Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Pad at Fresno 1106th AVCRAD

Closed
W912LA24Q0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-BID-007
Solicitation # 2026-BID-007
The Police Parking Improvements Project (2026-BID-007) for the City of Moraine, Ohio, involves expanding the parking lot and implementing other site enhancements at the Moraine Municipal Building located at 4200 Dryden Road. The base bid focuses on asphalt and concrete work to expand the parking lot where the existing canopy is located, with an engineer's estimate of $206,000. Additional optional improvements include a wrought iron fence with motorized gates (Alternate 1: $158,500), a dumpster pad and parking relocation (Alternate 2: $21,500), and utility conduits with parking lot lighting (Alternate 3: $54,900). The project is scheduled for a December 10, 2026 award date, with a final completion deadline of June 30, 2027. The contract will be awarded to the bidder offering the lowest and best proposal, based on price, technical compliance, and demonstrated competency via an experience statement. Bidders must submit all proposals electronically via Bid Express by October 22, 2026, including required affidavits, a bid guaranty, and a contract bond. This is a prevailing wage project requiring compliance with Ohio Department of Industrial Relations standards and ADA guidelines for sidewalks and ramps. Work must adhere to ODOT standards for asphalt concrete and ASTM D 1577 for fibers. The contractor is responsible for providing proof of insurance within ten days of the award and must furnish a maintenance bond upon project acceptance.
City of Moraine, OH

POSTED

about 13 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-0016
Solicitation # 2024-0022
The City of Centerville, Ohio, is soliciting bids for the Forest Brook Ditch Repairs project, with an engineer's estimate of 194,000 dollars funded by local sources. The scope of work involves pavement and joint maintenance, including the cleaning and sealing of longitudinal and transverse joints and miscellaneous cracks using Type II hot-applied fiberized joint and crack sealant. Additionally, the project requires the installation of Stress Absorbing Membrane Interlayer (SAMI) and concrete pavement repairs across locations including Ambridge Road, Forest Brook Avenue, and Green Road. The work is specifically focused on the open channel ditch from Clyo Road to the culvert pipe crossing under Forest Brook Boulevard. The project must be completed by October 31, 2027. Bids are due by October 29, 2026, at 3:00 PM and must be submitted via Bid Express. The contract will be awarded to the lowest and best bidder based on pricing, qualifications, experience, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and ethics laws. Required submission documents include a bid form, contract affidavits, a bid bond, and a certificate of liability insurance. Payments will be issued monthly based on the value of work and materials certified by the City Engineer, in accordance with Chapter 153 of the Ohio Revised Code. Contractors are responsible for worker safety and must adhere to ADA compliance for mat installations and Best Management Practices to prevent sediment from entering the storm sewer system.
City of Centerville

POSTED

about 13 hours ago

DEADLINE

in 9 days

General Info

Contract Value

$118,254.12

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Fresno, CA, 93727, USA

Set-Aside

SBA

Award Issued Date

Documents

8

AVCRAD Parts Shed Concrete Pads - Design Documents

PDF, High priority: read this first4 pages · specifications
High

Concrete Pad, 1106th AVRCRAD

PDF, High priority: read this firstspecifications
High

Fresno Concrete Pad Design - W912LA24Q0025

PDF, High priority: read this firstspecifications
High

Solicitation W912LA24Q0025 - Fresno AVC RAD Concrete Pad

PDF, High priority: read this firstrfp
High

TASMG AVCRAAD Parts Shed Concrete Pad Project Manual

PDF, High priority: read this first124 pages · specifications
High

W912LA24Q0025 Amendment 01 - Fresno AVCRAD Concrete Pad

PDF, High priority: read this first4 pages · amendment
High

W912LA24Q0025 Fresno Concrete Pad Amendment 02

PDF, High priority: read this first3 pages · amendment
High

W912LA24Q0025 Fresno Concrete Pad Amendment 03 Q&A

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7MX Uspfo Activity Ca Arng
Contacts2 people available
OfficeSAN MIGUEL, CA, 93451-5000, USA
Office AddressSAN MIGUEL, CA, 93451-5000, USA

Full Description

Show more
The contractor shall furnish and install labor and materials to construct a concrete pad IAW UFC 3-250-04 and the included designs outside of building 06B60- 12000 located at 5140 Dakota Avenue Fresno, CA. The work will include constructing a 5,460 sq ft pad 3000 psi 5 Portland Cement Concrete over 5 of aggregate base for butler building. Prep the soil to accept concrete and sub-base. Ensure concrete apron has a minimum of per foot slope. Slope concrete away from the building. All new work will ensure the existing level of safety within the facility is maintained or improved. The contractor is responsible for filling out the real property documents, forms 1354. Site Visit Info: 0900 Local, 29 Aug 5168 E Dakota Avenue Fresno CA 93727 Q&A (1) Please clarify the method of submission for the quote. (a) Please send your quote to Jackson.c.woods.civ@army.mil; paul.n.ochs.mil@army.mil; and ng.ngca.caarng.uspfo-construction@army.mil . Please do NOT mail your quotes. (2) Please clarify what documents are to be included in the response to the solicitation in addition to the SF 1442. (a) Contractors are required to send filled out SF 1442 and acknowledgement of amendments. However, it would speed up the award process if quoters submitted a price breakout and confirmed that their reps and certs on SAM.gov are current/accurate. If reps & certs on SAM.gov are not accurate/current, please submit reps & certs with your quote. (3) Wil there be a water supply on site, or will we need to bring in our own water from an external source? (a) No water supply provided on site. (4) Is there preference given to Veteran Owned Small Businesses or Service-Disabled Small Businesses? (a) At this time there is no preference given to VOSBs/SDVOSBs. (5) Para 5.3 states - Vehicles will not be returned without a ground guide. Once all trucks, including semi-trucks and concrete trucks, pass the gate threshold, will they be required to be ground guided in and out? (a) No ground guide required. Be mindful of parked equipment and will be marked off by engineering tape/partitions. (6) Para. 6.1 states - The PM/CM will designate an area that the contractor may use as a storage area. The contractor shall contact the CM/PM for information regarding parking areas to be used for contractor's equipment and by contractor personnel. In addition, any restrictions will be placed on contractor personnel while on the job site. Could you indicate the area designated for laydown yard? (a) Please see attached entry & laydown yard diagram. (7) Para. 3.1 B states - Remove unsuitable material not marked for salvage, including rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished work. Is the government planning to salvage the rubber mats, and when the contractor cuts the subgrade, will the 1106th express interest in retaining the material for other potential uses? Alternatively, should the contractor proceed with disposing of all materials? (a) Mats & hardware will be removed by 1106th AVCRAD Soldiers. The 1106th does not want to retain the material from the subgrade. Contractor will dispose of all materials. (8) Waste disposal - para. 1.3.1 states - Arrange for and dispose of surplus materials, waste products, and debris off-site Prior to making disposal on private property, obtain written permission from Facility Representative of such property. Will we need to establish a clean-out station for the concrete trucks in our laydown yard, or will there be a designated area for the trucks to clean out? (a) Clean out station can be set up in laydown yard. Prior to completion of the project, Contractor shall ensure laydown yard is returned to an acceptable condition. (9) Para. 3.6 B states - water or other dust control measures to common areas that will be used by all Bid Package Contractors. Coordinate dust control Work performed under this contract with the dust control work of other Bid Package Contractors. Will a water source be provided by the owner, or will the contractor need to source water from the city using a water truck? (a) The 1106th AVCRAD will not provide the water source. (10) Will the contractor have access to the shop where the roll-up doors and the walk-up door are located in order to ensure the concrete is finished properly? (a) Access will be available. (11) Will the gate of Dakota Avenue be the service gate for the contractor and material suppliers? If so, will clear access to project site be provided? (a) All supplies, vehicles, will check in/out at gate guard booth. (see map for truck entrance route to work site). (12) Will existing doors be able to be open once concrete is poured to assist in finishing the material? (a) Yes, roll up doors will be open as needed. (13) Will access to water and electricity be provided? (a) No access to water, electricity is available. (14) What are the hours of operation at this location for the contractor? (a) 0730-1600 Monday thru Friday. We are not open on Federal Holidays or weekends. (15) What is the security process for contractor employees? (a) All contractor employees will check in at the gate guard booth at the beginning of the day to obtain a visitor badge (must be worn on shirt & visible). Some form of ID will be given to the gate guard Soldier to hold while the Contractor is on base. When the contractor employees leave for the day, they will turn in visitors badge to gate guard and get their ID back. (16) Will the mats at the location be removed or is contractor required to remove and store on-site? (a) Mats & Hardware will be removed by Government. (17) Will utilities be marked or located or is that the contractor's responsibility? (a) This is the contractor's responsibility. See 2 of the Scope of Work on page one of the drawings. (18) Other than the PSI requirement, is there a specific concrete mix design for this project? (a) Strength mix, 4500 psi, shown on sheet A1 - top left. (19) Are than any stand-down periods on the site during work hours? (a) There are no scheduled stand down periods as of 4 September 2024. (20) Will the flight line be active during the duration of the project? (a) The base has an active flightline with helicopters running up, taxing, hovering and flying. All contractor equipment needs to be secured to prevent blowing away or rolling away from helicopter rotor wash. It is recommended that all workers have hearing protection (foam ear plugs will work) on them and use when necessary due to the loud turbine engine noise from the FEDS (engine test stand) or helicopters on the flight line.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS