Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

130 College Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Los Angeles

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

W. College Street/N. Main Street, Los Angeles, CA, 90012

Set-Aside

NONE

Documents

(44)

Appendix C Cultural Resources Historic Report 130 West College Street July 2024

PDFtechnical-report

Appendix L - VMT Calculator Runs for Alternatives

PDFother

IV_D_Geology_and_Soils Environmental Impact Analysis

PDFenvironmental-impact-analysis

Notice of Completion and Availability of Draft Environmental Impact Report for 130 College Project

PDFspecial-notice

IV__Mitigation_Monitoring_Program

PDF

I__Introduction

PDF

Draft EIR Alternatives Analysis Section

PDFenvironmental-alternatives

Notice of Completion for 130 College Project SCH #2024060069

PDFnotice-of-completion

IV_C__Energy Environmental Impact Analysis

PDFenvironmental-impact-analysis

Appendix K Utility Report for 130 W College Street Project

PDFutility-report

Draft Environmental Impact Report Executive Summary for 130 College Project

PDFenvironmental-impact-report

Acronyms and Abbreviations Reference Document

PDFother

IV_K_2 Utilities and Service Systems - Energy Infrastructure Environmental Impact Analysis

PDFenvironmental-impact-analysis

Appendix_FEIR-1__Draft_EIR_Comment_Letters

PDF

Appendix H Noise and Vibration Calculation Worksheets

PDFother

VI Other CEQA Considerations - Draft EIR Section

PDFenvironmental-impact-report-section

Appendix F - Phase I Environmental Site Assessment Report for 130 West College Street

PDFenvironmental-site-assessment

II__Responses_to_Comments

PDF

130 College Project Description

PDFproject-description

Appendix J Tribal Report for 130 West College Street Project

PDFtribal-report

IV.A Air Quality Environmental Impact Analysis

PDFenvironmental-impact-analysis

Appendix A Initial Study and Notice of Preparation for 130 College Project

PDFinitial-study

III__Revisions,_Clarifications,_and_Corrections_to_the_Draft_EIR

PDF

Notice_of_Public_Hearing_&_Availability_of_Final_Environmental_Impact_Report

PDF

Appendix B - Air Quality and Greenhouse Gas Emissions Methodology for 130 College Project

PDFsow

Cover_and_Table_of_Contents

PDF

VII References for Environmental and Regulatory Documents

PDFreferences

Appendix G Land Use Tables - SCAG RTP/SCS Policies

PDFsupporting-document

Caltrans Comment Letter on 130 College Project Environmental Review

PDFcomment-letter

IV_F_Hazards_and_Hazardous_Materials Environmental Impact Analysis

PDFenvironmental-impact-analysis

130 College NOC_LG updated2

PDF

Paleontological Resources Assessment for 130 West College Street Project

PDFpaleontological-report

IV_E Greenhouse Gas Emissions Environmental Impact Analysis

PDFenvironmental-impact-analysis

Draft EIR Section IV.H Noise Impact Analysis

PDFenvironmental-impact-analysis

IV_B Cultural Resources Environmental Impact Analysis

PDFenvironmental-impact-analysis

III Environmental Setting - Draft EIR Section

PDFenvironmental-setting

IX List of Preparers for Environmental Impact Report

PDFlist-of-preparers

IV_J_Tribal_Cultural_Resources Environmental Impact Analysis

PDFenvironmental-impact-analysis

130 College Project Environmental Impact Report Cover and Table of Contents

PDFenvironmental-impact-report

Transportation Environmental Impact Analysis for 130 W. College Street Project

PDFenvironmental-impact-analysis

Appendix D Energy Analysis Summary

PDFsupporting-document

Environmental Impact Analysis K.1 Utilities and Service Systems—Water Supply and Infrastructure

PDFenvironmental-impact-analysis

Appendix I Transportation Assessment for 130 W College St Project

PDFtransportation-assessment

IV.G Land Use and Planning Environmental Impact Analysis

PDFenvironmental-impact-analysis

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Lakshmi GangamreddypalliPlanning Assistant
Brad NapientekPrincipal Planner

Interested Companies (1)

Show more
Eyestone Environmental
El Segundo, CA

Full Description

Show more
The Project proposes the removal of an existing surface parking lot to construct a new five-story, 232,802 square-foot commercial development consisting of 224,597 square feet of office, 4,095 square feet of restaurant, and 4,110 square feet of retail uses, on an approximately 2.2-acre site. The Project would have a maximum height of 88 feet and includes parking in one subterranean level and two above-grade levels.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Ione-Preston Training Facility Expansion Forestry And Fire Protection (Calfire)
Solicitation # 20260729051
California’s Department of Conservation, through its Bureau of Forestry and Fire Protection, is seeking qualified environmental consulting firms to support the expansion of its Ione training facility by repurposing the adjacent 300-acre former Preston Youth Correctional Facility, a property listed on the National Register of Historic Places. The project involves potential demolition of historic structures and requires comprehensive environmental compliance, including adherence to Public Resources Code Sections 5024 and 5024.5, as well as full California Environmental Quality Act (CEQA) documentation. The selected contractor will be responsible for conducting historic resource evaluations, preparing all required environmental studies, securing necessary permits, and ensuring that all development activities align with state preservation and environmental regulations. The solicitation, identified as Bid #RESD-PMDB 2026-07, is open for responses until August 26, 2026, and falls under NAICS code 541620 for environmental consulting services. The project is managed by the Department of General Services, Real Estate Services Division, Project Management and Development Branch, with performance taking place in Ione, California. Primary point of contact for technical inquiries is Stephanie Coleman, Senior Environmental Planner, while Sandra Gomez and Nora Sandstedt handle contractual matters. The goal is to enhance CALFIRE’s fire training capacity through responsible development that balances operational needs with the legal and cultural obligations to preserve the site’s historic significance.
Department of General Services, Real Estate Services Division, Project Management and Development Branch (DGS, RESD, PMDB)

POSTED

about 12 hours ago

DEADLINE

in 26 days
View Details
NAICS: 541620
New
Federal
F--VAMMS Unit design Optimization of vehicle add-on m
Solicitation # 68HERW26R0072
The Environmental Protection Agency’s Tribal & Science Division Water is seeking proposals to optimize the design of a vehicle add-on mobile smoke monitoring system under solicitation number 68HERW26R0072. This effort, identified by NAICS code 541620, aims to enhance the functionality, efficiency, and deployment capabilities of the VAMMS unit for real-time smoke detection and analysis during environmental incidents. Proposals must be submitted by August 13, 2026, at 4:00 PM Eastern Time, with the solicitation posted on July 30, 2026. The work is to be performed in support of the EPA’s broader environmental monitoring mission, with the primary point of contact being Kasual Sharp at the agency’s office in Cincinnati, Ohio. The contract is open to all eligible entities without specific set-asides, and responses should address technical innovation, system integration, durability under field conditions, and the ability to provide accurate, timely smoke data from mobile platforms. All communication and submissions must be directed through the designated point of contact, and interested parties are encouraged to review the official solicitation on SAM.gov for detailed technical requirements and evaluation criteria. The success of this project hinges on delivering a scalable, reliable, and cost-effective upgrade to existing monitoring capabilities that aligns with federal environmental response protocols.
Tribal & Science Division Water

POSTED

about 18 hours ago

DEADLINE

in 13 days
View Details
NAICS: 541620
New
SLED
City of Redwood City Focused General Plan UpdateThe City of Redwood City has enacted comprehensive amendments to its Zoning Code and Municipal Code to implement the 2023–2031 Housing Element, streamline development review processes, and improve code clarity and consistency with the General Plan and state law. These changes were adopted through ordinances that waived second readings and repealed prior resolutions related to CEQA guidelines, ensuring alignment with regional housing mandates and environmental compliance requirements under the California Environmental Quality Act. Concurrently, the City Council approved revisions to its Engineering Standards, formalizing technical requirements for construction and infrastructure projects within municipal boundaries. The project, referenced as the Focused General Plan Update, centers on regulatory modernization rather than traditional procurement, with all actions led by the City as the responsible public agency. Environmental compliance was achieved through the preparation and certification of an Environmental Impact Report and the filing of a Notice of Exemption, both documented under State Clearinghouse number 2022100449, with findings and mitigation measures adopted as conditions of approval. All activities and deliverables are confined to Redwood City, with final documentation filed at City Hall and the San Mateo County Clerk’s Office. No federal contract mechanisms apply to this action; there are no contract line items, pricing structures, award evaluation criteria, or federal acquisition regulation clauses. Financial transactions referenced relate solely to administrative filing fees paid to the County Clerk for environmental documentation, not vendor payments or service contracts. The City’s Principal Planner serves as the primary point of contact for project coordination and CEQA compliance, with no designated contracting officer, technical representative, or procurement officer assigned. Proposal submission guidelines are limited to public access channels, including the City’s website and physical drop-off locations, with no formal solicitation, bidding, or offeror certification requirements. Performance is measured by adoption of ordinances and resolutions, public availability of EIR and NOE documents, and adherence to CEQA statutory obligations, rather than by service delivery timelines or commercial milestones. The process reflects a municipal planning and policy update effort governed by state environmental and land use law, not federal procurement rules, and is intended to facilitate housing production and regulatory efficiency through legislative and administrative action.
Redwood City

POSTED

about 23 hours ago

DEADLINE

N/A
View Details
NAICS: 541620
New
SLED
Second Supplemental Recirculated Environmental Impact Report (SSREIR) for Revisions to Title 19- Kern County Zoning Ordinance (2024) focused on oil and gas
Solicitation # PLO26-00878
The project centers on the permanent plugging and abandonment of the Star Fee I39-1 well located in the Cymric Oil Field in California, as part of the Second Supplemental Recirculated Environmental Impact Report for revisions to Kern County’s Title 19 Zoning Ordinance focused on oil and gas operations. This regulatory action is tied to the solicitation number PLO26-00898, issued by Kern County under NAICS code 541620, which pertains to environmental consulting services. No new drilling or pipeline installation is involved; the scope is limited strictly to well abandonment without any associated infrastructure development, with site and equipment details outlined on page two of the attached Site Plan. The project is governed by California Environmental Quality Act (CEQA) processes, specifically under a Notice of Exemption filing, and no traditional procurement elements such as pricing, delivery schedules, performance periods, or contract clauses are present. The place of performance is in California, and while the posting date is listed as June 22, 2026, there is no indication of a contract value, payment terms, or formal award process. Point of contact for administrative inquiries includes Craig M Murphy, Director of Kern County, and Brian Berry, Senior Permitting Advisor, with all documentation tied to regulatory compliance rather than a commercial contract transaction.
Kern County

POSTED

about 23 hours ago

DEADLINE

N/A
View Details
NAICS: 541620
New
International
Forestry and Parks - Request for Proposal - Water & Wastewater Systems Professional Consulting Services - Provincial Water and Wastewater Regulatory Requirements Throughout the Province
Solicitation # AB-2026-05394
Alberta Parks is seeking qualified consultants to conduct a comprehensive province-wide assessment of its potable water and wastewater systems to ensure full compliance with provincial regulatory requirements under the Environmental Protection and Enhancement Act, the Water Act, Public Health Act drinking-water standards, and other directives from Alberta Environment and Protected Areas. These systems, used across seasonal and year-round recreational facilities, vary widely in size, configuration, and operational cycles, leading to inconsistent monitoring, reporting, and compliance tracking due to differing regional practices and high seasonal staff turnover. The absence of standardized processes has hindered Alberta Parks’ ability to reliably verify compliance, detect gaps, and implement consistent improvements across regions. To resolve this, the project will identify all regulatory obligations for each facility, evaluate current adherence, and provide actionable recommendations to close compliance gaps. The outcome will include a standardized Regulatory Compliance Key Performance Indicator Matrix and a centralized annual dashboard to visually display regional performance, enabling assured, annual confirmation that all water and wastewater compliance obligations are consistently met across the province. The solicitation, AB-2026-05394, is open for proposals until August 31, 2026, with Shaun Polley, Project Manager, serving as the primary point of contact.
Forestry and Parks

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Airport Master Planning & Environmental ComplianceThe contract seeks qualified firms to develop comprehensive airport master plans, including airport layout plans, environmental assessments, noise compatibility studies, and land use planning initiatives, all in support of airport development and regulatory compliance. The scope of work requires detailed technical expertise to ensure alignment with federal and state aviation standards, public safety requirements, and environmental regulations, with deliverables designed to facilitate long-term infrastructure planning and community integration. All tasks must be executed with precision to support the Georgia-based Early County Government’s objectives for sustainable aviation growth and environmental stewardship. Subcontractors must submit proposals by August 28, 2026, under a solicitation linked to the Georgia Department of Administrative Services’ procurement system. The contract is classified under NAICS code 541620 for environmental consulting services and is structured as a subcontract, indicating it will be awarded to a firm working under a prime contractor or larger project framework. While specific location details are not provided, performance is expected to focus on airport facilities within Early County, Georgia, requiring on-site analysis, stakeholder coordination, and adherence to regional planning priorities. The procurement is managed through the state’s official government procurement portal, and interested parties must ensure full compliance with submission guidelines and deadlines to be considered.
Early County Government

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 541620
New
SLED
Recovered Materials Procurement SupportThe contract titled Recovered Materials Procurement Support requires the provision of advisory services and operational support to ensure the procurement of recovered materials complies with Environmental Protection Agency regulations and Resource Conservation and Recovery Act requirements. This subcontract is part of an initiative by the Massachusetts agency COCC1 - Finance & Procurement to align material acquisition practices with federal environmental standards, emphasizing sustainable sourcing and proper handling of recycled content. The work is to be performed at Moody Street in Lowell, Massachusetts, with a deadline for responses set for August 28, 2026, and the solicitation was posted on July 29, 2026. The North American Industry Classification System code 541620 indicates that the services fall under environmental consulting, specifically targeting technical guidance on compliance, documentation, and procurement processes tied to waste and material recovery. The contract does not specify a set-aside status or type, nor does it identify a point of contact or detailed performance metrics, but it implies a need for specialized expertise in navigating federal environmental regulations within procurement workflows. Contractors are expected to have experience in regulatory adherence for recovered materials, including tracking, reporting, and validation under RCRA, and must deliver services that integrate seamlessly with the agency’s broader sustainability and fiscal oversight objectives. The absence of a solicitation number and organizational details suggests a streamlined internal or state-led procurement process, with the primary focus on legal and operational compliance rather than competitive bidding parameters.
COCC1 - Finance & Procurement

POSTED

1 day ago

DEADLINE

in 28 days
View Details