Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Manhole and Utility Structure Adjustment

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for the adjustment of existing utility structures on street projects managed by the City of San Dimas Department of Public Works. The selected contractor will work for prime contractors to adjust sewer and storm drain manholes, utility boxes, meters, and valves to the new finished roadway grade in accordance with Section 302-14.6. Qualified bidders must possess a valid California Contractor License and DIR Registration. The project is located in San Dimas, California, and responses are due by December 3, 2026.

General Info

Place of Performance

San Dimas, CA, 91773, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025-01.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Arrow Highway Street Improvement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 17 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Arrow Highway Street Improvement Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Dimas
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs adjustment of existing utility structures for prime contractors on City of San Dimas Department of Public Works street projects. Adjusts sewer and storm drain manholes, utility boxes, meters, and valves to the new finished grade per Section 302-14.6. Requires California Contractor License and DIR Registration. Delivers utility structures adjusted to final roadway grade.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Colgate Penstock Rebuild And Tunnel Repair Project
Solicitation # 11494
The Yuba County Water Agency is soliciting qualifications for the Colgate Penstock Rebuild and Tunnel Repair Project in Dobbins, California. This project utilizes a Construction Manager/General Contractor (CMGC) delivery method, encompassing both preconstruction and construction services. The scope is divided into two primary components: the New Colgate Tunnel Project, which involves localized demolition, concrete repair, and anchor installation, and the Colgate Penstock Rebuild Project, which includes the installation of new penstock sections, foundation construction, excavation, and instrumentation. The project follows a phased timeline with design milestones reaching 100% completion by May 2027, with construction anticipated to begin in early fall 2027. The contract will be awarded on a best-value basis, with evaluation weights focusing heavily on project understanding and approach (20%) and constructability analysis methods (20%), followed by representative project experience (15%) and long-lead procurement strategies (10%). Applicants must demonstrate significant financial and operational capacity, including a minimum bonding capacity of $300 million and general liability insurance of at least $10 million per occurrence. All work must comply with California Department of Transportation Standard Specifications and prevailing wage requirements. Submissions must be submitted electronically via the Euna portal by December 17, 2026.
Yuba County Water Agency

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Norwich Waterfront Revitalization
Solicitation # 27-37
The Norwich Waterfront Revitalization project, managed by the City of Norwich, Connecticut, is a comprehensive construction effort with an anticipated duration of 270 days. The base bid scope includes the construction of a restroom and mechanical building, a combined splash pad and ice rink slab with utilities, a pre-engineered band shell with a concrete stage, and various site improvements such as concrete sidewalks, plazas, stairs, retaining walls, and bituminous concrete pavements. Additionally, the project covers essential storm, water, sewer, and electrical utilities, as well as landscaping. Bid alternates include the Rose Alley Pump Station force main replacement, West Main Street access, restroom building façade upgrades, a restaurant expansion at 150 Chelsea Harbor Drive, and boat launch removal and infill. The contract will be awarded to the lowest responsible and qualified bidder, with evaluation based on skill, ability, integrity, and past performance. For projects valued at $1,000,000 or more, contractors must be prequalified by the Connecticut Department of Administrative Services. Key financial and legal requirements include a 5% bid surety, and performance and payment bonds each equal to 100% of the total proposal price. The contractor must adhere to prevailing wage rates under C.G.S. § 31-53c and maintain commercial general liability insurance. Furthermore, the contract mandates a 25% set-aside for DAS-certified subcontractors, with a specific 6.25% goal for minority, women, and disabled-owned businesses. Proposals must be submitted via the City of Norwich Procurement portal by January 11, 2027.
DAS Procurement

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → City of San Dimas

Same awarding agency

NAICS: 237310
New
SLED
Arrow Highway Street Improvement Project
Solicitation # 2025-01
The Arrow Highway Street Improvement Project, solicitation number 2025-01, is a construction contract issued by the City of San Dimas, California, for improvements from Maione Ave to Bonita Ave. With an estimated value of 4.2 million dollars, the scope of work includes the installation of curbs, gutters, and sidewalks, featuring half-inch thick filler strips for expansion joints. All hauling operations must utilize Super 10 dump trucks or transfer trucks. The project mandates strict adherence to the 2017 ADA Standards for Accessible Design and Build America Buy America requirements, which specify that over 55 percent of manufactured product components must be produced in the United States. The contract requires bidders to provide a statement of technical ability and experience, list all proposed subcontractors, and comply with 49 CFR 26 regarding Disadvantaged Business Enterprises. Successful bidders must provide performance and material bonds within ten days of signing and maintain insurance. Labor standards are governed by the Davis-Bacon and related Acts, requiring the higher of the state or federal prevailing wage. Quality control involves rigorous inspection processes, including the use of the Caltrans Authorized Materials List and the submission of test results for sieve analysis and sand equivalent within 72 hours of sampling. The response deadline for this solicitation is December 3, 2026.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS