Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on January 27, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Batch Plant Site Development at Montgomery Locks and Dam in Beaver County, PA

Awarded
W911WN23B8001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Unclaimed Freight Company Building
Solicitation # 27-2084-1118
Solicitation RFQ No. 27-2084-1118, issued by the City of Newport News Codes Compliance department, seeks a contractor for the demolition and removal of a 17,775-square-foot commercial structure located at 10615 Jefferson Avenue, Newport News, VA. The building has been deemed an unsafe structure and fire hazard, leading to a court-ordered demolition. The scope of work includes the removal and legal disposal of all personal property and debris, though a specific revision in Addendum 1 excludes the removal of the concrete slab. The project must be completed within 15 days, with liquidated damages of 500.00 dollars per calendar day assessed for delays beyond the substantial completion date. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price, considering factors such as technical capacity, past performance, and financial resources. Bidders must submit a bid bond of 5 percent of the bid amount, a W-9, and a list of at least three similar projects completed within the last five years. The successful contractor must adhere to the Hampton Roads Planning District Commission Regional Construction Standards, Sixth Edition, and the Newport News City Code. Additionally, the contractor is required to use the Projectmates system for electronic invoicing and must comply with various federal and state nondiscrimination and safety laws. Payment terms are set to Net 30 Days unless otherwise specified.
Codes Compliance

POSTED

about 14 hours ago

DEADLINE

in 4 days

General Info

Contract Value

$13,632,692.63

NAICS

238910 - Site Preparation Contractors

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

2

W911WN23B8001+-+Bid+Opening+Attendance.pdf

PDF

W911WN23B8001+-+Bid+Opening+Results.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jan 10, 2023 to Jan 20, 2023. The notice description changed. The point of contact changed.

Deadline changed

Response deadline changed from Jan 20, 2023 to Jan 27, 2023.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA

Full Description

Show more
The Concrete Batch Plant Site Development consists of the following work tasks and activities: a. Furnish and Install all related erosion and sedimentation controls(E-SC), stormwater management controls, stormwater drainage facilities, including site perimeter bypass flow channel(s), sediment basin / stormwater pond, all related perimeter and in-pad piping, inlets, and outflow aprons and pipe connections, and temporary fencing. b. Perform all related tree cutting, clearing and grubbing, demolition, excavation, providing and installing additional soil (if needed) to rough-grade the site and proper, legal removal and disposal of unacceptable material from the site. c. Provide a compacted aggregate (gravel) final graded surface and perform final grading of the site to the elevations required. d. Remove all related security and protective fencing from above esplanade sloped area, store material that is reusable and provide new (perimeter) fencing of the type and form where shown on contract drawings. e. Provide retaining wall structures along two alignments, to support the developed site, consisting of:(1) One approximately 920 foot long, 12+/- foot high, post and panel retaining wall and transitions to grade along the south side of the site. (2) One approximately 785 foot long, 14+/- foot tall post and panel retaining wall and associated soil anchors, associated access stairways and ramps, and transitions to grade, along the north side of the site (within an existing area of sloped concrete pavers), and removal and replacement of concrete lined ditch and base of wall. f. Provide reinforced concrete transformer pads and accessory items (including all noted conduit penetrations, conduit, grounding, elbows, secondary duct bank, electrical vault) on the site, where designated. Included with the electrical work is continuous SECTION 01 11 00 Page 2100% CERTIFIED FINAL - W911WN23B8001 Montgomery Locks and Dam Concrete Batch Plant Site Development coordination with local power company and maintaining existing electrical service to esplanade during all construction operations for the duration of the period of performance of the contract. g. Construct approximately 215 feet of a 24-foot wide access driveway to the site from an existing adjacent paved roadway (Montgomery Dam Road). h. Rehabilitate approximately 175 feet of existing access roadway (Montgomery Dam Road) leading to the esplanade, including road widening, milling, leveling, paving, removal of old and installation of new guide rail, traffic control. i. Perform all work related to meet other regulatory / permit requirements. j. Construct, transport, place and anchor 29 large and small brush reef bundles using approved tree and brush material from site Clearing and Grubbing Operations. (1) Transport large and small brush reef bundles from the site location to the Montgomery Slough located across the Ohio River from the Montgomery lock and just upstream of the Montgomery Dam. (2) Method of transportation used to Montgomery Slough shall be approved by the Contracting Officer or designated representative. On 27 January 2023, the Bid Opening was held virtually at 11:00am EST. Bid Opening Results and Attendance Sheet are attached.

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 7 days
View Details
NAICS: 238210
New
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for a 100% Small Business Set-Aside project to replace the structural standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project, categorized under NAICS 238160, has a rough estimate between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of the existing roof system, box gutters, scuppers, and lightning protection, as well as the refurbishment of up to 95 linear feet of cold-formed metal sub-framing. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall, sealing and insulating the concrete roof slab to R-30, and installing a new gutter system and a certified, non-penetrating Lightning Protection System compliant with LPI 175, NFPA 780, and UL 96A. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Key personnel requirements include a Project Superintendent and a Quality Control System Manager, each with at least five years of relevant experience, and a Site Safety and Health Officer meeting EM 385-1-1 qualifications. Performance and payment bonds are required if the contract price exceeds $150,000. Final acceptance is contingent upon successful watertightness testing per AAMA 501:2 procedures and the delivery of a UL Master Label or LPI Certificate of Conformance.
Roofing Contractors

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
New
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS