Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on July 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Colburn Park Splash Pad Project

Closed
82State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

General Info

Documents

10

Bid Drawings_2024-07-10 - Site Demolition and Construction Notes

PDF, High priority: read this firstspecifications
High

Bid Specifications_2024-07-10 - CSI Technical Specifications

PDF, High priority: read this firstspecifications
High

City of Fife - Colburn Park Splash Pad Project - Addendum 1

PDF, High priority: read this firstamendment
High

City of Fife - Colburn Park Splash Pad Project - Addendum 2

PDF, High priority: read this firstamendment
High

City of Fife - Colburn Park Splash Pad Project IFB

PDF, High priority: read this firstifb
High

City of Fife - Colburn Park Splash Pad Project IFB

PDF, High priority: read this firstifb
High

City of Fife - Colburn Park Splash Pad Project IFB

PDF, High priority: read this firstifb
High

Colburn Park Splash Pad Project - Q&A

PDF, High priority: read this firstq-and-a
High

Job 20218 - Colburn Park Splashpad Purchased Materials List

PDF, High priority: read this firstspecifications
High

Colburn Park Splash Pad Walk Through Sign-in Sheet (7/30/24)

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Fife
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → City of Fife
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Notice is hereby given that sealed bids will be received by the City of Fife City Hall up to the hour of 2 p.m. August 15, 2024, for the Colburn Park Splash Pad Project, located at 5410 20th Street East in Fife, WA. This work includes furnishing the necessary materials and labor as described in the attached drawings & specifications.Improvements to be included within this Project are as follows: Install the splash pad equipment (already purchased and provided by Vortex), install the restroom building (already purchased and provided by Romtec), add walkways and install park amenities. A more detailed scope of work can be found in the bid packet. The city invites interested firms to bid on this project.A mandatory walk-thru meeting will be held at Colburn Park, located at 5410 20th Street East, Fife, WA, at 1 p.m. on July 30, 2024.All bids shall be submitted on the prescribed Bid Forms and in the manner as stated in this invitation and in the Bid Document. Bids must be submitted in a sealed envelope with the outside clearly marked “sealed bid” with the bid opening date and time, and the project name as it appears in this invitation along with the name and address of the bidder. Bids shall be addressed to the City Clerk, City of Fife - 5411 23rd Street, Fife, WA, 98424. Bid proposals will be received only at City Hall. Proposals received after 2 p.m., on August 15, 2024, will not be considered.Purpose of RequestThe addition of a splash pad has been a top community request since 2015. In 2022, the playground, which was located at Colburn Park, no longer met safety standards, and was removed. This provided the perfect opportunity to reevaluate the park and move forward with the splash pad to meet the community interest that has been expressed over the last 9 years.Project Timeline• July 22, 2024 - Project posted• July 30, 2024 – Mandatory Walk-Thru at 1:00 p.m. Colburn Park (5410 20th St. E.)• August 9, 2024 – Questions due by 5 p.m. to Megan Jendrick document.write('mjendrick'+'@'+'cityoffife.org')For security reasons, you must enable JavaScript to view this E-mail address.• August 15, 2024 – Bids Due at 2:00 p.m. – Fife City Hall (5411 23rd St. E.)On site work must be completed between issuance of a Notice to Proceed (approximately September 1, 2024) and April 30, 2025. No extensions will be granted for this work.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS