Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

City of Los Angeles Sidewalk Repair Program (Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Los Angeles is implementing a citywide Sidewalk Repair Program covering approximately 467 square miles to fulfill its obligations under the Willits Settlement, ensuring improved accessibility for individuals with mobility disabilities in compliance with local, state, and federal standards. The program introduces a new ordinance, LAMC 62.104.1, which transforms how sidewalk, curb ramp, crosswalk, and related infrastructure repairs are approved and executed over the next 30 years. It establishes clear parameters to classify most sidewalk repairs as ministerial actions, eliminating the need for additional environmental review, while creating a streamlined discretionary process for projects that fall outside those parameters, including those involving the removal of three or more street trees. The ordinance also updates the Street Tree Retention, Removal and Replacement Policy to balance accessibility improvements with urban forestry goals, and mandates standardized Project Design Features that enforce regulatory compliance and uniform construction procedures across all repairs. This initiative represents a systemic shift away from fragmented, case-by-case approvals toward a predictable, efficient framework for infrastructure upgrades. By minimizing delays and administrative burdens, the program aims to accelerate repairs while maintaining environmental and community considerations. All work will be conducted in alignment with accessibility requirements, and the ordinance ensures accountability through consistent design standards and procedural guidelines. The City of Los Angeles, through its Office of Environmental Supervisor II, is managing the program with direct oversight provided by Lauren Rhodes, and the initiative is cataloged under the California Environmental Quality Act system as an ongoing long-term commitment to equitable public infrastructure.

General Info

Los Angeles implements 30-year sidewalk repair program with streamlined approvals and accessibility compliance.

Agency

California → City of Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

(1)

City of Los Angeles Sidewalk Repair Program Notice of Determination 080626

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Lauren RhodesEnvironmental Supervisor II

Full Description

Show more
The Sidewalk Repair Program (the Project) is implemented citywide, over an area that covers approximately 467 square miles. The Project is a citywide program intended to modify the manner in which sidewalk repair projects are undertaken pursuant to the City's obligations under the Willits Settlement, which includes various City actions that will provide improved access to persons with mobility disabilities in accordance with local, state, and federal accessibility requirements. The Project includes an ordinance that will guide the construction of future sidewalk repairs; curb ramp repairs; crosswalk paving; street tree retention, removal and replacement; canopy pruning; root pruning; and applicable utility work for 30 years within the City. The new ordinance (LAMC 62.104.1) revises the way sidewalk repairs pursuant to the Willits Settlement, are reviewed and approved, and is intended generally to improve and streamline the implementation process. The primary components of the ordinance include: • Specific parameters to enable most sidewalk repairs to proceed as ministerial approvals, not subject to further environmental review applicable to discretionary actions. • A streamlined discretionary approval process for sidewalk repair projects falling ou1side the specific parameters allowed for a ministerial sidewalk repair approval. • A streamlined discretionary approval process for sidewalk repair projects involving the proposed removal of three or more street trees. • A revised Street Tree Retention, Removal and Replacement Policy. • Mandatory Project Design Features (PDFs) generally consisting of regulatory compliance measures and standard construction conditions and procedures.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process improvements to remove per- and polyfluoroalkyl substances from surface water supplies. The project is solicited under the number LACSD Surface Water PFAS Removal Project No. 251 CA and is open to Disadvantaged Business Enterprises as part of a Department of Transportation set-aside initiative, aiming to promote equitable participation in infrastructure development. Work must be executed in accordance with federal and state regulatory requirements for water quality and environmental protection, with performance localized to the two treatment plant sites in California. Solicitation was posted on August 8, 2026, with responses due by September 3, 2026, and the North American Industry Classification System code 237310 applies, indicating it is a water and wastewater plant construction project. The contracting entity is Pyramid Building & Engineering, Inc., serving as both the organization name and agency, with primary contact for inquiries being John Garrison, reachable via phone or email. All proposals must align with technical specifications for PFAS removal technologies and integration into existing plant infrastructure, ensuring compliance with long-term water safety standards and operational reliability.
Pyramid Building & Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details