Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on August 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Curb & Gutter Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
SLED
Install Concrete Pad for Metal Storage Building at Fire Station #63
Solicitation # FIRE-0302
The City of Santa Cruz Fire Department has issued Invitation for Bids FIRE-0302 for the installation of a concrete pad and associated utilities to support a metal storage building at Fire Station 63. The project scope includes the demolition and removal of existing AC material, trenching for electrical and fire sprinkler lines, and the installation of a 35 by 42 by 4 inch concrete pad designed to support fire apparatus weighing approximately 55,000 lbs each. Additionally, the contractor is responsible for removing an existing storm drain inlet connection and installing a new bio-retention area. The project budget is capped at 200,000 dollars, with a mandatory pre-bid meeting scheduled for November 10, 2026, and a bid submittal deadline of November 19, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with local business preferences of 2 percent for City of Santa Cruz businesses and an additional 4 percent for locally owned businesses. The anticipated initial term is six months, with the option for two six-month extensions. Requirements for the successful bidder include providing bid, performance, and payment bonds from California admitted sureties, paying prevailing wages, and maintaining registration with the California Department of Industrial Relations. All work must comply with CAL/OSHA safety standards, the 2022 California Green Building Standards Code, and approved structural calculations valid through the end of 2026.
Fire

POSTED

about 15 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The contract calls for the installation of 15,221 linear feet of new concrete curb and gutter, encompassing all associated work such as formwork construction, concrete pouring, surface finishing, and comprehensive quality testing to meet ASTM standards and City of Fort Worth specifications. All components of the project must be executed in strict compliance with municipal and industry requirements to ensure structural integrity, durability, and safety. The work is classified as a subcontract under NAICS code 238110 and is part of a larger public infrastructure initiative managed by the City of Fort Worth in Texas. The solicitation was posted on August 5, 2026, with a response deadline set for September 3, 2026, at 7:00 PM. Interested parties must submit their proposals through the designated online platform before the deadline to be considered. The project does not specify any set-aside classifications, and performance is expected to occur within the jurisdiction of the City of Fort Worth, though exact location details are not provided. The opportunity is accessible via the BonfireHub platform for procurement submissions and further information.

General Info

Install 15,221 linear feet of concrete curb and gutter per Fort Worth specs by September 3, 2026

Documents

This scope was carved out of 26-0282.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PW 2027 Asphalt Resurfacing Contract 6, City Project No. 106821

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → City Of Fort Worth
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 15,221 linear feet of new concrete curb and gutter, including formwork, pouring, finishing, and quality testing per ASTM and city specifications.

More opportunities from Texas → City Of Fort Worth

Same awarding agency

NAICS: 238150
SLED
Meacham Airport Glazing Replacement CPN: 107016
Solicitation # 27-0020
The City of Fort Worth is soliciting competitive sealed proposals for the Meacham Airport Glazing Replacement project, located at 201 American Concourse, Fort Worth, Texas. The scope of work involves the renovation of the terminal building envelope, specifically the removal and replacement of all glazing, gaskets, sealants, and accessories from existing exterior aluminum storefront frames, curtain wall frames, and aluminum framed entrances. The estimated construction cost is approximately 2,705,670.00 dollars, and the project includes three optional alternates: the installation of new manual roller shades for the City of Fort Worth Aviation suite, similar shades for other tenant spaces, and the repainting of lobby gypsum board walls. Proposals must be submitted via the Bonfire portal by 2:00 PM on December 10, 2026. A pre-proposal conference is scheduled for November 12, 2026, and the deadline for inquiries is November 19, 2026. The City will select a contractor based on a best value evaluation, weighing references and experience (25 points) and previous work performed within the City of Fort Worth (5 points). A small business utilization goal of 30 percent is required, and proposers must submit a Small Business Utilization Plan to be considered responsive. Financial and legal requirements include a bid bond or cashier's check for 5 percent of the proposal amount, with payment and performance bonds required upon award for contracts exceeding 25,000 dollars. Proposers must also provide contractors general liability insurance and statutory workers compensation coverage. Proposals must include a separate 7.5 percent owner's contingency allowance, which remains under the sole control of the City. Technical compliance requires adherence to AAMA 501.2-25 testing standards for water penetration and strict adherence to manufacturer packaging and storage guidelines. Contractors are also required to pay prevailing wage rates and provide safety metrics, including OSHA TRIR and LTIR/EMR for the past three years.
Glass and Glazing Contractors

POSTED

13 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS