Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Navy was posted on October 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

COMPUTER,DIGITAL — 7021017333480 — SPRPA126RYD26

Closed
SPRPA126RYD26Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334111
New
Federal
Single Slot Development Kit
Solicitation # 80NSSC27949109Q
NASA/NSSC is seeking a Single Slot Development Kit to support FPGA firmware and software development and testing for the Main Electronics Box (MEB) of the Compact Fire Imager (CFI) instrument. The government intends to award a sole source contract to NOVO SPACE, CO under the authority of FAR 12.102(a), as they have been determined to be the sole provider of the required kit. The procurement is classified under NAICS code 334111 and will follow the procedures prescribed in FAR Part 12 for commercial items or services. Performance will take place at the NASA Goddard Space Flight Center (GSFC) in Greenbelt, MD. The required development kit must be delivered by March 1, 2027, and must include an FPGA Electronics Board (FEB) featuring an AMD/Xilinx Versal SoC, a Microchip PolarFire FPGA, and at least 8 GB of ECC-protected DDR4 memory. Additional technical requirements include a mass memory module with at least 1.5 TB of non-volatile memory, a backplane breakout card with I2C serial port and JTAG interface, a mechanical chassis, and associated IP cores and drivers. The system must comply with VITA 78, VITA 57.1, and VITA 75.1 standards. Interested organizations may submit capability statements to the identified point of contact by November 27, 2026, for the purpose of determining if the procurement should be conducted on a competitive basis.
NASA Shared Services Center

POSTED

about 22 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Solicitation SPRPA1-26-R-YD26, issued by DLA Aviation at Philadelphia, is for the procurement of a digital computer classified as a Flight Critical Application Item. Due to the critical nature of the hardware, which is used in shipboard systems for aircraft launch and recovery, only manufacturers with engineering source approval from the Naval Air Systems Command are eligible for award. The procurement is being conducted under Emergency Acquisition Flexibilities and requires strict adherence to Technical Data Package version 004. Award will be made to a single, technically acceptable offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Quality assurance requirements are rigorous, mandating 100 percent inspection and documentation for all critical and major characteristics, as well as attributes for plating, hardness, and non-destructive testing. The contract requires First Article Testing on one uncoated unit, witnessed by government personnel, and mandatory source inspection by the Procurement Contracting Officer and DCMA Quality Assurance Representative. Contractors must utilize the Wide Area Workflow system for invoicing and comply with MIL-STD-130 for markings and MIL-STD-2073 for packaging. All production and first article units must be manufactured at the same facility, and records must be maintained for seven years.

General Info

DLA Aviation procurement for flight critical digital computers from approved Naval engineering manufacturers.

NAICS

334111 - Electronic Computer Manufacturing

Place of Performance

PHILADELPHIA, PA, 19111-5098, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstamendment
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Diesel Pump System Manufacturer/SupplierOpen now, due in 16 days
  • Correctional Tables (Round, Square, and Multi-Seat)Open now, due in 13 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Pa DLA Aviation At Philadelphia
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
TITLE=TEST REPORT
Description
TDP VERSION NUMBER 002 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3429AS6920; drawing number ( ;(30003); ) ;REVSION NONE; , Revision ;NAWC LAKEHURST; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=NAWCADLKE-MISC-482300-0480 |30003| D| |D| | | | DRAWING DATA=NAWCADLKE-MISC-482300-0546 |30003| -| |D| | | | DRAWING DATA=3429AS4108 |30003| C| |D| | | | DRAWING DATA=3429AS4900 |30003| D| |D| | | | DRAWING DATA=3429AS4914 |30003| C| |D| | | | DRAWING DATA=3429AS4918 |30003| C| |D| | | | DRAWING DATA=3429AS4960 |30003| A| |D| | | | DRAWING DATA=3429AS4961 |30003| B| |D| | | | DRAWING DATA=3429AS6920 |30003| -| |D| | | | DRAWING DATA=3429AS6924 |30003| -| |D| | | | DRAWING DATA=3429AS6926 |30003| -| |D| | | | DRAWING DATA=3429AS6927 |30003| -| |D| | | | DRAWING DATA=3429AS6928 |30003| -| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1.The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as de-fined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article: ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3.Production Lot Special Tests: N/A 4.N/A 5.N/A 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;APPLIES; 4.2.2 Requirements of: ;NAWC LAKEHURST; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;(30003); ) ;3429AS6920; , Revision ;REVISION NONE; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.6 Disposition of FAT samples 4.6.1 ; ; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;(30003); ; ), Part Number ;3429AS6920-1; ; , Revision ;REVISION NONE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;P.C.O; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;DCMA QAR; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE
REMARKS APPLY TO ITEM 0001 THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10143): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years.
Description
SUBMISSION DATES APPLY TO DID ITEM NR A001 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A001 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918.
Description
SUBMISSION DATES APPLY TO DID ITEM NR A002 DATE OF FIRST SUBMISSION=ASREQ
REMARKS APPLY TO DID ITEM NR A002 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection Data Requirements a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. j. Plating per Drawing 3429AS4918.

More opportunities from Department Of The Navy → Pa DLA Aviation At Philadelphia

Same awarding agency

NAICS: 336413
New
DIBBS
SRL POWER SUPPLY — 1680016185503 — SPRPA127RWA28
Solicitation # SPRPA127RWA28
This contract is a negotiated solicitation issued by the Department of the Navy's DLA Aviation at Philadelphia for the repair and overhaul of SRL Power Supplies (P/N 1680-01-5503). The scope of work requires the contractor to provide all necessary facilities, labor, materials, and tooling to return units to a Ready For Issue (RFI) condition, adhering to L3 Harris Technologies Inc drawing 2000792-1 and MIL-STD-130 marking standards. The contractor is responsible for all manufacturing aids and must maintain a quality management system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1. All materials used must be new per FAR 52.211-5, and any items determined to be Beyond Economical Repair (BER) or Missing on Induction (MOI) require written concurrence from DCMA and instructions from the Procuring Contracting Officer (PCO). The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price, with risk assessments conducted via the DoD Supplier Performance Risk System (SPRS). Deliverables must be preserved and packaged according to MIL-STD-2073-1 for system stock and marked per MIL-STD-129. Invoicing and payment requests must be processed through the Wide Area WorkFlow (WAWF) system. Inspection and acceptance will occur at the origin using the contractor's equipment. The contract incorporates several critical regulatory clauses, including DFARS 252.204-7012 for safeguarding covered defense information and various Buy American and trade agreement provisions. There is no specified set-aside status for this solicitation.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS