Specialized School Equipment and Furniture Installation

Open
State & Local
Response DeadlineDue in 56 days

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Cerritos, CA, 90703, USA

Set-Aside

NONE

Documents

This scope was carved out of 1712.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

E-Rate Cabling At Various Schools

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 56 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom E-Rate Cabling At Various Schools
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → ABC Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation of specialized equipment and furniture for prime contractors on ABC Unified School District projects. Installs network hubs and school-specific equipment per CSI MasterFormat sections 11 37 04, 12 02 25, 12 02 27, and 18 07 55. Requires compliance with Division of the State Architect (DSA) rules. Delivers installed equipment and furniture as specified in project drawings.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD SD-462 Secondary Reactors Rehab. Phase 2 project is a comprehensive rehabilitation effort at the Main Wastewater Treatment Plant in California. The scope of work includes the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements involve the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and modifications to sluice and slide gates. Additionally, the project encompasses the rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactors. Managed by Ranger Pipelines Incorporated, the project has an estimated value between $18.5 million and $19.5 million. This solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The project seeks certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. Quotations are due by December 2, 2026.
Ranger Pipelines Incorporated

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details
NAICS: 238990
New
SLED
Fencing Project #15
Solicitation # 2612
Fencing Project #15 (Bid #2612) is a lump sum contract for the Garden Grove Unified School District to perform demolition and installation of fencing at Mitchell, Monroe, and Palomino Elementary Schools in Fountain Valley, California. The scope of work includes removing existing chain-link fencing and footings and installing new 6-foot Ameristar Montage II Genesis 2 Rail Ornamental Iron fencing, black vinyl coated 6-foot chain-link gates at driveways, and 12-inch by 6-inch concrete mow curbs with rebar in landscaped areas. Additionally, the contractor must install Hurricane Manufacturing privacy slats at existing kinder yard fencing, verify linear footages, salvage and reinstall existing signs, and repair any irrigation or landscaping affected by the work. The contract will be awarded to the lowest responsive responsible bidder based on the base bid amount. Key performance milestones include a construction start date of January 25, 2027, with construction completion by April 1, 2027, and punch list completion by May 15, 2027. Bidders must provide a bid security of at least 10% of the total bid price and the successful contractor must furnish 100% performance and payment bonds. The project requires compliance with California Department of Industrial Relations prevailing wage rates, ADA standards, and the California Fire Code. There is no set-aside status for this solicitation. Required bid submissions must include a bid bond, designated subcontractors list, noncollusion declaration, and Iran Contracting Act certification.
Garden Grove Unified School District

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details

More opportunities from California → ABC Unified School District

Same awarding agency

NAICS: 238210
New
SLED
E-Rate Cabling At Various Schools
Solicitation # 1712
The ABC Unified School District is soliciting bids for E-Rate cabling at various schools in Cerritos, California, under solicitation number 1712. The project requires the contractor to provide all materials and labor for the installation of cabling, adhering to Title 24 of the California Code of Regulations, the California Building Code, and DSA rules. Technical specifications mandate the use of 23 AWG solid bare copper, UL listed CMP plenum fire rating, and a minimum 25-year manufacturer system warranty. Bids must be submitted by January 20, 2027, and must include a pricing attachment in Microsoft Excel-compatible (.xlsx) format. Award will be granted to the responsive and responsible bidder with the highest total evaluation score. The evaluation is weighted heavily toward E-Rate eligible costs (30%), followed by technical compliance and functionality (25%), prior experience and team qualifications (20%), project approach (10%), documentation and close-out (10%), and E-Rate ineligible costs (5%). Contractors are required to provide separate payment and performance bonds equal to 100% of the contract amount and must comply with prevailing wage laws. Payment is issued at 95% of the work performed, or 90% for projects designated as substantially complex, within 35 days of approval. Mandatory certifications include drug-free workplace, background checks, and CARB compliance.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS