Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Concessions Area Site Work and Concrete

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 25-8576.

The full solicitation package (22 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Barefoot Beach Restoration - Grant Funded

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Facilities & Redevelopment
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs concrete work and site improvements for prime contractors on Collier County beach restoration projects. Constructs new ADA access ramps, installs new showers on concrete pads, and installs Mobi mats for beach access. Delivers concrete shower pads, access ramp, and installed Mobi mats.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Install Concrete Pad for Metal Storage Building at Fire Station #63
Solicitation # FIRE-0302
The City of Santa Cruz Fire Department has issued Invitation for Bids FIRE-0302 for the installation of a concrete pad and associated utilities to support a metal storage building at Fire Station 63. The project scope includes the demolition and removal of existing AC material, trenching for electrical and fire sprinkler lines, and the installation of a 35 by 42 by 4 inch concrete pad designed to support fire apparatus weighing approximately 55,000 lbs each. Additionally, the contractor is responsible for removing an existing storm drain inlet connection and installing a new bio-retention area. The project budget is capped at 200,000 dollars, with a mandatory pre-bid meeting scheduled for November 10, 2026, and a bid submittal deadline of November 19, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with local business preferences of 2 percent for City of Santa Cruz businesses and an additional 4 percent for locally owned businesses. The anticipated initial term is six months, with the option for two six-month extensions. Requirements for the successful bidder include providing bid, performance, and payment bonds from California admitted sureties, paying prevailing wages, and maintaining registration with the California Department of Industrial Relations. All work must comply with CAL/OSHA safety standards, the 2022 California Green Building Standards Code, and approved structural calculations valid through the end of 2026.
Fire

POSTED

about 15 hours ago

DEADLINE

in 14 days
View Details

More opportunities from Florida → Facilities & Redevelopment

Same awarding agency

NAICS: 237990
New
SLED
Barefoot Beach Restoration - Grant Funded
Solicitation # 25-8576
Solicitation 25-8576 is a grant-funded, turn-key construction project for the Barefoot Beach Restoration in East Naples, Florida, managed by the Collier County Facilities and Redevelopment agency. The project aims to repair and restore park facilities and site improvements damaged by Hurricane Ian to return them to a safe and functional condition. The scope of work includes civil and site improvements such as pavement and curb restoration, ADA enhancements, mobi mat installation, and the repair of the concessions structure, chickee hut, and various fencing, gates, and signage. A bid alternate is also included for the maintenance of the butterfly garden and pond. The anticipated project budget is 1,087,934.87 dollars. The contractor is responsible for all labor, materials, equipment, and coordination, including the use of the Procore platform for project management. Work must comply with the Florida Building Code, ADA requirements, FDOT and Collier County standards, and specific ASTM and NFPA quality standards. Bids are due electronically by January 12, 2027, and must include a comprehensive set of forms, including a bid bond, professional licenses, and certifications regarding non-discrimination and immigration law. Performance and payment bonds for 100 percent of the contract amount are required. Construction must commence within five calendar days of the notice to proceed, with working hours generally limited to 7 a.m. to 7 p.m., Monday through Saturday.
Other Heavy and Civil Engineering Construction

POSTED

about 17 hours ago

DEADLINE

in 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS