Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Fencing Project #15

Open
State & Local
Response DeadlineDue in 22 days
Solicitation #
2612

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Fencing Project #15 (Bid #2612) is a lump sum contract for the Garden Grove Unified School District to perform demolition and installation of fencing at Mitchell, Monroe, and Palomino Elementary Schools in Fountain Valley, California. The scope of work includes removing existing chain-link fencing and footings and installing new 6-foot Ameristar Montage II Genesis 2 Rail Ornamental Iron fencing, black vinyl coated 6-foot chain-link gates at driveways, and 12-inch by 6-inch concrete mow curbs with rebar in landscaped areas. Additionally, the contractor must install Hurricane Manufacturing privacy slats at existing kinder yard fencing, verify linear footages, salvage and reinstall existing signs, and repair any irrigation or landscaping affected by the work. The contract will be awarded to the lowest responsive responsible bidder based on the base bid amount. Key performance milestones include a construction start date of January 25, 2027, with construction completion by April 1, 2027, and punch list completion by May 15, 2027. Bidders must provide a bid security of at least 10% of the total bid price and the successful contractor must furnish 100% performance and payment bonds. The project requires compliance with California Department of Industrial Relations prevailing wage rates, ADA standards, and the California Fire Code. There is no set-aside status for this solicitation. Required bid submissions must include a bid bond, designated subcontractors list, noncollusion declaration, and Iran Contracting Act certification.

General Info

Lump sum contract for fencing demolition and installation at three Garden Grove schools.

Place of Performance

Fountain Valley, CA, 92708, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstifb
High

Read the document

Due in 22 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 22 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Garden Grove Unified School District
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #2612: Demolition of existing fencing and installation of new wrought iron and vinyl coated chain-link fencing and gates with concrete mow curbs at Mitchell Elementary School, Monroe Elementary School, and Palomino Elementary School. This includes removal of existing chainlink fencing, posts, accessories, attachments, and footings, and disposal of all demolished materials offsite. New installations will feature 6-foot Ameristar Montage II Genesis 2 Rail Ornamental Iron fencing and gates, and black vinyl coated 6-foot chainlink gates at driveways. Concrete mow curbs (12-inch by 6-inch with rebar) will be installed at new Ameristar fencing in landscaped areas. Hurricane Manufacturing privacy slats will be installed at existing kinder yard Ameristar fencing. The contractor is responsible for verifying linear footages, surveying and salvaging existing signs for reinstallation on new fencing, exporting all spoils, and reestablishing/repairing irrigation and landscaping affected by the installation.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD SD-462 Secondary Reactors Rehab. Phase 2 project is a comprehensive rehabilitation effort at the Main Wastewater Treatment Plant in California. The scope of work includes the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements involve the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and modifications to sluice and slide gates. Additionally, the project encompasses the rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactors. Managed by Ranger Pipelines Incorporated, the project has an estimated value between $18.5 million and $19.5 million. This solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The project seeks certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. Quotations are due by December 2, 2026.
Ranger Pipelines Incorporated

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details

More opportunities from California → Garden Grove Unified School District

Same awarding agency

NAICS: 238290
SLED
District Office Elevator Refurbishment
Solicitation # 2605
The Garden Grove Unified School District is soliciting bids for the District Office Elevator Refurbishment project, which involves the modernization of two existing elevators. The scope of work includes selective demolition, construction, and a phased modernization sequence where Elevator No. 1 is refurbished and tested first while Elevator No. 2 remains in service, followed by the refurbishment and testing of Elevator No. 2. Additional requirements include the installation of temporary barricades to separate the work area from the occupied office, the export of all spoils off-site, and the restoration of affected irrigation and landscaping. Technical specifications encompass asbestos and lead abatement, penetration firestopping, interior painting, and common electrical work. Bids are due by December 10, 2026, and the contract will be awarded to the lowest responsive responsible bidder based on the base bid amount. The project is scheduled to begin construction on February 1, 2027, with a final completion date of November 30, 2027, and punch list completion by December 31, 2027. Bidders must hold a Class B contractor license and provide a 10% bid security, with the successful awardee required to furnish 100% performance and payment bonds. The contract requires compliance with California prevailing wage laws, ADA standards, and the submission of a comprehensive fire safety plan. Payment is structured at 95% of the value of work performed, with a 5% retention withheld from progress payments. There is no set-aside status specified for this solicitation.
Other Building Equipment Contractors

POSTED

8 days ago

DEADLINE

in 14 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS