Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Washington was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Metal Fabricator and Installer

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for the Lakehaven Water and Sewer District involves the fabrication and installation of miscellaneous metal components and aluminum safety railings for wastewater treatment plant projects. The scope of work includes installing metal fabrications and aluminum railings according to the AA Aluminum Design Manual, as well as the implementation of post-installed anchors. The contractor is required to perform welding and non-destructive testing using Type 316 stainless steel and hot-dip galvanized coatings. This opportunity was posted on September 16, 2026, with a response deadline of October 13, 2026. The project falls under NAICS code 238120 and requires the delivery of all installed metal supports and railings.

General Info

Subcontract for metal fabrication and aluminum railing installation at Lakehaven wastewater treatment plant.

Documents

This scope was carved out of 26-1724.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026 Redondo Primary and Secondary Clarifiers Rehabilitation (26-1724)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Lakehaven Water and Sewer District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs miscellaneous metal components and aluminum safety railings for prime contractors on Lakehaven Water and Sewer District WWTP projects. Installs metal fabrications, aluminum railings per AA Aluminum Design Manual, and post-installed anchors. Performs welding and non-destructive testing using Type 316 stainless steel and hot-dip galvanized coatings. Delivers installed metal supports and railings.

More opportunities from Washington → Lakehaven Water and Sewer District

Same awarding agency

NAICS: 237110
New
SLED
2026 WMI-9th Place South and Vicinity (26-1729)
Solicitation # 26-1729
Solicitation 26-1729 is a project for the Lakehaven Water and Sewer District in Washington involving the installation of water mains and appurtenances. The scope of work includes the removal and decommissioning of asbestos-cement, polyethylene, galvanized steel, and ductile iron pipes, as well as the installation of ductile iron pipes ranging from 4 to 12 inches in diameter. Key deliverables include the placement of controlled density fill, installation of gate valves, service lines, hydrants, and blowoff assemblies. The project also requires construction surveying, material testing, temporary traffic control, and full site restoration. Work will be performed within public rights-of-way and private utility easements, specifically focusing on 9th Place South and its vicinity, including 20th Avenue South. The contract will be awarded to the lowest responsive and responsible bidder based on total price extensions. Bidders must provide a bid security, evidence of insurance, and an L&I Asbestos Certification for any entity handling AC pipe. Compliance with RCW Chapter 39.12 for prevailing wages and 2015 ADA Standards for accessibility is mandatory. Performance is measured by the Engineer, with specific quality standards for Hot Mix Asphalt density and material grade. The contract period begins upon the Notice to Proceed and concludes once physical work is complete and all required documentation, such as certified payrolls and material certifications, has been submitted.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS