Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Concrete Footing and Foundation Work

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails excavation, formwork, and concrete pouring for fence post footings on a federal wildlife refuge site, requiring strict adherence to specified depth and structural standards to ensure long-term durability and compliance with environmental and safety regulations. All work must be performed with minimal disruption to the natural habitat, reflecting the sensitivity of the location under the jurisdiction of the Department of the Interior through its Construction A/e Team 1 Fws. This subcontract, classified under NAICS code 238110 for foundation contractors, is part of a broader infrastructure initiative on public land managed by the federal government. The project has no set-aside designation and is posted for potential contractors to submit bids with performance expected to meet rigorous federal construction protocols. The place of performance is within a designated wildlife refuge, necessitating coordination with environmental compliance teams and adherence to site-specific restrictions despite the absence of detailed geographic coordinates in the documentation.

General Info

Excavation, formwork, and concrete footing installation for fence posts on federal wildlife refuge with strict environmental compliance.

Agency

Department Of The Interior → Construction A/e Team 1 FwsView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

VA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 1 Fws
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Construction A/e Team 1 Fws
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, formwork, and pouring of concrete footings for fence posts in accordance with specified depth and structural standards on a federal wildlife refuge site.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Biffy Facility ImprovementsThe Port of Seattle’s Aviation Project Management Group is preparing to undertake significant improvements to its Biffy Facility, focusing on the construction of a new non-combustible, explosion-proof structure with integrated interior and exterior lighting, ventilation, and space heating for freeze protection. The facility will be equipped with fire extinguishers, surveillance cameras, and access doors designed for safe equipment operation, while all interior surfaces will meet sanitization standards per NFPA 820 and FDA guidelines. A redundant pump system with a duplicate backup pump and biffy tank will be installed to ensure uninterrupted operation and prevent backflow, significantly enhancing system reliability. Emergency safety features including an eyewash station and emergency shower with tempered water will be provided to meet personnel safety requirements. The project also includes comprehensive upgrades to the facility’s electrical and mechanical infrastructure, channel drains, and wet well cleaning systems to support long-term operational efficiency and regulatory compliance. All work must be executed with strict attention to safety and sanitation standards, ensuring the facility remains functional in hazardous conditions while maintaining hygiene protocols. The solicitation is forecasted for release, with Jay Kim from the Port of Seattle identified as the primary point of contact and Rishiraj Savita as the project manager overseeing contractor coordination. No formal solicitation number has been issued yet, but the project falls under NAICS code 238110 for plumbing, heating, and air-conditioning contractors, and is expected to advance on the Port’s procurement timeline following the posted date of July 23, 2026.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 238110
New
SLED
Curb Removal and ReplacementThe contract pertains to the removal and replacement of damaged curbs and the installation of ADA-compliant curb ramps as part of a broader parking lot rehabilitation project under the jurisdiction of the Akron Metropolitan Housing Authority. Work is to be performed in Akron, Ohio, and must adhere to accessibility standards to ensure full compliance with federal and state requirements for individuals with disabilities. The scope includes all necessary labor, materials, and equipment to safely remove existing compromised curbs, prepare the site, and install new curbs and ramps that meet current ADA guidelines, with attention to proper slope, width, and surface texture to guarantee safe and legal access. This is a subcontract opportunity with a North American Industry Classification System code of 238110, indicating it falls under the paving and contracting sector. Responses are due no later than August 19, 2026, at 6:00 p.m., and the solicitation was posted on July 22, 2026. The project is not subject to any specific set-aside designation, and while the exact point of contact information is not provided, all inquiries must be directed through the official portal linked in the posting. Performance is strictly limited to the designated location in Akron, and contractors must ensure timelines and quality standards align with the housing authority’s expectations for public infrastructure improvements.
Akron Metropolitan Housing Authority

POSTED

1 day ago

DEADLINE

in 27 days
View Details

More opportunities from Department Of The Interior → Construction A/e Team 1 Fws

Same awarding agency

NAICS: 541620
Federal
Environmental Compliance and Monitoring SupportThis contract entails on-site environmental monitoring services to ensure strict adherence to the Endangered Species Act during construction activities. The primary responsibility is to identify and respond to the presence of threatened or endangered species in real time, with an immediate and mandatory shutdown of all work if such species are detected. The scope of work is centered on compliance, requiring continuous surveillance by qualified personnel to prevent habitat disruption and legal violations. All monitoring must be conducted in alignment with federal conservation standards and regulatory expectations set forth by the Department of the Interior. The contract is awarded as a subcontract under NAICS code 541620, indicating it involves environmental consulting and related services. It is managed by Construction A/e Team 1 Fws, acting under the authority of the Department of the Interior, and is positioned for performance in an unspecified location, suggesting flexibility in geographic application. The monitoring effort is not a passive compliance check but an active, dynamic safeguard requiring immediate operational intervention. Work stoppage is non-negotiable upon species detection, emphasizing the priority of species protection over project timelines. The contract reflects a high-stakes environmental responsibility where timing, accuracy, and responsiveness are critical to avoid regulatory penalties and ecological harm.
Environmental Consulting Services

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 562111
Federal
Wood Deck Demolition and DisposalThe contract entails the complete demolition and proper disposal of an existing wood deck, requiring strict adherence to all applicable environmental regulations and on-site safety protocols to ensure minimal ecological impact and worker protection. All work must be conducted in compliance with federal and local standards, including the handling and removal of hazardous materials such as treated lumber, paint, and fasteners, with appropriate documentation for waste tracking and disposal methods. The project is assigned a NAICS code of 562111, indicating it falls under waste collection and treatment services, and is structured as a subcontract under the Department of the Interior through Construction A/e Team 1 Fws. The solicitation was posted on July 9, 2026, with responses due by July 30, 2026, providing contractors a window of approximately three weeks to prepare and submit proposals. The place of performance and specific location details are not disclosed in the data, suggesting the work may occur at one or more sites managed by the Department of the Interior, potentially on federal lands or facilities under its jurisdiction. There is no set-aside designation specified, meaning the contract is open to all qualified subcontractors regardless of business size or ownership characteristics. Interested parties must access the official SAM.gov portal for full details and submission requirements.
Solid Waste Collection

POSTED

14 days ago

DEADLINE

in 7 days
View Details
NAICS: 237990
Federal
Design-Build Rehab of the Southgate Rec. Area (DeSThe contract is for the design-build rehabilitation of the Southgate Recreation Area at the DeSoto National Wildlife Refuge in Harrison County, Iowa, under a Firm-Fixed-Price contract set aside entirely for small businesses as defined by the SBA. The solicitation, numbered 140FC226R0015, was posted on June 24, 2026, with responses due by July 24, 2026, at 3:00 p.m. local time, and must be submitted electronically to the designated point of contact. The work scope involves full coordination of design and construction activities, including submission of detailed construction documents at 60%, 90%, and 100% design milestones, along with a Design/Build Management Plan and Waste Management Plan. The contractor is responsible for compliance with federal, state, and local codes, including OSHA regulations, ASTM standards for soil compaction and asphalt testing, and environmental laws such as the Clean Air Act, Clean Water Act, and Endangered Species Act. Performance must begin within ten days of notice to proceed and be completed within 180 calendar days, with a target end date of February 1, 2027. Work hours are strictly limited to one-half hour before sunrise to one-half hour after sunset, with no work permitted on weekends or federal holidays without written authorization. The contract incorporates numerous FAR clauses addressing ethical conduct, whistleblower protections, labor standards, trafficking in persons, privacy, security protocols, and small business utilization, along with specific provisions requiring personal identity verification for personnel accessing federal sites and adherence to enhanced security requirements. Environmental compliance is strictly enforced, mandating immediate work stoppage and reporting upon discovery of endangered species, archaeological artifacts, or hazardous materials, including potential asbestos. No compensation will be provided for work suspensions due to environmental or weather-related conditions, and the contractor assumes full financial liability for any government costs arising from environmental violations. Pricing details are not provided in the solicitation, as unit and extended prices are left blank across all itemized sections; however, the evaluation process prioritizes recent relevant experience as prime contractor—requiring at least two completed federal projects over $500,000 within the last five years—combined with technical capability and price reasonableness, using a trade-off method rather than LPTA. Offerors must be registered in SAM, possess a valid UEI and CAGE code, and submit all required representations and certifications, including small
Other Heavy and Civil Engineering Construction

POSTED

29 days ago

DEADLINE

in 1 day
View Details