Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Concrete Forming and Placement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Concrete Forming and Placement seeks a subcontractor to provide comprehensive services for the construction of structural and architectural concrete elements including slabs, walls, and footings. The scope encompasses all aspects of formwork installation, reinforcement placement, and the pouring and finishing of concrete in accordance with project specifications. Work is to be performed under the oversight of the Public Works agency in Virginia with a response deadline of August 13, 2026, and the opportunity is classified under NAICS code 238110 for concrete work contractors. The project is open to qualified subcontractors without a specific set aside or demographic preference stated, and all work must be completed at the designated performance location within Virginia. Interested parties must submit proposals prior to the deadline through the provided online portal.

General Info

Subcontractor needed for concrete forming, placement, and finishing in Virginia by August 13, 2026.

Agency

Virginia → Public WorksView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

VA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / Agency
Virginia → Public Works
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Formwork, reinforcement, and pouring of structural and architectural concrete elements such as slabs, walls, and footings.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Biffy Facility ImprovementsThe contract titled Biffy Facility Improvements involves comprehensive upgrades to a facility to meet stringent safety and sanitation standards, focusing on the construction of a new non-combustible and explosion-proof structure with full interior and exterior lighting, ventilation, and space heating for freeze protection. The facility will include cameras, access doors for equipment, and surfaces that are sanitizable in accordance with NFPA 820 and FDA guidelines. Critical safety features include an emergency eyewash and emergency shower station with tempered water, fire extinguishers, and a fully redundant pump system with a duplicate backup pump and biffy tank to prevent system failure and ensure backflow prevention. Electrical and mechanical infrastructure will be modernized, and new channel drains and wet well cleaning systems will be installed to enhance operational reliability and compliance. All components are designed for durability, safety, and ease of maintenance in a high-risk environment. The work will be executed under the oversight of the Aviation Project Management Group of the Port of Seattle, with Point of Contact Jay Kim serving as the primary liaison and Rishiraj Savita listed as the Project Manager. The contract falls under NAICS code 238110, indicating construction of building contractors for specialized trades, and is publicly forecasted with a posted date of July 31, 2026. No set-aside type has been designated, and while specific performance location details are not provided, the project is expected to occur at a facility managed by the Port of Seattle. All aspects of the project are geared toward achieving operational continuity, regulatory compliance, and enhanced worker safety in a mission-critical infrastructure setting.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 238110
New
Federal
C--Hart Bar Concrete Project
Solicitation # 140L4326Q0086
The Hart Bar Concrete Project is a small business set-aside solicitation issued by the Bureau of Land Management’s Oregon State Office under solicitation number 140L4326Q0086, aimed at awarding a firm-fixed-price construction contract for concrete work at the Hart’s Bar day use area near Plush, Oregon. The project requires excavation, placement of reinforced concrete using #3 rebar spaced at 18 inches on center with a 60 ksi yield strength, and compaction of 1.5-inch-minus base rock to a minimum depth of six inches, all in compliance with ASTM C94, A615, and C33 standards, and with a minimum 28-day compressive strength of 3,000 psi for the concrete. Work must be performed by a qualified small business concern and is subject to stringent site-specific requirements including limited work hours—only between one-half hour before sunrise and one-half hour after sunset, excluding weekends and federal holidays—and mandatory suspension of work if endangered species or archaeological resources are discovered, with immediate notification required to the Contracting Officer. Contractors must obtain prior approval for any substitutions of materials, personnel, or methods, and compliance with environmental laws including the Endangered Species Act, Clean Water Act, and National Historic Preservation Act is strictly enforced. Performance must be completed within 120 days of the notice to proceed, following a mandatory 30-day mobilization period, with all work performed on-site and subject to sequential government inspections prior to progression. Submission of proposals is restricted to sealed hard-copy bids delivered by noon local time on August 10, 2026, to the designated office in Portland, Oregon, with no electronic submissions permitted. Offerors are strongly encouraged to conduct a site visit through David McGhee in Lakeview, Oregon, to fully understand site conditions, as changes in conditions are governed by FAR clauses 52.236-2 and 52.236-3, which establish contractor responsibility for site investigation. The award will be made on a best-value basis, with price as the primary and determinative factor, and past performance considered only if needed to break ties or assess responsibility. Contractors must comply with extensive federal regulations including security requirements for personnel access, mandatory U.S. citizenship or lawful residency with three years of continuous U.S. presence, completion of a National Agency Check with Inquiries or higher-level background investigation, and adherence to the Department of the Interior’s prohibition
Oregon State Office

POSTED

about 21 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238110
New
Federal
Pre-Solicitation Notice for DCMR Outdoor Walkway Concrete Repair - U.S. Embassy Ankara, Türkiye
Solicitation # 19TU1526Q3005PSN
The U.S. Embassy in Ankara, Türkiye, has issued a pre-solicitation notice for the repair and restoration of approximately 25 linear meters of exterior concrete walkway at the Deputy Chief of Mission Residence. This notice is informational only and does not constitute a request for quotations or any obligation to award a contract. The work involves removal of deteriorated concrete, surface preparation, concrete repair or replacement, finishing, curing, protection, cleanup, and related incidental tasks to ensure a durable and complete restoration. The government plans to issue a Request for Quotations under FAR Part 13 procedures with applicable FAR Part 36 construction guidelines, and all responsible sources may submit quotations once the solicitation is posted on SAM.gov. The anticipated contract type is firm-fixed-price, with award expected to be made to the lowest priced technically acceptable quotation without requiring revisions. A site visit is planned, and details including date, time, security protocols, and access procedures will be provided in the upcoming RFQ. Only authorized personnel will be permitted on-site, and access must be coordinated through the Embassy. The NAICS code for this requirement is 238110, and the solicitation number is 19TU1526Q3005PSN. Quotations must not be submitted in response to this notice; all submissions will only be accepted after the official RFQ is published. Questions and inquiries should be directed to the U.S. Embassy Ankara Acquisitions Office at Ankara-GSO-Procurement-DL@state.gov.
US Embassy Ankara

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Virginia → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Patterson Ave Bike Lanes Phase II
Solicitation # 260015272
The City of Richmond, in partnership with the Virginia Department of Transportation, is advancing pedestrian and bicycle infrastructure improvements along the Patterson Avenue corridor through the Patterson Ave Bike Lanes Phase II project. This initiative aims to enhance safety and accessibility for non-motorized traffic by implementing dedicated bike lanes and related amenities as part of a broader effort to support sustainable transportation options. The solicitation, identified by number 260015272, was posted on July 31, 2026, with responses due by September 8, 2026, and is open to qualified contractors under a state and local government procurement process managed by the Richmond Public Works department. Technical and administrative inquiries should be directed to Tyrone Boyce, Traffic Engineer, or Ross Crawford, Procurement Analyst, via the provided contact details. The project’s place of performance is within the city of Richmond, Virginia, and all work is expected to align with local and state transportation standards. Contractors interested in participating must ensure compliance with all bid requirements and submit proposals through the official procurement portal before the deadline. The effort reflects a coordinated commitment between municipal and state agencies to improve multimodal transportation networks and promote greater mobility for residents and visitors alike.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
SLED
E. Broad St over Abandoned Railroad Spur Bridge Superstructure Replacement
Solicitation # IFB #260019489
The project involves replacing the superstructure of the E. Broad St over Abandoned Railroad Spur Bridge, a historic structure built in 1909 and eligible for the National Register of Historic Places as part of the Shockoe Valley Tobacco Row Historic District. The existing bridge is a simple span concrete-encased rolled steel beam structure with a 42-foot curb-to-curb roadway and 10-foot-9-inch sidewalks on each side. The superstructure will be removed and replaced with a 36-foot-3-inch precast box girder system, while preserving the original alignment, slope, and profile to avoid any fill or excavation. Final roadway dimensions will maintain 10-foot-11-inch travel lanes in each direction and 10-foot-4-inch sidewalks on both sides, ensuring continuity with the surrounding roadway. Portions of the existing reinforced concrete abutments and wingwalls will be demolished and reconstructed to accommodate the new superstructure while maintaining the current profile. The solicitation, issued by the Virginia Public Works agency under IFB #260019489, was posted on June 29, 2026, with responses due by August 13, 2026. The work is located in Richmond, Virginia, and falls under a state-level procurement process. Primary contact for technical inquiries is Timothy Lewis, Engineer, Principal, and Freddy Sharpe, Senior Procurement Analyst, serves as the secondary point of contact. No set-aside type is specified, and the project is not designated with a NAICS code in the provided data. The structure’s historical significance is preserved through strict adherence to existing design parameters, and no changes to the bridge's alignment or surrounding topography are proposed.
Highway, Street, and Bridge Construction

POSTED

about 1 month ago

DEADLINE

in 12 days
View Details