Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Colorado was posted on July 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Coating System Design & Specification Development

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract entails a detailed technical analysis of the current conditions at a light rail station to inform the design and specification of a long-lasting, code-compliant coating system that accounts for the specific environmental exposures the structure faces. This work requires evaluating surface materials, degradation patterns, moisture intrusion, UV exposure, temperature fluctuations, and other site-specific factors to ensure the proposed coating solution provides enduring protection against corrosion, weathering, and other environmental stressors while meeting all applicable building and safety codes. The deliverables will include a comprehensive coating system plan with material selections, application methodologies, durability projections, and maintenance recommendations. This subcontract is categorized under NAICS code 541620, indicating it falls within technical consulting services, and is issued under the Capital Programs agency in Colorado. The solicitation was posted on July 28, 2026, with a response deadline of August 28, 2026. The scope is focused solely on design and specification development, with no mention of procurement or installation services, meaning the selected provider is responsible only for delivering a technically robust and enforceable coating system plan. The place of performance is tied to a light rail station in Colorado, though exact location details are not specified in the data, and all work must align with regional regulatory standards and environmental conditions present at the site.

General Info

Technical analysis and specification of durable, code-compliant coating for Colorado light rail station.

Place of Performance

CO, USA

Set-Aside

NONE

Documents

This scope was carved out of 126DM011.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Dayton Station Painting Project- Phase 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Capital Programs
ContactsNo contacts available
OfficeN/A
Organization / AgencyColorado → Capital Programs
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Technical analysis of existing conditions and development of a durable, code-compliant coating system tailored to the environmental exposure at a light rail station.

More opportunities from Colorado → Capital Programs

Same awarding agency

NAICS: 561720
SLED
Bus Shelter Maintenance Services (15% SBE Goal)
Solicitation # 126DM016
The Regional Transportation District (RTD) is soliciting proposals for a fixed-price contract to provide comprehensive custodial services, graffiti removal, and snow removal at various locations, including Group 3 shelters, North and South Federal shelters, and the Federal and Colfax and Federal and Evans transfer centers. The contract features a three-year base performance period starting December 1, 2026, with two optional one-year extensions and a potential final extension of up to six months. A mandatory 15% Small Business Enterprise (SBE) participation goal is established, requiring certified firms and detailed documentation, including affidavits and participation schedules, to ensure compliance. The selected contractor must submit detailed custodial, graffiti, snow removal, staffing, and quality control plans, as well as a transportation maintenance and safety plan adhering to the Manual on Uniform Traffic Control Devices and City standards. Performance is monitored through a required quality control mobile app for photo documentation and on-site inspections by RTD quality assurance inspectors. Proposals are evaluated based on a weighted scoring system consisting of cost (40%), past relevant experience (30%), and the proposed approach to the scope of work (30%). Invoices are submitted monthly and paid within 30 days upon approval and receipt of a narrative progress report.
Janitorial Services

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS