Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Concrete Flatwork and Curbing

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Concrete Flatwork and Curbing involves the installation of concrete improvements for prime contractors on street projects managed by the City of San Dimas Department of Public Works. The scope of work includes the delivery of a complete curb, gutter, and sidewalk system, specifically featuring 8 inch PCC curb and gutter, 5 foot wide PCC sidewalks, driveway approaches, PCC cross gutters, spandrels, and curb ramps equipped with truncated domes. All installations must adhere to SPPWC 110-2, 112-2, 120-3, and Caltrans A88A 2022 standards, including the use of half inch thick filler strips for expansion joints. The project is located in San Dimas, California, with a response deadline set for December 3, 2026.

General Info

Place of Performance

San Dimas, CA, 91773, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025-01.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Arrow Highway Street Improvement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 17 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Arrow Highway Street Improvement Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Dimas
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs concrete improvements for prime contractors on City of San Dimas Department of Public Works street projects. Installs 8” PCC curb and gutter, 5’ wide PCC sidewalks, driveway approaches, PCC cross gutters, spandrels, and curb ramps with truncated domes. Uses ½-inch thick filler strips for expansion joints per SPPWC 110-2, 112-2, 120-3, and Caltrans A88A (2022) standards. Delivers the completed curb, gutter, and sidewalk system.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of San Dimas

Same awarding agency

NAICS: 237310
New
SLED
Arrow Highway Street Improvement Project
Solicitation # 2025-01
The Arrow Highway Street Improvement Project, solicitation number 2025-01, is a construction contract issued by the City of San Dimas, California, for improvements from Maione Ave to Bonita Ave. With an estimated value of 4.2 million dollars, the scope of work includes the installation of curbs, gutters, and sidewalks, featuring half-inch thick filler strips for expansion joints. All hauling operations must utilize Super 10 dump trucks or transfer trucks. The project mandates strict adherence to the 2017 ADA Standards for Accessible Design and Build America Buy America requirements, which specify that over 55 percent of manufactured product components must be produced in the United States. The contract requires bidders to provide a statement of technical ability and experience, list all proposed subcontractors, and comply with 49 CFR 26 regarding Disadvantaged Business Enterprises. Successful bidders must provide performance and material bonds within ten days of signing and maintain insurance. Labor standards are governed by the Davis-Bacon and related Acts, requiring the higher of the state or federal prevailing wage. Quality control involves rigorous inspection processes, including the use of the Caltrans Authorized Materials List and the submission of test results for sieve analysis and sand equivalent within 72 hours of sampling. The response deadline for this solicitation is December 3, 2026.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS