This Solicitation opportunity from Nevada was posted on April 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Collection System Rehabilitation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive sewer system rehabilitation project across various locations in the Las Vegas Valley, designated as Project No. 20104 with PWP No. CL-2024-020. The scope encompasses installing approximately 11,400 linear feet of cured-in-place pipe (CIPP) within existing gravity sewer pipelines, removing and replacing around 27,400 linear feet of sewer pipelines, and performing trenchless pipe repairs, sewer manhole removals, installations, and rehabilitations. Additional work includes open cut and trenchless spot repairs, water main relocations, sewer lateral connections, and restoration of pavement, sidewalks, landscaping, fences, and walls. The project also involves traffic control, dewatering, bypass pumping, and other related activities necessary for sewer system rehabilitation. The work site spans multiple locations throughout the Las Vegas area, with an estimated cost range of approximately $38.3 million to $44.7 million, reflecting the project's extensive scale and complexity. The contract is issued by the Clark County Water Reclamation District, a Nevada-based organization, with a solicitation posted on April 9, 2024, and a response deadline set for May 30, 2024. The project emphasizes thorough planning and execution of sewer infrastructure upgrades, including both trenchless and open cut methods, to improve system reliability and capacity. The procurement process involves detailed bid requirements, including traffic management, dewatering, and bypass operations, to ensure minimal disruption during construction. The project’s comprehensive scope and significant budget underscore its importance in maintaining and upgrading the region’s sewer infrastructure, requiring qualified contractors with experience in large-scale utility rehabilitation and construction activities.
General Info
Place of Performance
NV, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
SCOPE OF WORK: The installation of approximately 11,400 linear feet of cured-in-place pipe (CIPP)within existing gravity sewer pipelines ranging in size from 6-inches to 18-inches; removal and replacement of approximately 27,400 linear feet of gravity sewer pipelines ranging in size from 6-inches to 18-inches; installation or trenchless pipe repair sleeves; removal or abandonment of sewer manholes; installation of sewer manholes; and rehabilitation of sewer manholes. This work also includes open cut spot repairs of sewer lines, trenchless spot repairs of sewer lines; relocation of water main pipelines and laterals; sewer lateral connections; removal/replacement/restoration of bituminous concrete pavement, sidewalk, curb, gutter, landscaping, fences & walls; traffic control; dewatering; bypass pumping; and all other appurtenant work required to rehabilitate sewer pipelines and sewer manholes. The site of the work is located at various locations throughout the Las Vegas Valley. ESTIMATED COST: The Engineer's estimate is in the $38,300,00.00 to $44,700,000.00 range.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
