Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Concrete and Reinforced Masonry Construction

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of IFB27-0059.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Lift Station No. 145 and 146 Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 45 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom Lift Station No. 145 and 146 Improvements
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs concrete structures and CMU walls for prime contractors on City of Orlando Public Works water reclamation projects. Casts-in-place concrete for decks and pads, constructs CMU block wall extensions and retaining walls, and installs concrete reinforcement per ACI 315. Uses ASTM A615 reinforcing steel and ASTM C90 loadbearing concrete masonry units. Delivers completed concrete pads, retaining walls, and CMU wall extensions.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
DCR-26-HCCC-0013 Temp Sally Port Staircase
Solicitation # B27000826
The Department of Corrections and Rehabilitation for the State of Hawaii is soliciting bids for the installation of temporary pedestrian access and security improvements at the HCCC Main site, specifically adjacent to the Punahele Building and medical container area. The project scope includes the installation of a concrete stair set, a concrete walkway, two pedestrian gates with fence modifications, a removable steel security plate with hardware, and a temporary rain cover or awning. The contractor is responsible for all labor, materials, equipment, and supervision, including mobilization, demolition, and final restoration and cleanup. All work must be performed in accordance with federal, State of Hawaii, County of Hawaii, OSHA, and industry standards, following the owner-provided layout markup. This is a lump sum bid solicitation with a response deadline of December 15, 2026. The contractor must provide a proposed schedule and clearly identify any assumptions, exclusions, and lead times. Required certifications include a general excise tax license from the State of Hawaii, a tax clearance certificate from the State and IRS, and a certificate of compliance from the Department of Labor and Industrial Relations. Payments are issued upon the submission of original invoices certifying that services were performed according to the contract. There is no specified set-aside status for this solicitation.
Department of Corrections and Rehabilitation

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 237110
New
SLED
Lift Station No. 145 and 146 Improvements
Solicitation # IFB27-0059
The City of Orlando is soliciting sealed electronic responses for the construction and rehabilitation of Lift Station No. 145 and No. 146 Improvements located in the Country Club Villas Subdivision. The project requires the contractor to provide all labor, materials, and equipment necessary to deliver a complete and operational lift station system. Key deliverables include the operational systems, comprehensive instructional manuals in both hard copy and electronic formats, and the provision of training for the owner's personnel on the operation and maintenance of the installed equipment. The contract will be awarded to the low bidder based on the Base Bid price. Bidders must submit their responses electronically via the OpenGov portal by January 7, 2027, at 7:00 pm. Required submission documents include a bid form, affidavits of non-collusion and compliance with responsible contractor policies, a list of valid contractor licenses, and a five-year history of similar projects and claims. Contractors must adhere to strict material packaging and labeling standards, including specific requirements for painting materials, reinforcing steel, and electrical identification. Performance and payment bonds, as well as a 10% bid bond security, are required. The project is subject to the Davis-Bacon Act, requiring the payment of regional hourly wages and the submission of certified payrolls. All work must comply with City, County, State, and Federal codes, including ADA specifications for lighting fixtures and the Trench Safety Act.
Water and Sewer Line and Related Structures Construction

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1)
Solicitation # ITB-2026-050
The City of North Miami Beach is soliciting sealed bids for the Highland Village Stormwater Improvements Project (Phase 1), identified as ITB-2026-050. The project scope involves furnishing all labor, materials, and equipment to install backflow prevention devices upstream of existing outfalls near NE 25th Avenue. Key work includes excavation, demolition, installation of drainage structures, connection to the HDPE storm sewer system, relocation of water services and mains, and the restoration of sod, sidewalks, and pavement. The project is subject to the Build America, Buy America (BABA) Act and Davis-Bacon wage determinations, and requires compliance with state NPDES requirements for stormwater erosion and sedimentation control. The contract will be awarded to the lowest priced responsive and responsible bidder. To qualify, bidders must hold a valid State of Florida license and have completed at least three similar projects in Florida within the last two years, with at least two located in Miami-Dade or Broward County. Required submissions include a bid security of 5% of the bid amount, a valid local business tax receipt, and proof of OSHA 10-hour Construction Safety certification. Prime contractors must allocate at least 15% of the total contract value to certified SBE, MBE, or WBE subcontractors. Bids must be submitted electronically via the City's eProcurement portal by December 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
SLED
Lift Station No. 85 Replacement
Solicitation # IFB27-0027
The City of Orlando is soliciting bids for the replacement of Lift Station No. 85, located at 3915 South Lake Orlando Parkway in Orlando, Florida. The project scope includes the construction of a new submersible pump type lift station, a new electrical building, and the installation of gravity sanitary sewers, water services, and a stormwater and stone bed conveyance drain system. The estimated project value is $21,204,000, and the contract will be awarded to the lowest responsive and responsible bidder based on the total base bid. The period of performance requires substantial completion within 730 days of the start date, with a mobilization requirement of 10 calendar days following the Notice to Proceed. Responses must be submitted electronically via the OpenGov portal by December 4, 2026. Required submittals include a price proposal, bid bonds with 10% security, and affidavits of non-collusion and compliance with the City's Responsible Contractor's Policy. The contractor must adhere to Davis-Bacon Act prevailing wage rates for heavy construction in Orange County and comply with NPDES stormwater regulations and ADA accessibility codes. There is no set-aside status for this solicitation. Payment is managed through signed applications for payment and the submission of certified payrolls via the City's electronic tracking system.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in about 2 months
View Details
NAICS: 339950
New
SLED
2709ITB - Citywide Banner Printing & Fabrication
Solicitation # 2709ITB
The City of Daytona Beach is soliciting bids for the as-needed printing, fabrication, finishing, packaging, and delivery of various citywide banners and large-format signage, including vertical pole banners, horizontal street-span banners, event and promotional banners, facility banners, and yard signs. This solicitation, identified as 2709ITB, is for production and delivery only, specifically excluding mounting hardware installation, permitting, and maintenance unless separately authorized. The contract will be awarded to the lowest responsive and responsible bidder based on the combined total of all line item unit costs in the base bid pricing proposal. A local vendor preference is applied if a local bidder's offer is within 10% of the lowest non-local offer. The contract features an initial three-year term with two optional one-year renewals. Bidders must have an active, permanent, and successful operation for at least three years and must provide a bid security equal to 10% of the bid. All submissions must be made electronically via the OpenGov platform, with a final bid opening extended to November 24, 2026. Deliveries are to be made to the Public Works facility at 950 Bellevue Ave, with specific turnaround times ranging from 5 to 10 business days depending on the product category. Required documentation includes a W-9 form, a Human Trafficking Affidavit, and a drug-free workplace certification.
Sign Manufacturing

POSTED

5 days ago

DEADLINE

in about 3 hours
View Details
NAICS: 237310
New
SLED
Lower Spring Branch Stormwater Improvements
Solicitation # 14-0048-EN
The Lower Spring Branch Stormwater Improvements project, solicitation 14-0048-EN, is a construction effort by the City of Clearwater, Florida, aimed at flood reduction. The scope of work includes the replacement of bridges on Springtime Avenue and Overbrook Avenue, as well as the installation of a double concrete box culvert on Douglas Avenue. The project is estimated at 5 million dollars and must be completed within 548 consecutive calendar days. The contractor is required to provide fixed project signs and must submit current licenses or registrations with the state of Florida and Pinellas County. Technical standards follow the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, with specific requirements for TEAM insert valves and cable manufacturing dates. The contract will be awarded to the lowest responsible and responsive bidder. Bidders must provide bid security equal to 10 percent of their maximum bid price and ensure their engineer possesses Advance Temporary Traffic Control Certification. The project involves coordination with Frontier Communications for utility work and adheres to USACE Nationwide Permit 14. Acceptance of work, including pavement density and VVDS testing, is managed by the Engineer, with specific requirements for core sampling and written authorization before final paving. There is no set-aside status specified for this solicitation.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS