Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on April 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Commercial Flooring Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
GYM FLOOR REPLACEMENT
Solicitation # WL-26-012
The Woodland Job Corps Center, operated by Adams and Associates Inc. for the U.S. Department of Labor, is soliciting proposals for the replacement and restoration of a 78 by 62 foot rubber gym floor in Laurel, Maryland. The scope of work includes a comprehensive process of inspection, cleaning, buffing, and sanding, followed by the application of one primer coat and two coats of specialized court paint. The contractor is responsible for removing and reinstalling bleachers and ensuring all original court lines, markings, and lettering are repainted. Proposals are due by November 23, 2026, and a mandatory site visit is scheduled for November 18, 2026. Award will be based on Best Value rather than lowest price, with evaluation weighted across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The selected contractor must be a licensed Maryland contractor and comply with Davis-Bacon Act wage determinations, EPA, and OSHA regulations. Required deliverables include a sequenced construction schedule within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and a final punch list. Payment terms are Net 30, and the center is tax-exempt. Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, insurance certificates naming Adams and Associates Inc. as an additional insured, and a 90-day bid guarantee.
Woodland Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 238330
New
Exterior Basketball Court Repair
Solicitation # WL – 26 - 013
The Woodland Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor, is soliciting bids for the removal and replacement of its exterior basketball court in Laurel, Maryland. This project requires the contractor to provide all labor and materials to ensure the court is safe and suitable for recreational use, including an initial site inspection and the submission of a sequenced construction schedule within 10 days of the Notice to Proceed. Work must commence within 14 days of the Notice to Proceed and adhere to all state and local codes, national building codes, and current EPA and OSHA regulations. The contractor must guarantee all workmanship for one year and provide a timeline for substantial completion. Award will be based on best value rather than the lowest price, with evaluation weighted across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum bid on official company letterhead, including a detailed cost breakdown for labor, materials, and equipment. Required documentation includes a valid Maryland Contractor's License, W9, completed vendor questionnaire, and proof of insurance, specifically naming Adams and Associates, Inc. as an additional insured. The contract is subject to the Davis-Bacon Act and requires compliance with specific wage rate decisions and net 30 payment terms.
Woodland Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 238330
New
SLED
FLOORING REPLACEMENT AT 115 PLEASANT STREET, CONCORD, NH (SUPPLY AND INSTALL)
Solicitation # 2e83faf8-521b-41d8-8d59-3946d2c3690b
The State of New Hampshire is soliciting bids for a turn-key flooring replacement project at 115 Pleasant Street in Concord, NH. The scope of work involves the removal and disposal of approximately 2,170 square feet of existing vinyl composite tile and 543 linear feet of cove base, to be replaced with Tarkett Instudio commercial vinyl planking and Johnsonite model CB-63 burnt umber cove base. The project must be completed no later than December 23, 2026, with the vendor providing all necessary labor, tools, materials, and permits. Key technical requirements include the submission of a moisture testing compliance certificate before installation and the elimination of PVC or polystyrene for health and environmental reasons. Award selection is based on the lowest cost submitted by a responsible vendor who meets all specifications. Eligible vendors must be registered with the NH Bureau of Purchase and Property and be in good standing with the NH Secretary of State. Required documentation includes proof of comprehensive general liability insurance and compliance with Workers' Compensation laws. Payments are processed via ACH 30 days after the agency accepts the completed work, provided that invoices are submitted to the designated email with a valid purchase order and contract number. Bids must be submitted via email to the NH Bureau of Purchase and Property by the December 9, 2026, deadline.
Das Purchasing (statewide Bids & Contracts)

POSTED

about 17 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The California Department of Transportation is seeking a subcontractor for a commercial flooring installation project. The scope of work involves installing durable, slip-resistant flooring materials, specifically tile, luxury vinyl tile, or epoxy coatings, within designated restrooms and locker rooms. This project falls under NAICS code 238330. The solicitation was posted on April 24, 2025, and the deadline for responses is May 28, 2025. Interested parties can find further details and submission guidelines through the Cal eProcure portal.

General Info

Caltrans seeks a flooring subcontractor for restrooms and locker rooms by May 28, 2025.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 32A0632.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

*Certified SB/DVBE only* Bathroom Remodel - San Bernardino County

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • GYM FLOOR REPLACEMENTOpen now, due in 6 days
  • Exterior Basketball Court RepairOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of durable, slip-resistant flooring such as tile, luxury vinyl tile (LVT), or epoxy coatings in restrooms and locker rooms.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project issued by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29, from Coyote Creek Bridge to Diener Drive/Road 543, and Route 53 at Route 29. Key activities include cold planing of AC pavement, installation of Rubberized Hot Mix Asphalt Gap Graded overlay, and Hot Mix Asphalt Type A surfacing. The project also involves bridge work at Coyote Creek Bridge, drainage improvements, utility plans, and the installation of sinusoidal rumble strips and traffic stripe tape. The estimated cost for the project is 14.4 million dollars. Bids must be submitted via the Bid Express website by January 6, 2027, and must include bidder security of at least 10 percent of the bid. Proposed project durations must fall between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and includes strict requirements for Buy America/Build America compliance and environmental product declarations for concrete and asphalt. Contractors must adhere to rigorous environmental standards, including specific pressure washing protocols for equipment to prevent the spread of invasive species and compliance with the RWQCB basin plan. Performance must begin within 55 days of contract approval by the Attorney General, with a notice of start required 72 hours prior to activity. The project mandates the use of prevailing wages and requires a certified safety representative with specific Cal/OSHA or OSHA training and professional certifications. Quality control personnel must hold ACI Concrete Field-Testing Technician Grade 1 certification. Temporary concrete barriers must be fabricated at authorized facilities and meet MASH Test Level 3 safety standards.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS