Colwich Wastewater Treatment Plant Improvements

Active
257001-006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Colwich is seeking bids for the Colwich Wastewater Treatment Plant Improvements project, with a submission deadline of October 14, 2026, at 9:00am local time. The project involves the installation of aeration equipment for the wastewater treatment plant lagoon system. While the equipment supplier, Triplepoint, will handle the installation of aerators and air piping, the selected general contractor will be responsible for all electrical work, the installation and setting of the blower pad, and overall coordination with the equipment supplier. Bids must be delivered to the City of Colwich office at 212 W. Wichita Ave., Colwich, KS 67030. All inquiries regarding the bidding documents should be directed in writing to Nicole Franken, PE, at Professional Engineering Consultants, P.A.

General Info

Colwich seeks bids by October 14, 2026, for wastewater plant electrical and coordination work.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKansas → Professional Engineering Consultants, PA
Contacts1 person available
OfficeN/A
Office AddressN/A

Interested Companies (6)

Kansas ElectricNewton, KS
Pacific Wastewater OptimizationFremont, CA
ePlanColumbia, MO

See All 6 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Date Issued: 9/22/2026
Bids for the construction of Colwich Wastewater Treatment Plant Improvements will received at the office of City of Colwich located at 212 W. Wichita Ave. Colwich, KS 67030 until October 14, 2026 at 9:00am local time. At that time the Bids will be publicly opened and read.
Description of Project:
Installation of aeration equipment for the WWTP lagoon system. Equipment supplier (Triplepoint) will install the aerators and associated air piping, General Contractor to provide all electrical work, blower pad installation and setting, and coordination with equipment supplier.
Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
The Engineer is Professional Engineering Consultants, P.A.
Their phone number 316-262-2691.
Their address is 303 S. Topeka, Wichita, Kansas 67202.
Contact Name & Email: Nicole Franken, PE Nicole.franken@pec1.com

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
BGNDRF PIPING UPGRADES
Solicitation # 140R4025R0017
The U.S. Department of the Interior, through its Albuquerque Area Office, is preparing to award a contract for the Brackish Groundwater National Desalination Research Facility Yard Piping and Flow Measurement Upgrades under a Small Business Set-Aside with NAICS code 237110 and a size standard of $45 million. This procurement will utilize a best value process in accordance with FAR Part 15 and Part 36.3, and is structured as a traditional design-build delivery method. The project scope includes the design and construction of yard piping upgrades, such as replacing the 4-inch TP10 return line to SWST2, removing the partially buried TP10 manifold, and installing new buried piping for SW1, SW2, SW3, and PW to three above-grade manifolds. Additionally, four magnetic flow meters will be installed in the CW vault, along with four new concrete vaults near existing valve vaults at Pond 1, Pond 2, Pond 3, and Agriculture. The scope also encompasses installing new conduit, providing electrical power for flow meters and heat trace, and terminating controls cabling to the existing SCADA PLC in the Research Facility building, ensuring both local and remote readouts are available. The estimated contract value ranges from $500,000 to $1,000,000, with performance located at 500 Lavelle Road in Alamogordo, New Mexico. The contractor must complete the 90% design review within 122 days of contract award and finish all construction, commissioning, and performance testing within 305 days. Bonding requirements mandate a minimum capacity of $1,000,000 and 100% coverage of the awarded contract price. Contractors must implement a safety program meeting or exceeding Reclamation Safety and Health Standards, be registered in SAM, vetted through ORCA and EPLS, and be classified as a small business as defined by the NAICS code. The solicitation is anticipated to be released around August 17, 2026, with responses due by July 16, 2026, and is managed by Contract Specialist Valerie Jiron and Contracting Officer Mary Maestas.
Albuquerque Area Office

POSTED

about 14 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237110
New
Federal
9-Mile Pump Station
Solicitation # W911XK26BA028
The U.S. Army Corps of Engineers Detroit District, in partnership with Macomb County Public Works, is soliciting a Firm-Fixed-Price construction contract for the 9-Mile Pump Station project in St. Clair Shores, Michigan. The project aims to separate the 8-1/2 Mile Relief Drain from the 9-Mile Drain to reduce flood risks for southeast Michigan and protect the water quality of Lake St. Clair. The scope of work includes providing 615 cfs of pumping capacity, constructing the pump station structure, performing excavation and demolition, installing baffle walls, and implementing comprehensive electrical and mechanical upgrades. Key technical requirements include the installation of vertical mixed-flow impeller pumps, 3-phase vertical induction motors, variable frequency drive systems, and the integration of SCADA control systems with strict cybersecurity compliance. The project features an 880-day period of performance, with work required to commence within 10 calendar days of the Notice to Proceed. The contractor is responsible for the transportation, installation, and testing of owner-furnished equipment, including four Cummins diesel generators and a precast valve vault. Bids for solicitation W911XK26BA028 are due electronically by October 20, 2026, at 2:00 PM Eastern Time. Award will be based on a public bid opening process evaluating the lowest responsive and responsible bidder, with requirements including a bid bond, a preliminary Project Labor Agreement, and a Subcontracting Plan.
W072 Endist Detroit

POSTED

about 14 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS