Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Commercial Public-Use Spray Ground Construction

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Roseville, CA, 95678, USA

Set-Aside

NONE

Documents

This scope was carved out of 13-201.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vernon Street Town Square Fountain Renovations

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Roseville
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the complete design-build installation of a commercial public-use spray ground for prime contractors on municipal projects. Installs spray ground structures, finishes, self-modulating balance tanks, and associated mechanical and electrical systems. Requires a supervisor with 5 years of experience and a record of 3 municipal spray grounds over 1,000 sq. ft. built since 2020. Delivers a commissioned, warranted spray ground system.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Roseville

Same awarding agency

NAICS: 237310
New
SLED
Historic Old Town Parking Lot Improvement Project
Solicitation # 500545
The Historic Old Town Parking Lot Improvement Project, solicitation number 500545, is a construction contract issued by the City of Roseville, California, to develop an at-grade surface parking lot and alleyway aesthetic improvements. The scope of work includes extensive site preparation such as clearing, grubbing, and the off-hauling of 5,000 to 8,000 cubic yards of soil, followed by the installation of hot-mix asphalt pavement, concrete flatwork, and comprehensive underground utilities including water, sewer, storm drain, and electrical systems. Additional requirements involve landscaping, irrigation, decorative steel fencing, and the installation of EV charging stations with associated lighting and electrical equipment. The contract will be awarded to the lowest responsible bidder based on the Grand Total Bid Price. All work must adhere to the City of Roseville Design and Construction Standards, California MUTCD for pavement markings and signage, and ADA compliance for accessible paths of travel. Key deliverables include a Storm Water Pollution Prevention Plan and a Rain Event Action Plan. The successful contractor must provide performance and payment bonds, certificates of insurance, and ensure all labor complies with California prevailing wage rates. Bids must be submitted in a sealed physical format by the deadline of November 10, 2026.
Highway, Street, and Bridge Construction

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
SLED
Vernon Street Town Square Fountain Renovations
Solicitation # 13-201
The City of Roseville is soliciting lump sum bids for the renovation of the Vernon Street Town Square fountain and spray ground located in Roseville, California. The project scope includes limited demolition, the construction of a new balance tank, and the removal and replacement of below-grade piping. The contractor will be responsible for installing spray ground structures, surface finishes, and comprehensive mechanical and electrical systems. The base bid may be supplemented by two additive alternates: the installation of granite pavers instead of broom finished concrete and the use of specific colored concrete. Because the site will remain open to the public during construction, the contractor must coordinate site security and minimize impacts to public access. The contract will be awarded based on the Grand Total Bid Price, which includes the base bid and any selected alternates. Bidders must demonstrate a prerequisite experience with park projects of similar size and scope completed within the last three years. The work must be completed within 50 business days of the Notice to Proceed, with a detailed preliminary progress schedule due within 20 days and a Critical Path Method schedule due within 30 days. Payment is processed monthly with a five percent retention held by the City. Technical requirements include strict adherence to ASTM, NECA, NEMA, and UL standards, with specific labeling and marking requirements for electrical components. All materials must be delivered in original unopened containers and stored under cover. The contractor is required to provide a Public Works Faithful Performance Bond and a Labor and Materials Payment Bond, and must comply with California prevailing wage rates and OSHA safety regulations. Bids must be submitted under sealed cover, including all required proposal forms and a Project Qualifications/Experience Sheet, to be considered responsive.
Other Heavy and Civil Engineering Construction

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS