Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Concord Blvd (Bailey Rd to Yolanda Ct), Myrtle Dr (Ayers Rd to Kirker Pass Rd), Mustang Ct

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Concord is advancing a public infrastructure project involving pavement repairs, curb ramp installations, and new pavement striping along Concord Blvd from Bailey Rd to Yolanda Ct, Myrtle Dr from Ayers Rd to Kirker Pass Rd, and Mustang Ct within the 94519 zip code. This effort is categorized as minor residential street maintenance under a California Environmental Quality Act (CEQA) categorical exemption, confirming it falls within routine public works that do not require extensive environmental review. The project scope is confined strictly to the existing public right-of-way with no expansion of streets or sidewalks, and work is expected to comply with standard municipal practices and accessibility requirements. All deliverables must be completed on-site, with final acceptance residing with the City of Concord as the lead agency, though no formal inspection criteria or quality standards are explicitly outlined in the available documentation. Despite the project being referenced in a forecast notice posted on August 4, 2025, and signed on August 1, 2025, no contract value, pricing details, or financial terms have been disclosed. No formal solicitation number, contract type, or procurement methodology such as LPTA or best value is specified, indicating the process is administrative rather than competitively bid under federal or state contracting rules. The submission process for environmental compliance requires physical delivery of an original and two copies of the Notice of Exemption, a $50 check payable to Contra Costa County, two self-addressed stamped envelopes, and a certified exemption document, with no electronic submission options available. Key administrative contacts include Gerardo Avila as the Consultant Project Manager and Bruce Davis as the Lead Agency Contact, but no Contracting Officer, COR, COTR, or formal payment office details are provided. No Federal Acquisition Regulation clauses, packaging standards, marking requirements, or socioeconomic certifications are applicable or included, as the documentation reflects a localized, non-federal infrastructure initiative governed by state and municipal protocols rather than federal procurement regulations.

General Info

Concord to repair pavements, install curb ramps on select streets under CEQA exemption, no disclosed budget or bidding process.

Agency

California → City of Concord

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Bailey Rd to Yolanda Ct, Ayers Rd to Kirker Pass Rd, Mustang Ct, Concord, CA, 94519

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Residential Pavement Maintenance Concord Blvd

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Concord
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Concord
Office AddressN/A
Contacts
Gerardo AvilaConsultant Project Manager

Full Description

Show more
The project will construct pavement repairs, curb ramps, and striping on Concord Blvd, Myrtle Dr, and Mustang Ct.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will revitalize the entry and exit drives along 19th Ave W, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in deteriorated condition will be milled and resurfaced, while aging stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines into dedicated storm drainage systems, with water quality treatment incorporated where qualifying pavement surfaces are replaced. The remaining concrete slab from Phase 1 will be demolished to make way for a blended layout of new parking spaces and native green space designed as a pollinator habitat, potentially housing a stormwater treatment facility. An irrigation system will be installed to support the new landscaping, which will also extend to the median along the entry drive. New electric vehicle charging stations will be integrated into the expanded parking area, and a protected two-way bike lane will be constructed to connect the terminal’s entry directly to the West Wall bike path, enhancing multi-modal accessibility. Pedestrian pathways will be upgraded to improve connectivity to the intersection of 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be enhanced throughout the newly configured parking and path areas, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists through the redeveloped campus. The project is forecasted to be solicited under NAICS code 237310 by the Port of Seattle’s Waterfront Project Management office, with primary contact information provided for project inquiries and coordination.
Waterfront Project Management

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Unit Price Portwide 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities across multiple Port of Seattle locations including Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haul and disposal of grinding spoils, removal of existing striping, surface preparation for new markings, various stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and drainage system enhancements. All work requires adherence to performance standards and may involve obtaining necessary permits for improvements to public infrastructure. This procurement is issued under the title Asphalt Paving & Striping Unit Price Portwide 2026 by the Port Construction Services division of the Port of Seattle. The solicitation is posted as a forecast with a NAICS code of 237310 indicating highway and street construction. Primary point of contact is Heather Bowden, with Lesley Miles serving as project manager; inquiries should be directed via their provided email addresses and phone numbers. The contract will be administered across numerous port-wide sites with performance expected to meet specified technical and safety requirements, though no specific location details are provided in the data. The forecast date of July 31, 2026, suggests this is a planning notice for future work, not an active solicitation.
Port Construction Services

POSTED

about 9 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
ITB 26-141 Small County Outreach Program (SCOP) Milling & Resurfacing Project for E. Gospel Island Rd (CR 470) from N. Apopka Ave. to SR 44
Solicitation # 26-141
Citrus County, Florida, is soliciting bids for the milling and resurfacing of E. Gospel Island Road (CR 470) from N. Apopka Ave. to SR 44 under Solicitation Number 26-141, with a response deadline of September 15, 2026. The project, estimated at $4,142,947, involves removing approximately four inches of existing asphalt and placing a four-inch overlay using SP 12.5 and FC 12.5 asphalt mixtures with PG 76-22 polymer-modified binder, along with full restoration of pavement markings, signage, and road edge conditioning in compliance with FDOT Greenbook Design Standards, MUTCD, and AASHTO geometric standards. Work must be substantially completed within 90 days of the Notice to Proceed and finally completed within 120 days, under a unit-price contracting method with payment tied to verified quantities such as square yards milled and tons of asphalt placed. The county retains the right to inspect and accept work on-site, requiring Engineer Certification of Completion before formal acceptance. All bidders must operate as responsible entities with verified Unique Entity IDs, comply with strict cybersecurity, insurance, and ethical requirements, including mandatory $1,000,000 cyber insurance coverage maintained for three years post-completion, level II background checks for personnel, E-Verify usage for all employees, and full flow-down of debarment, EEO, and confidentiality clauses to all subcontractors. Insurance mandates include workers’ compensation and Longshoremen Act coverage, with certificates specifying 30-day cancellation notice and retroactive coverage aligned to contract start. Bidders must submit comprehensive documentation via the OpenGov portal, including certifications of insurance, qualifications, FDOT pre-qualification, asphalt mix design, and affidavits addressing human trafficking, conflict of interest, lobbying, and non-collusion. No size or socioeconomic status certifications are required, though DBE compliance is referenced in funding contexts. The award will go to the lowest responsive and responsible bidder whose proposal, evaluated holistically on qualifications, compliance, cost structure, and proposed subcontractor credibility, best serves the county’s interest, with no formal LPTA designation applied. The project is federally aided and governed by FDOT and FHWA guidelines, with all contractual obligations surviving completion, and no options or extensions provided.
Technical Services

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
B027-17 CDBG Sidewalks, Curbs and Ramps
Solicitation # B027-17
The contract B027-17 CDBG Sidewalks, Curbs and Ramps, issued by the Economic Development agency of Connecticut through the City of Meriden, will fund the construction of approximately 8,200 square feet of new sidewalk, 1,650 square feet of driveway apron, 1,620 linear feet of concrete curb, and 750 square feet of handicap-accessible ramps to improve pedestrian infrastructure and accessibility. The solicitation was posted on August 1, 2026, with responses due by August 25, 2026, and is classified as a public works project subject to Connecticut’s prevailing wage law under General Statutes Section 31-53, requiring all contractors and subcontractors to pay workers the legally mandated wage rates for the region and trade. In addition to wage compliance, all mechanics, laborers, and on-site workers must complete a 10-hour OSHA construction safety and health course, with proof of completion required for contract compliance, ensuring adherence to federal and state workplace safety standards. The project is funded through the Community Development Block Grant program and is subject to enforcement by the Connecticut Department of Labor, with noncompliance potentially resulting in contract termination or financial penalties. All work is to be performed within the City of Meriden, Connecticut, and contract inquiries should be directed to Susan Martel, Contract Specialist, or Rawle Dummett, Procurement officer, using the contact information provided.
Economic Development

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details