Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Concrete Mow Curb Installation

Open
State & Local
Response DeadlineDue in 22 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Fountain Valley, CA, 92708, USA

Set-Aside

NONE

Documents

This scope was carved out of 2612.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Fencing Project #15

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 22 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Fencing Project #15
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Garden Grove Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs concrete forming and pouring for mow curbs for prime contractors on Garden Grove Unified School District projects. Installs 12-inch by 6-inch concrete mow curbs with rebar in landscaped areas, including associated excavation and backfill. Requires California DIR prevailing wage rates. Delivers installed concrete mow curbs.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Sidewalk Repairs
Solicitation # R271189
The City of Mountain View is soliciting bids for as-needed concrete sidewalk cutting and hazard removal services to be established via an annual blanket purchase order. The scope of work involves horizontal sidewalk cutting to remove raised areas and the subsequent disposal of remnants, with all work performed in accordance with ADA requirements, City of Mountain View Standard Provisions, and Caltrans 2018 Standard Specifications. The initial contract period runs from January 1, 2027, through June 30, 2028, with four optional one-year renewals. The project is located in Mountain View, California, and requires the contractor to provide all necessary labor, materials, and equipment, including the posting of temporary no-parking signs 48 hours prior to work. To qualify, bidders must meet several mandatory requirements, including possessing a valid Class D06 license, proof of registration with the California Department of Industrial Relations, and evidence of having completed at least three similar projects within the last five years. Required insurance coverage includes General Liability ($2M per occurrence/$4M aggregate), Automobile Liability ($1M per occurrence), and Pollution Insurance ($1M per occurrence). For projects exceeding $25,000, a warranty bond and performance and payment bonds are required. Bids are due by December 10, 2026, via the PlanetBids portal. Payment terms are net 30 days following the acceptance of services and receipt of an accurate invoice.
City of Mountain View

POSTED

about 5 hours ago

DEADLINE

in 14 days
View Details

More opportunities from California → Garden Grove Unified School District

Same awarding agency

NAICS: 238990
New
SLED
Fencing Project #15
Solicitation # 2612
Fencing Project #15 (Bid #2612) is a lump sum contract for the Garden Grove Unified School District to perform demolition and installation of fencing at Mitchell, Monroe, and Palomino Elementary Schools in Fountain Valley, California. The scope of work includes removing existing chain-link fencing and footings and installing new 6-foot Ameristar Montage II Genesis 2 Rail Ornamental Iron fencing, black vinyl coated 6-foot chain-link gates at driveways, and 12-inch by 6-inch concrete mow curbs with rebar in landscaped areas. Additionally, the contractor must install Hurricane Manufacturing privacy slats at existing kinder yard fencing, verify linear footages, salvage and reinstall existing signs, and repair any irrigation or landscaping affected by the work. The contract will be awarded to the lowest responsive responsible bidder based on the base bid amount. Key performance milestones include a construction start date of January 25, 2027, with construction completion by April 1, 2027, and punch list completion by May 15, 2027. Bidders must provide a bid security of at least 10% of the total bid price and the successful contractor must furnish 100% performance and payment bonds. The project requires compliance with California Department of Industrial Relations prevailing wage rates, ADA standards, and the California Fire Code. There is no set-aside status for this solicitation. Required bid submissions must include a bid bond, designated subcontractors list, noncollusion declaration, and Iran Contracting Act certification.
All Other Specialty Trade Contractors

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 238290
SLED
District Office Elevator Refurbishment
Solicitation # 2605
The Garden Grove Unified School District is soliciting bids for the District Office Elevator Refurbishment project, which involves the modernization of two existing elevators. The scope of work includes selective demolition, construction, and a phased modernization sequence where Elevator No. 1 is refurbished and tested first while Elevator No. 2 remains in service, followed by the refurbishment and testing of Elevator No. 2. Additional requirements include the installation of temporary barricades to separate the work area from the occupied office, the export of all spoils off-site, and the restoration of affected irrigation and landscaping. Technical specifications encompass asbestos and lead abatement, penetration firestopping, interior painting, and common electrical work. Bids are due by December 10, 2026, and the contract will be awarded to the lowest responsive responsible bidder based on the base bid amount. The project is scheduled to begin construction on February 1, 2027, with a final completion date of November 30, 2027, and punch list completion by December 31, 2027. Bidders must hold a Class B contractor license and provide a 10% bid security, with the successful awardee required to furnish 100% performance and payment bonds. The contract requires compliance with California prevailing wage laws, ADA standards, and the submission of a comprehensive fire safety plan. Payment is structured at 95% of the value of work performed, with a 5% retention withheld from progress payments. There is no set-aside status specified for this solicitation.
Other Building Equipment Contractors

POSTED

8 days ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS