Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on August 25, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Common Science Support Pod Ice Imaging System for Monitoring Changing Ice Sheets(Icepod)

Closed
FY11A5RMFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 18 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

VA

Set-Aside

NONE

Documents

3

CDRL+A001.docx

DOCX

CDRL+A002.docx

DOCX

CDRL+A003.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W39L USA Ng Readiness Center
Contacts2 people available
OfficeARLINGTON, VA, 22204-1382, USA
Office AddressARLINGTON, VA, 22204-1382, USA
Contacts
Willie M. JeffersonContract Specialist
Walter HallmanProgram Manager

Full Description

Show more
STATEMENT OF WORK Common Science Support Pod (CSSP) and Ice Imaging System for Monitoring Changing Ice Sheets (Icepod) 1. Scope: The vendor shall support the CSSP/Icepod program. This consists of an Airdyne developed pod, Columbia University provided instrumentation, and Airdyne supported integration, testing and documentation. 2. Background: The U.S. National Science Foundation (NSF) is responsible for coordinating all US research in Antarctica. A critical component of this mission includes airborne remote sensing. To achieve cost effective airborne remote sensing "data" collection the NSF and the ANG 109th AW (NY) have decided to implement a long-range data collection mission on the LC-130. The Integrated Science Instrumentation System (ISIS) incorporates roll-on/roll-off technology to enable the science community to quickly install and operate scientific instrumentation on the LC-130. The ANG already possesses some of the equipment necessary to implement the capability (SABIR articulating arm) and the only remaining major component is a multi-mission pod designed for use with a variety missions. This SOW addresses the definition, specification, program sequencing, schedule, cost and overall work effort to design, fabricate, test, and airworthiness certification of an integrated multi-sensor pod for use in the ISIS program. In addition to the CSSP the NSF/ANG are using the Icepod program as the first program to make use of the new capability. This SOW also addresses the integration, test, and certification of the Icepod system. 3. Program Objectives: a. Develop, deliver, and test a Flight Certified Common Science Support Pod (CSSP) that will host a variety of scientific instrumentation. The CSSP consists of the pod, mounting system, and associated AC/DC power backbone to support an internal common power interface and required wiring harnesses. The CSSP shall be capable of mounting on either the left or right hand side of the aircraft. b. Integrate Columbia University's Icepod instrumentation into the CSSP c. Support flight-testing and flight certification of the CSSP and the Icepod system. 4. Tasking: a. Design, develop, and fabricate a Common Science Support Pod (CSSP) i. Design, build and deliver a CSSP. The pod shall include an internal common power interface and required wiring harnesses. ii. Include the necessary pod heating and cooling to support the Icepod program within the range of known GFE sensors and median commercial sensor temperature specifications for Antarctic operations as a worst case. iii. Include the necessary electrical and data wiring to support installation of Columbia University initial future sensors to be able to "plug and play." Data interfaces may be through a common unit or individual wiring depending on the nature of the sensors and control system used inside the aircraft. ? b. Support integration of the Icepod sensor suite into the CSSP i. Establish requirements for integration of the initial Columbia Icepod sensors into the CSSP and maximize remaining pod space to allow addition of more internal sensors. ii. Build the necessary wiring and connector interfaces to support the operation of the Icepod sensors iii. Design, develop and fabricate pod external antenna mounts for the Low Band Radar for antennas furnished by the Government within the aerodynamic, loads and stress, of the pod and SABIR AS-7 arm. A separate loads and stress analysis may be required under a separate contract, or contract modification, for the final antenna configuration as determined by Columbia University. iv. Integrate Icepod sensors, antennas and cabling into the CSSP. v. Perform liaison engineering with Columbia University Principle Investigators. c. Flight Certification i. Prepare required documentation and engineering drawings for the SPO to meet schedule milestones. This package includes the necessary loads and stress reports and documentation required for SPO CCB approval. (A001) d. Fit and Operational Check (Ground Only) i. The CSSP/Icepod shall be fit checked on an Air Force LC-130 at the 109th AW. The fit check will be 4 days or less and includes travel. ii. The fit check will include installation of the CSSP/Icepod on the SABIR AS-7 Arm; configure wire harnesses through the arm, and connection to internal aircraft power and pod/sensor control system. iii. The fit check will ensure the system powers on and all component locations are finalized for in-flight use. iv. The fit check may be separate from other Government testing and integration efforts. e. Ground and Flight Testing: i. CSSP/Icepod Test Instrumentation - The vendor shall support the assigned Responsible Test Organization (RTO) in developing an Instrumentation Plan (IP). Once the IP is approved, the vendor shall procure equipment (i.e. strain gauges, data collection unit, cabling, connectors, harnesses, etc.), assist in installation, and perform calibration. ii. Icepod EMC/EMI Ground and Flight Test. - The vendor shall support an EMC/EMI ground and flight test. This effort supports flight certification of the Icepod mission payload for airworthiness and approval to fly on the LC-130 from the C-130 SPO. This may be performed in conjunction with the Icepod Mission Payload Test and travel is required. iii. Aircraft Handling Qualities Flight Test: The vendor will support a 2-week aircraft handling qualities test at a TBD Government location and includes travel to support the flight test. This testing may be separate from the mission testing of the Icepod instrumentation. The vendor will support RTO's development of the Aero Handling Flight Test Plan. iv. Icepod Mission Payload Flight Test - The vendor shall support a 2-week Icepod flight test at the 109th AW and in Greenland. This support includes installation and removal of the CSSP and the associated Icepod equipment and travel to support the flight-testing. v. Test Plan and Reports - Work and coordinate with C-130 SPO test group and 330th Test Group (Warner Robins) to write the SABIR test plans and reports. f. Project Meetings - Three (3) formal meetings to support program at 109th, Columbia University, Warner Robins AFB or Andrews AFB. Travel is required to support these meetings. 5. Deliverables: (Provisions should be made to allow for invoicing as individual items are delivered) a. Pod: i. AS-4 Common Science Support Pod (acceptance testing not required for pod delivery) ii. AC/DC Power backbone for the Icepod integration effort to include a power supply sized for use in a large percentage of the science programs iii. SPO design and airworthiness certification compliance program plan and status update (A002) iv. Integrated Master Schedule b. Engineering, Integration, and Flight-Test Support: i. Instrumentation Plan for CSSP flight-testing ii. Data cables for sensors if not provided as GFE iii. Test instrumentation Package iv. Support RTO's drafting of flight test plan for certification of CSSP v. Support the RTO's generation of the CSSP flight test report vi. Mission Test report for post flight testing of the Icepod system, coordinated with Columbia University vii. Build mounts for external sensors and antennas to accommodate the Icepod program 6. Reporting Requirements: The contractor shall prepare and deliver the following: a. Monthly progress reports: Reports shall include a summary of accomplishments, updated integrated master schedule, updated delivery schedules, and a financial section with expenditures. (A003) 7. Government Furnished Equipment: a. SABIR Articulating arm for flight test b. Avionics rack(s) c. Icepod sensors i. Ice Radar LRU's and supporting sub-assemblies ii. Ice Radar Antennas iii. LIDAR iv. Non-Gimbaled IR camera. v. Other sensors or sensors with mounting assemblies completed. vi. Special mount units for sensors as required. vii. Sensor cables as required. 8. Government Furnished Information: a. Icepod System Functional Specification. Will cover high-level design and performance requirements. b. Co-Site RF Analysis for POD use on LC-130 as required by the SPO c. Gain Analysis of candidate Ice Radar antennas for use in determining final antenna configuration for Ice Pod. 9. Travel: Several of the tasks involve travel and the cost is built into the specific tasking. For all other travel, the vendor is responsible for expenses and arrangements. 10. Options: a. Option years of 12 months each for additional pods. Actual cost defined at the time of option award. i. AS-4 Multi-Mission Pod (2) (Long) ii. AS-4S Multi-Mission Pod (2) (Short) b. Option years of 12 months each - Additional Engineering, Integration, and Flight-Test Support. Contractor will provide a cost proposal defining the level of effort and tasks required prior to option award. 11. Security: This project is unclassified 12. Shipping: Initial shipping for all hardware is the responsibility of the contractor. Any further movement of the hardware after delivery (unless directed by the contractor) is the responsibility of the Government. 13. Performance: a. Place of Performance: Airdyne's main manufacturing facility is in Calgary, Canada but additional manufacturing capability is available in Clearwater, Florida and portions and or all of the equipment may be manufactured at the alternate location. The addresses for both facilities are provided below: i. Airdyne Calgary Headquarters Airdyne R&D, Inc. Springbank Airport 200-132 MacLaurin Drive Calgary, Alberta, Canada T3Z 3S4 ii. Airdyne Spring Hill Facility Airdyne Aerospace, Inc. Hernando County Airport, 16316 Flight Path Drive Spring Hill, Florida, USA 34604 b. Period of Performance: All equipment deliveries and support efforts should be complete 18 months after contract award ? 14. Travel: This project shall require travel to the following locations and others, as required, to perform the tasks in this SOW: a. 109th AW, Scotia, New York, Columbia University, Warner Robins AFB, Andrews AFB b. Greenland. c. Antarctica. 15. Government POCs: a. Technical Point of Contact/CSSP-Icepod PM: Mr. Walter Hallman NGB/A5RM 3500 Fetchet Ave Joint Base Andrews 20762 240-612-9361; DSN 612 Walter.Hallman.ctr@ang.af.mil b. COR: Kyle Bybee NGB/A3 3501 Fetchet Ave Joint Base Andrews 20762 301-836-8047; DSN 278-8047 Kyle.Bybee@ang.af.mil

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS