, supplies, equipment, tools, utilities, temporary facilities, transportation, delivery services, and other services and things of any nature whatsoever as are expressly and impliedly necessary to timely and satisfactorily complete the Project: (i) in strict accordance with the Contract Documents; and (ii) not later than the Required Completion Date specified in the Master Schedule. The Work consists generally of the following:Electrical: demolition, project site visit, power outage schedule, clean/test existing electrical items,remove all existing switchboards, distribution boards, panel boards, lighting fixtures, conduits,wires, and other electrical apparatus designated as existing to be removed, remove all controlpanels, equipment racks, pull-boxes, terminal cabinets, etc.Mechanical: comply with legally constituted authorities; check and verify dimensions, sizes, andrequired clearances; supply/approve shop drawings; provide accurate as-built drawings; install ofaccess panels or other indicating equipment or specialties requiring reading, adjustment,inspection, repairs, removal or replacement, testing, adjusting, and balancing (tab) of the airconditioning systems and related ancillary equipment.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS