Concrete Subcontractor

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for a Concrete Subcontractor involves performing concrete installation for structural components and drainage for prime contractors on ODOT shared-use trail projects. The scope of work includes the installation of retaining walls and top-of-casting concrete elements utilizing concrete spreaders, finishers, and slip-form curb machines. The contractor is responsible for delivering installed retaining walls and concrete castings. The project is managed by the DPU/Engineering Services Department of City of Toledo in Ohio under NAICS code 238110. Key requirements include strict compliance with Davis-Bacon wage determinations and the utilization of designated concrete washout areas as specified by the SWP3 plan. There is no specified set-aside status for this opportunity.

General Info

Concrete installation for ODOT shared-use trails in Toledo, Ohio, following Davis-Bacon wages.

Documents

This scope was carved out of 117683.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Emerald Avenue Shared Use Path

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 17 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 12 documents on the prime contractFrom Emerald Avenue Shared Use Path
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → DPU/Engineering Services Department of City of Toledo
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs concrete installation for structural components and drainage for prime contractors on ODOT shared-use trail projects. Installs retaining walls and top-of-casting concrete elements using concrete spreaders, finishers, and slip-form curb machines. Requires compliance with Davis-Bacon wage determinations and the use of designated concrete washout areas per the SWP3 plan. Delivers installed retaining walls and concrete castings.

Similar Contracts

Same NAICS industry code

More opportunities from Ohio → DPU/Engineering Services Department of City of Toledo

Same awarding agency

NAICS: 237310
New
SLED
Summit Street Cycle Track Phase 2 LUC-CR-1980-10.0
Solicitation # 10009074
The Summit Street Cycle Track Phase 2 project, solicitation number 10009074, is a unit price contract managed by the City of Toledo's Department of Transportation. The scope of work involves the reconstruction of one mile of pavement on Summit Street from New York Avenue to Manhattan Boulevard, which includes replacing pavement, curbs, and drive approaches, implementing minor drainage improvements, and installing a protected cycle track. Additionally, the project requires the replacement of approximately one mile of existing water main with new 8", 12", and 16" water mains. The project must be fully completed within 180 days of the Notice to Proceed, with work commencing within ten days of that notice. Bids must be submitted electronically via the PlanetBids portal by December 15, 2026. Required submission documents include ODOT project paperwork, a signed engineering services contract, a tax exemption certificate, and a bid guaranty. The selection process is based on the apparent low bidder, and the successful contractor must provide a performance and payment bond equal to 100 percent of the estimate. Compliance requirements include adherence to the Build America, Buy America Act, the Davis-Bacon Act, and the Ohio Bureau of Worker’s Compensation Drug-Free Safety Program. There is no specific set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in 24 days
View Details
NAICS: 237310
SLED
Emerald Avenue Shared Use Path
Solicitation # 117683
The City of Toledo, through the DPU/Engineering Services Department, is soliciting bids for the Emerald Avenue Shared Use Path project. This unit price contract involves the construction of a 0.91-mile shared use path from Anthony Wayne Trail to Ottawa Street as part of the Riverside Bike Trail. The scope of work includes the installation of an 11-foot wide asphalt pavement path, the geometric redesign of intersections, roadway narrowing with curb replacement, and minor drainage improvements. The project must be completed within 120 days of the Notice to Proceed, with work commencing within ten days of that notice. All construction must adhere to the 2026 City of Toledo Construction Standards, ODOT's 2023 Construction and Material Specifications, and local building and zoning codes. Award will be based on the lowest responsive bid, with a strong emphasis on Small Business Enterprise (SBE) compliance, including the submission of a complete Utilization Plan and SBE Affirmation Forms. Bidders must provide a 5% bid bond and, upon award, a performance and payment bond equal to 100% of the estimate. Required documentation includes a variety of compliance forms, such as a court-ordered child support affidavit, certificates of insurance naming the City of Toledo as an additional insurer, and EEO certifications. Bids must be submitted electronically via the PlanetBids portal by the deadline of December 8, 2026. This solicitation has no specified set-aside status.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS