Comunidad Nuevo Lago Mobile Home Park Sewer Consolidation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Comunidad Nuevo Lago Mobile Home Park Sewer Consolidation Project, managed by the Malaga County Water District, involves connecting a 65-space mobile home park to the district's sewer collection system in unincorporated Fresno County. The scope of work includes constructing a new lift station at the mobile home park, installing a 4,000 linear foot force main, and extending gravity sewer mains, including 2,300 linear feet of 15-inch pipe and 5,300 linear feet of 12-inch pipe. The project also requires abandoning an existing 6-inch main and upgrading the wastewater treatment facility with new circular clarifiers, pump replacements, and flow meter installations. Once the connection is established, the existing mobile home park wastewater treatment facility will be demolished. Construction is expected to last approximately 24 months, with work occurring Monday through Saturday from 6 am to 6 pm. A strict operational sequence is required, ensuring downstream components and treatment plant improvements are completed before upstream systems are placed into service to maintain compliance with waste discharge requirements. The project is governed by CEQA and NEPA standards, with specific protocols for the discovery of archaeological or paleontological resources. While the mobile home park remains outside the district's sphere of influence, service will be provided via an Outside Agency Service Agreement. The district will own and maintain the new infrastructure within its boundaries, while the mobile home park retains responsibility for the lift station and upstream collection system.

General Info

Malaga County Water District connects Comunidad Nuevo Lago mobile home park to sewer system.

Agency

California → Malaga County Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

American Ave and Chestnut Ave, CA

Set-Aside

NONE

Documents

(5)

MCWD Comunidad Nuevo Lago MHP Sewer Consolidation Project NOI

PDFnotice-of-intent

Comunidad Nuevo Lago MHP Sewer Consolidation Project Summary Form

PDFsummary-form

Comunidad Nuevo Lago MHP Sewer Consolidation Notice of Determination

PDFnotice-of-determination

Comunidad Nuevo Lago Mobile Home Park Sewer Consolidation Project Notice of Completion

PDFnotice-of-completion

Draft Initial Study/Mitigated Negative Declaration for Malaga County Water District Sewer Consolidation Project

PDFinitial-study-mnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Malaga County Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Malaga County Water District
Office AddressN/A
Contacts
Charles Garabedian JrBoard President

Interested Companies (1)

Show more
Provost & Pritchard Consulting Group
Clovis, CA

Full Description

Show more
The Project proposes to construct a new lift station at the MHP, a new force main from the MHP to the MCWD Sphere of Influence (SOI) boundary at American Ave and Chestnut Ave, and a gravity sewer main as master planned to the point of connection with the existing MCWD sewer collection system. This includes extending the 15-inch sewer main in Maple Avenue from the WWTF to Malaga Avenue, a 12-inch sewer main in Malaga Avenue from Maple to Chestnut, then south in Chestnut to American Avenue. Extension of the gravity sewer line would allow for service of the area without the requirement for existing private lift stations which serve a few properties along the proposed pipeline route. Extension of the new 12-inch pipeline in Malaga Avenue would include the abandoning the existing 6-inch sewer main in Malaga Avenue and connection of the existing services to the new sewer main. Extension of the 12-inch diameter pipeline in Malaga Avenue would also allow for the connection of several properties that are presently served by septic tanks and leach fields. Similarly, extension of the new 12-inch sewer main in Chestnut Avenue south of Malaga would include the elimination of the existing 6-inch pipeline and relocation of the existing services to the new sewer main. The Project would also include improvements to the existing MCWD WWTF. This includes demolishing the equipment in the Dissolved Air Flotation (DAF) basin, installing one recirculating pump in the 3rd aeration basin, installing oil and grease removal in grit chamber, modifying the air piping, installing recirculation flow meter and sludge flow meters, removal of berms between disposal pond 1, 2 and 5, replacing one influent pump, replacing one blower, and constructing new circular clarifiers. Once the connection to the MCWD is completed, the existing MHP WWTF would need to be properly demolished. The proposed force main would be four (4) inches in diameter and approximately 4,000 linear feet (LF) long. The force main will include crossing of two Fresno Irrigation District Canals (Oleander Canal and Washington Colony Canal) by either jack and bore or directional drilling. The 15-inch gravity sewer main would be approximately 2,300 LF. The 12-inch gravity sewer main would be approximately 5,300 LF. The design includes twenty (20), 4-ft diameter manholes along the gravity sewer main alignment. Consolidation Process The Project would not require MCWD to update its SOI and annex the MHP. While the MHP is outside of the MCWD SOI and service area, MCWD would be willing to enter into an Outside Agency Service Agreement (Agreement) pursuant to Government Code Section 56133. Operations during Construction Impacts to both treatment plants operations would need to be minimized during construction. This would be primarily accomplished by effective scheduling of work activities, with some temporary bypass of flows. Installation of pipelines, absent the final connections to the existing systems and discharges to the MCWD WWTF, would be completed concurrently with other tasks. Traffic control, dust control, and worker protection would be accomplished throughout the duration of construction so as to minimize impacts to the MHP, MCWD, and the public. Detours of traffic and exclusion of pedestrians from the work area are routinely managed by construction contractors and would be coordinated with the MHP and MCWD for work affecting the respective facilities. It is a basic requirement that each downstream portion of the improvements be completed prior to upstream components being placed into service: • MCWD WWTF disposal ponds must be ready to receive treated wastewater for disposal prior to the MCWD WWTF discharge pipeline being placed in service. • MCWD WWTF process improvements must be complete to ensure wastewater discharges meet WDRs prior to receiving flows from the MHP. • The MCWD gravity pipeline needs to be completed and ready to receive flows prior to the MHP force main receiving flows from the MHP lift station. Diversion of the MHP collection system to the new lift station can only take place after all prior portions of the project are complete. • The MHP collection system must be connected to the new lift station prior to decommissioning and demolition of MHP WWTF and ponds. The MHP lift station would be sited in a manner such that it can be completed offline from the collection system without impacting the operation of the existing plant. On completion of the lift station, a manhole would be constructed to intercept the collection system upstream of the MHP WWTF. When all downstream components are complete, flows would be diverted and the MHP collection system connection to the MHP WWTF would be severed. Decommissioning of the MHP WWTF would then proceed. The effluent disposal facilities improvements at the MCWD WWTF, consisting of the pond modifications, can take place concurrently with work at the MHP and other areas in the Fresno County right-of-way (ROW). Improvements and repairs within the plant, such as replacement of an influent screw pump, replacement of a blower, addition of a recirculation pump, modifications to the anoxic basin, and installation of clarifiers can be accomplished by utilizing existing redundancy in the facilities to isolate work areas or installation of temporary bypass piping and pumping. The new circular clarifiers would need to be sited outside the footprint of the existing plant and connection of piping coordinated with the treatment plant operator to minimize disruption to the operation of the rectangular clarifiers, at least one of which would need to remain in service throughout. Construction Schedule Construction is anticipated over approximately 24 months. Generally, construction would occur between the hours of 6 am and 6 pm, Monday through Saturday, excluding holidays. Construction would require temporary staging and storage of materials and equipment onsite. Equipment Construction equipment would likely include excavators, backhoes, graders, loaders, saws, compactors, hauling trucks, and water trucks. Operation and Maintenance The newly installed gravity sewers and all infrastructure within the MCWD existing boundaries would be owned, operated, and maintained by MCWD. The MHP sewer collection system upstream of the lift station would remain the responsibility of the MHP. The lift station would be situated on MHP property, leaving the MHP responsible for its operation and maintenance.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS