This Subcontract opportunity from Colorado was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Coating System Design & Specification Development
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract entails a detailed technical analysis of the current conditions at a light rail station to inform the design and specification of a long-lasting, code-compliant coating system that accounts for the specific environmental exposures the structure faces. This work requires evaluating surface materials, degradation patterns, moisture intrusion, UV exposure, temperature fluctuations, and other site-specific factors to ensure the proposed coating solution provides enduring protection against corrosion, weathering, and other environmental stressors while meeting all applicable building and safety codes. The deliverables will include a comprehensive coating system plan with material selections, application methodologies, durability projections, and maintenance recommendations. This subcontract is categorized under NAICS code 541620, indicating it falls within technical consulting services, and is issued under the Capital Programs agency in Colorado. The solicitation was posted on July 28, 2026, with a response deadline of August 28, 2026. The scope is focused solely on design and specification development, with no mention of procurement or installation services, meaning the selected provider is responsible only for delivering a technically robust and enforceable coating system plan. The place of performance is tied to a light rail station in Colorado, though exact location details are not specified in the data, and all work must align with regional regulatory standards and environmental conditions present at the site.
General Info
Place of Performance
CO, USASet-Aside
Documents
This scope was carved out of 126DM011.
The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.
Dayton Station Painting Project- Phase 2
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Construction Project Management & Site SupervisionOpen now
- Play Area Safety Inspections and CertificationOpen now, due in 17 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Colorado → Capital Programs
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
