COMPREHENSIVE EVERGLADES RESTORATION PLAN, BISCAYNE BAY COASTAL WETLANDS, L-31E FLOW-WAY, CONTRACT 5C (A PHASE I PROJECT): PUMP STATIONS S-710 AND S-711; SEEPAGE CANAL C-711W; MIAMI-DADE COUNTY, FLORIDA

Closed
W912EP21R0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the Pennsauken Community Pool Improvements project, solicitation number 2026-BID-15. The scope of work involves the rehabilitation, construction, and general improvement of the community pool, including site clearing, reinforced concrete flooring and wall construction, sandblasting the pool interior, and the installation of shade structures and electrical conduits. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction and comply with the Americans with Disabilities Act of 1990. The contract will be awarded to the lowest qualified responsible bidder. Bids must be submitted electronically via the OpenGov Procurement Portal. Per Addendum #01, the submission deadline is November 10, 2026, at 10:30 AM, and submissions must include a signed Acknowledgment of Receipt of Changes. Required documentation includes a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, and a Public Works Contractor Registration Certificate. The contract period is one year, with a possible one-year extension. Awarded contractors must comply with the New Jersey Prevailing Wage Act, mandatory affirmative action language, and provide a two-year maintenance bond. Payment is processed through the Township's governing body meeting cycle, contingent upon the submission of certified payrolls and itemized invoices.
Procurement

POSTED

about 10 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by Volusia County, Florida, to restore beach access at Seaview Avenue in Daytona Beach following destruction by Hurricane Ian. The project scope includes the demolition of damaged infrastructure and the construction of a new reinforced and unreinforced concrete vehicular ramp, a pedestrian sidewalk, curbing, and a composite sheet pile bulkhead with a concrete cap. The estimated construction cost is 1,213,413.00 dollars, with bids due electronically by November 5, 2026. Award will be granted to the lowest responsive and responsible bidder based on price, verified references, and demonstrated experience with similar projects. The project is subject to strict regulatory and technical requirements, including a Florida Department of Environmental Protection coastal construction permit that mandates specific protections for turtle nesting and lighting restrictions. Contractors must comply with FDOT traffic control standards, OSHA safety regulations, and federal provisions including the Davis-Bacon Act and E-Verify. Required deliverables include a payment and performance bond, comprehensive insurance coverage, and an as-built survey. Contract administration involves a 30-day payment cycle for undisputed invoices and a specific sales tax exemption procedure for materials. The County maintains the right to inspect all finished work, providing the contractor 20 days to remedy any punch list items before final acceptance.
Coastal

POSTED

about 12 hours ago

DEADLINE

in 7 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Documents

8

B.08.02+21R0021_BBCW_CNT5C_RTA_Vol1_21_06_08.pdf

PDF

B.08.02+21R0021_BBCW_CNT5C_RTA_Vol2_21_06_08.pdf

PDF

BBCW+Contract+5C+-+Final+BCOES+Cert+Plans+-+27+May+2021.pdf

PDF

MEMO+-+W912EP21R0021+Pre+-+bid+Site+Visit+%28CMR+esigned%29.pdf

PDF

W912EP21R0021+Amendment+0001.pdf

PDF

W912EP21R0021+Amendment+0002.pdf

PDF

W912EP21R0021+Amendment+0003.pdf

PDF

W912EP21R0021+Amendment+0004.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Type Changed

Solicitation → Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jul 22, 2021 to Jul 23, 2021.

Deadline changed

Response deadline changed from Jul 23, 2021 to Aug 3, 2021.

Deadline changed

Response deadline changed from Aug 3, 2021 to Aug 5, 2021.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
A Pre-Proposal Conference will be held on Thursday, 08 July 2021 from 10:00am - 11:00am, Local Time via teleconference. The call-in number is: +1 (555) 000-0000 Access code: +1 (555) 000-0000. It is requested that an email be sent to contact@example.gov to confirm attendance by your organization. DESCRIPTION OF WORK: The Biscayne Bay Coastal Wetlands (BBCW), Contract 5C covers the construction of Pump Stations S-710 and S-711, spreader systems, a seepage canal (C-711W), with associated berm, and the installation of a riser board assembly on the culvert located on the south bank of C-103, between S-710 and S-711, in the North Canal Wetland (NCW; the land south of C-103 being hydrated by S-710 and S-711). The riser board assembly will allow for water level management in the NCW. S-710 and S-711 are both 40 cfs pump stations located on the south bank of the C-103 that will pump water from C-103 and discharge it into the NCW through a dissipation/spreader basin and concrete-lined spreader channel for S-711 and a dissipation/spreader basin for S-710. C-711W (with the berm) will be located in the NCW, along the western boundary, to prevent NCW water from seeping to the west, onto private lands. C-711W will drain NCW seepage water to C-103, through a culvert, through the C-103 embankment. The pump stations will have manatee protective barriers, trash racks, and dewatering features, complete with stop logs. Controls will be located in a stand-alone, precast concrete building adjacent to the pump station structure. The pumps will have remote operation capability. Construction activities include installation of precast concrete, H-piles, king piles, sheet piles, concrete piles, precast concrete, cast-in-place concrete, tremie concrete, flowable fill, control buildings, pumps, pump platform, pump station controls, electrical work, lighting, lightning protection, fencing, excavation, backfilling, stockpiling, clearing and grubbing, grading, placement of topsoil, sodding, limerock road topping, riprap and bedding stone, installation of stilling wells, stilling well platforms, staff gauges and floating barriers. Additional construction activities may include dewatering, and installation of cofferdams. Florida Power & Light (FPL) will intercept, modify, and upgrade the existing overhead three-phase powerline at the intersection of SW 107th Avenue and 136th Street (south bank of Canal C-103 / Mowry Trail), to provide a new, overhead, three-phase powerline for Pump Stations S-710 and S-711. FPL will route the overhead powerline East along Canal (C)-103 (Princeton Trail), within the SFWMD 30-foot ROW, to the pump stations. The required run will be approximately 4,065 linear feet. FPL will provide and install overhead conductors, poles (approximate 27 poles), transformer(s), and other required hardware as shown on the contract plans, to provide a 277/480V, 60Hz, 250A service for S-711 and 277/480V, 60Hz, 250A service for S-710. In-water construction utilizing divers will be necessary, because of dewatering difficulty due to the local geology and high conductivity of the underlying limestone. Soil borings indicate the presence of hard limestone within the project area. Excavation of limestone may require large excavator with rock bucket. Materials for embankment and backfill construction can be obtained from offsite sources provided by the Contractor and approved by the Contracting Officer or the Contractor can process the excavated material to meet the classification of satisfactory material for embankment fill and or select fill at no additional cost to the Government. Contract does not allow blasting within the construction limits. PROPOSAL REQUIREMENTS: AWARD WILL BE MADE TO THE OFFEROR WHO SUBMITS THE LOWEST PRICED, TECHNICALLY ACCEPTABLE (LPTA) PROPOSAL. PROPOSALS WILL BE EVAULATED BASED ON TECHNICAL ACCEPTABILITY (DEMONSTRATED EXPERIENCE AND PAST PERFORMANCE) AND PRICE. The performance period is approximately 1113 calendar days after Notice to Proceed (NTP). The Request for Proposal (RFP) will be issued on or about 14 June 2021 and proposals will be due on or about 14 July 2021. NAICS Code 237990, size standard $39.5 million. Magnitude of construction is between $15,000,000.00 and $25,000,000.00. THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. Solicitation will be issued in electronic format only and will be posted on the Sam website at https://sam.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the beta.Sam website at https://sam.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call +1 (555) 000-0000 or visit the SAM website at https://www.sam.gov/.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS