Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Coastal Resilience Master Plan

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Diego City Planning Department is implementing the Coastal Resilience Master Plan (CRMP) Phase 1 to mitigate risks from sea-level rise, coastal flooding, and erosion. The project focuses on developing a portfolio of nature-based solutions, including green infrastructure and natural restoration activities, to protect critical coastal habitats and maintain public access. While prioritizing nature-based approaches, the plan allows for hybrid designs incorporating gray infrastructure, such as seawalls or storage tanks, where necessary for risk mitigation. The initiative prioritizes solutions that provide multiple benefits, including water quality improvements, habitat protection, and increased access for Communities of Concern, in alignment with the Climate Resilient SD Plan. The scope of work involves a conceptual evaluation of ten coastal locations, narrowing them down to six feasible sites. For these six locations, the city will develop up to three detailed concepts and produce a Program Environmental Impact Report (PEIR). One selected location will be further developed to a 15 percent design level as a pilot project. Key performance areas include La Jolla Shores, Pacific Beach, Mission Beach, Ocean Beach, and Sunset Cliffs. The project adheres to CEQA, NEPA, the Clean Water Act, and the Federal Endangered Species Act, with biological monitoring conducted by qualified biologists to ensure environmental compliance. The City Council formally adopted the plan on September 9, 2025.

General Info

San Diego implements nature-based coastal resilience solutions from May to December 2024 along key beaches under environmental compliance.

Agency

California → City of San Diego

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Citywide along the coast, San Diego, CA

Set-Aside

NONE

Documents

(7)

NOD re Coastal Resilience Master Plan 2025

PDFnotice-of-determination

Appendix E Land Use Consistency Tables for CRMP Phase 1

PDFsupporting-document

0_Final CRMP PEIR

PDF

Appendix C Biological Resources Technical Report for Coastal Resilience Master Plan Phase 1

PDFtechnical-report

Appendix A - Notice of Preparation for Coastal Resilience Master Plan PEIR

PDFpresolicitation

Appendix D Cultural Resources Technical Report - Coastal Resilience Master Plan Phase 1

PDFtechnical-report

Appendix B CalEEMod Results for Pilot Project - Dog Beach

PDFcalemod-results

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Jordan MooreSenior Planner

Full Description

Show more
Climate change increasingly puts the City of San Diego and its critical built and natural resources at risk of coastal flooding and erosion due to sea-level rise. The Coastal Resilience Master Plan (CRMP) Phase 1 will identify specific resilience and conservation needs along the coastline and develop a portfolio of nature-based solutions to promote resilience, protect critical coastal habitats, support coastal access, and protect the City against the risk of climate change, in line with the Climate Resilient SD Plan (Policy TNE-3). Nature-based solutions evaluated by CRMP Phase 1 include both green and natural infrastructure. Green infrastructure encompasses a wide range of built or engineered solutions modeled after nature, while natural solutions often refer to restoration activities. Both green infrastructure and natural infrastructure support purposes such as stormwater management, flood mitigation, urban heat island reduction, and climate adaptation. While the focus of the CRMP Phase 1 is on feasibility of nature-based solutions to adapt to the effects of climate change on the City’s coastline, in some situations, nature-based solutions are most successful in providing risk mitigation when designed with a hybrid approach, including some more typical engineered gray infrastructure components such as underground storage tanks or seawalls. The CRMP Phase 1 presents a combination of solutions that may offer greater shoreline protection while maintaining focus on nature-based solutions. Nature-based solutions that achieve multiple benefits, such as habitat and wildlife protection, water quality improvements, flood storage, resilience from potential upstream impacts, recreational opportunities, and increased coastal access for Communities of Concern, would be prioritized.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
130 College Project
Solicitation # ENV-2023-2307-EIR
The 130 College Project, managed by the City of Los Angeles, involves the removal of an existing surface parking lot to construct a five-story, 232,802 square-foot commercial development on a 2.2-acre site. The facility will include 224,597 square feet of office space, 4,095 square feet of restaurant space, and 4,110 square feet of retail use, with a maximum height of 88 feet and parking distributed across one subterranean and two above-grade levels. The project is currently under environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report and a Mitigation Monitoring Program established to manage impacts related to air quality, greenhouse gas emissions, noise, vibration, and utilities. Key technical requirements include a comprehensive greenhouse gas and criteria air pollutant emissions assessment covering both construction and operation phases. The project must adhere to strict professional standards, requiring personnel performing cultural resource tasks to meet the Secretary of the Interior's Professional Qualifications Standards. Environmental assessments have identified specific needs for paleontological monitoring, the protection of nearby historic resources such as Los Angeles HCM No. 211, and compliance with tribal cultural resource protocols under Assembly Bill 52. Transportation analysis emphasizes the use of Vehicle Miles Traveled as a primary metric, with proposed mitigation including a contribution to the City's Bicycle Trust Fund and the implementation of Transportation Demand Management strategies.
City of Los Angeles

POSTED

about 11 hours ago

DEADLINE

N/A
View Details
NAICS: 541620
New
International
Letter of Interest / Advance Notice to Industry Multidisciplinary Environmental Services RFSO
Solicitation # EW699-260375
Public Works and Government Services Canada intends to establish new Departmental Individual Standing Offers to replace expiring agreements for multidisciplinary environmental services in the Western Region. The scope of work includes environmental impact assessments, permitting, biological and archaeological studies, facility management, contaminated sites consulting, and remediation planning. These services will be divided into four distinct geographic Request for Standing Offers, covering the Prairies, a specific stream for Indigenous suppliers in the Prairies under the Procurement Strategy for Indigenous Business, the Northwest Territories, and the Nunavut Settlement Area, which is limited to firms on the Inuit Firm Registry. Notably, Amendment 01 has removed Yukon from the requirements. The procurement structure utilizes a two-tier call-up system based on a threshold of 100,000 dollars, employing rotational, selective, best-fit, or competitive methods to distribute work. The process emphasizes socio-economic benefits for Indigenous peoples through Modern Treaties and Comprehensive Land Claims Agreements and adheres to the Buy Canadian Procurement Policy. A vendor performance mechanism will be implemented to adjust call-up distributions based on offeror performance. An optional pre-tender information session is scheduled for September 22, 2026, with interested parties required to submit attendee names and questions by September 16, 2026.
Department of Public Works and Government Services

POSTED

about 13 hours ago

DEADLINE

in 8 days
View Details
NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is issuing a Request for Interest (RFI) under solicitation BD-27-1045-BWR00-BWR01-133675 to identify Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations interested in receiving a free American Water Works Association (AWWA) M36 water audit. The program targets entities that are not meeting the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants may receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be able to execute a contract within 15 to 30 days of the grant award. Responses must be submitted via email by October 21, 2026, using the provided application form.
BWR00 - Bureau of Water Resources

POSTED

about 21 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS