Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Pennsylvania was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cold-Formed Metal Framing Specialist

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract opportunity with the Commonwealth of Pennsylvania Department of Conservation and Natural Resources is for a Cold-Formed Metal Framing Specialist. The selected contractor will be responsible for installing cold-formed metal framing for walls and ceilings on heavy and highway projects, specifically working with prime contractors. The scope of work includes the installation of C-shaped steel joists, U-shaped joist tracks, and steel box headers, as well as the framing of both load-bearing and non-load-bearing partitions using ASTM A1003 Structural Grade Type H metallic coated steel. The project falls under NAICS code 238120. Interested parties must note the tight timeline, as the solicitation was posted on September 16, 2026, with a response deadline of September 17, 2026. Further details and submission instructions are available through the Bid Express portal.

General Info

PA DCNR subcontract for cold-formed metal framing installation on heavy and highway projects.

Documents

This scope was carved out of FDC-109-103106.1R.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FDC-109-103106.1R

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCommonwealth of Pennsylvania - Department of Conservation and Natural Resources
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs cold-formed metal framing for walls and ceilings for prime contractors on heavy/highway projects. Installs C-shaped steel joists, U-shaped joist tracks, and steel box headers. Frames non-load-bearing and load-bearing partitions using ASTM A1003 Structural Grade Type H metallic coated steel. Delivers metal stud wall and ceiling framing.

More opportunities from Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

Same awarding agency

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS