Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

130 College Project

Forecast
ENV-2023-2307-EIRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 130 College Project, managed by the City of Los Angeles, involves the removal of an existing surface parking lot to construct a five-story commercial development at 130 West College Street. The proposed 232,802-square-foot building will feature 224,597 square feet of office space, 4,095 square feet of restaurant space, and 4,110 square feet of retail use on a 2.2-acre site. The development will have a maximum height of 88 feet and a Floor Area Ratio of 2.42:1, with parking distributed across one subterranean level, one at-grade level, and one above-grade mezzanine level. The project is subject to extensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report and a Mitigation Monitoring Program established to manage impacts on air quality, greenhouse gas emissions, noise, vibration, and utilities. Key technical assessments include a Phase I Environmental Site Assessment, a Paleontological Resources Assessment, and a Tribal Cultural Resources report. Specific requirements include the use of personnel meeting the Secretary of the Interior's Professional Qualifications Standards for cultural resource tasks and adherence to Assembly Bill 52 confidentiality protocols. The project was approved on August 26, 2026, following a public review process and the implementation of transportation demand management strategies to mitigate vehicle miles traveled.

General Info

City of Los Angeles will build a five-story commercial development at 130 West College.

Place of Performance

W. College Street/N. Main Street, Los Angeles, CA, 90012

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseForecast
Posted

forecast

Notice updated

The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Lakshmi GangamreddypalliPlanning Assistant
Brad NapientekPrincipal Planner

Interested Companies (1)

Eyestone EnvironmentalEl Segundo, CA

Full Description

Show more
The Project proposes the removal of an existing surface parking lot to construct a new five-story, 232,802 square-foot commercial development consisting of 224,597 square feet of office, 4,095 square feet of restaurant, and 4,110 square feet of retail uses, on an approximately 2.2-acre site. The Project would have a maximum height of 88 feet and includes parking in one subterranean level and two above-grade levels.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
On-Call Solid Waste Data Analysis and Economic Services
Solicitation # 26-202-S
Seattle Public Utilities is seeking an on-call consultant to provide expert solid waste data analysis and economic services to support the city's Zero Waste goals. This contract, with an estimated value of $625,000 and a duration of up to five years, focuses on leveraging extensive datasets to evaluate the effectiveness, equity, and feasibility of solid waste incentives, programs, and policies. The scope of work includes program evaluation using causal inference, economic modeling, demand forecasting, longitudinal analysis of waste characteristics, and the extraction of data from Microsoft Access databases. A key component of the engagement is the translation of complex technical findings into actionable insights through data visualization, strategic storytelling, and high-quality reports for both technical and non-technical audiences. The selection process is based on a weighted evaluation of project team qualifications and research and analytical capabilities, with a strong emphasis on equity-centered analysis and the ability to manage multiple projects in an on-call environment. Awarded consultants must adhere to strict compliance standards, including mandatory WMBE inclusion plans for contracts over $343,000, adherence to the Americans with Disabilities Act and WCAG accessibility guidelines, and compliance with Seattle's Equal Benefits and minimum wage ordinances. The contract is governed by a template that incorporates FAR Part 31 for allowable overhead costs and requires specific insurance coverages, including Commercial General Liability and Worker's Compensation. Work is assigned via individual work assignments, each with its own defined schedule and deliverables.
Seattle Public Utilities

POSTED

about 16 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541620
New
SLED
BIG WAVE NEW BRIDGE
Solicitation # 2027-RFP - Big Wave Bridge-00211
The County of San Mateo, through the Planning and Building department, is soliciting proposals for a qualified consultant to secure resource agency and encroachment permits for the construction of the Big Wave New Bridge. Located at 386 Airport Street in Half Moon Bay, the bridge will span a wetland drainage area between a Big Wave parcel to the north and a County-owned parcel to the south to ensure pedestrian path continuity toward the Princeton area. This project is conducted under the conditions of approval for Planning Permit PLN2013-00451. It is important to note that the actual construction of the bridge and the application for the building permit are explicitly excluded from the consultant's scope of work. The contract has a term of one year, with an anticipated award date of November 24, 2026. Proposals must be submitted via the eProcurement portal by November 16, 2026, and must be divided into a technical proposal and a separate fee proposal. Award selection is based on a points-based scoring method where firm qualifications, project approach, proposed schedule, and price are each weighted at 25 percent. The County provides a procurement preference for local businesses and non-profits. All communications regarding the RFP must be handled through the authorized contact persons, Camille Leung and Amy Tang, or the eProcurement portal.
Planning and Building

POSTED

about 17 hours ago

DEADLINE

in 9 days
View Details

More opportunities from California → City of Los Angeles

Same awarding agency

NAICS: 237310
SLED
City of Los Angeles Sidewalk Repair Program (Project)The City of Los Angeles Sidewalk Repair Program is a citywide initiative covering approximately 467 square miles, designed to improve accessibility for persons with mobility disabilities in compliance with local, state, and federal requirements. This project is implemented pursuant to the Willits Settlement and is governed by ordinance LAMC 62.104.1, which streamlines the review and approval process for sidewalk repairs. The scope of work includes curb ramp repairs, crosswalk paving, utility work, and comprehensive street tree management involving retention, removal, replacement, canopy pruning, and root pruning. The program is scheduled to include applicable utility work for a duration of 30 years. To facilitate efficiency, the new ordinance establishes parameters for ministerial approvals to avoid further environmental reviews for most repairs, while providing a streamlined discretionary process for projects falling outside those parameters or those involving the removal of three or more street trees. The project adheres to Mandatory Project Design Features and a revised Street Tree Retention, Removal and Replacement Policy. Official approval was granted by the City Council and Mayor on August 6, 2026, following the certification of the Recirculated Environmental Impact Report and the 2021 Environmental Impact Report to fulfill California Environmental Quality Act requirements. The primary point of contact for the program is Environmental Supervisor II Lauren Rhodes.
Highway, Street, and Bridge Construction

POSTED

22 days ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS