Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Summit Street Cycle Track Phase 2 LUC-CR-1980-10.0

Open
10009074State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Summit Street Cycle Track Phase 2 project, solicitation number 10009074, is a unit price contract managed by the City of Toledo's Department of Transportation. The scope of work involves the reconstruction of one mile of pavement on Summit Street from New York Avenue to Manhattan Boulevard, which includes replacing pavement, curbs, and drive approaches, implementing minor drainage improvements, and installing a protected cycle track. Additionally, the project requires the replacement of approximately one mile of existing water main with new 8", 12", and 16" water mains. The project must be fully completed within 180 days of the Notice to Proceed, with work commencing within ten days of that notice. Bids must be submitted electronically via the PlanetBids portal by December 15, 2026. Required submission documents include ODOT project paperwork, a signed engineering services contract, a tax exemption certificate, and a bid guaranty. The selection process is based on the apparent low bidder, and the successful contractor must provide a performance and payment bond equal to 100 percent of the estimate. Compliance requirements include adherence to the Build America, Buy America Act, the Davis-Bacon Act, and the Ohio Bureau of Worker’s Compensation Drug-Free Safety Program. There is no specific set-aside status for this solicitation.

General Info

City of Toledo contract for Summit Street pavement, water main, and cycle track.

Place of Performance

One Lake Erie Center, 2nd Floor Toledo, Ohio 43604, OH, USA

Set-Aside

NONE

Documents

13
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this firstcertification
High
PDF, High priority: read this first10 pages · specifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstvendor-registration-form
High
PDF, High priority: read this firstlabor-standards-notice
High
DOCX, High priority: read this first2 pages · letter-of-assent
High
PDF, High priority: read this firstproject-labor-agreement
High
PDF, Low priorityspecial-notice
Low
PDF, Low priorityother
Low
PDF, Low priority2 pages · fact-sheet
Low
PDF, Low prioritytax-exempt-certificate
Low
PDF

Read all 13 documents

Due in 24 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 24 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 13 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → DPU/Engineering Services Department of City of Toledo
Contacts1 person available
OfficeOH, USA
Office AddressOH, USA
Contacts
Questions must be submitted through the Q&A tabContact

Full Description

Show more
Scope: This project will reconstruct 1 mile of pavement on Summit Street from New York Avenue to Manhattan Boulevard. This includes removing and replacing the pavement, curb, and the drive approaches, as well as minor drainage improvements. This project will also include a protected cycle track from New York Avenue to Manhattan Boulevard and the replacement of approximately 1 mile of existing water main with new 8", 12", and 16" water main.
Bid Bond: 5.00%

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes for asphalt repairs and paving services associated with the Laura Street Sewer Improvements project in Robbinsville, North Carolina. The scope of work includes asphalt pavement replacement, milling, removal, surface and binder course placement, pavement patching, trench restoration, hauling, compaction, and the application of tack coat. This solicitation is intended for bidding purposes to obtain competitive subcontractor pricing for the prime contractor's project bid. Any subsequent award is contingent upon D.R. Phillips, LLC securing the prime contract and the successful negotiation of a separate subcontract agreement. The opportunity is set aside for SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), and SAM.gov designated Small Disadvantaged businesses. Interested contractors must submit proposals by November 27, 2026, including company contact information, certification status, itemized pricing, equipment and workforce availability, and relevant experience with municipal sewer and roadway restoration. A quick payment agreement will be included, and project plans and specifications are available upon request.
D.R. Phillips, LLC

POSTED

about 1 hour ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for State Project No. 128-158, the Curtiss Park Trail, under solicitation E26-01. The project involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail along the north side of Tariffville Road, extending over the Tariffville Road bridge crossing the Farmington River to Curtiss/Pattison Parks. The scope includes the installation of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor, earth excavation of 1,172 cubic yards, and the disposal of 1,710 tons of controlled materials. All work must adhere to CTDOT Standard Specifications, including specific requirements for bituminous concrete, precast concrete blocks with a minimum compressive strength of 3,000 psi, and Connecticut Guidelines for Soil Erosion and Sediment Control. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must submit physical proposals by November 24, 2026, including a signed bid proposal, bid security, a non-collusion affidavit, and a CTDOT Contractor Prequalification Certificate. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Contractors and subcontractors are required to comply with all applicable federal, state, and municipal laws, including prevailing wage requirements. Performance and payment bonds, as well as insurance, are mandatory for the successful bidder.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Ohio → DPU/Engineering Services Department of City of Toledo

Same awarding agency

NAICS: 237310
SLED
Emerald Avenue Shared Use Path
Solicitation # 117683
The City of Toledo, through the DPU/Engineering Services Department, is soliciting bids for the Emerald Avenue Shared Use Path project. This unit price contract involves the construction of a 0.91-mile shared use path from Anthony Wayne Trail to Ottawa Street as part of the Riverside Bike Trail. The scope of work includes the installation of an 11-foot wide asphalt pavement path, the geometric redesign of intersections, roadway narrowing with curb replacement, and minor drainage improvements. The project must be completed within 120 days of the Notice to Proceed, with work commencing within ten days of that notice. All construction must adhere to the 2026 City of Toledo Construction Standards, ODOT's 2023 Construction and Material Specifications, and local building and zoning codes. Award will be based on the lowest responsive bid, with a strong emphasis on Small Business Enterprise (SBE) compliance, including the submission of a complete Utilization Plan and SBE Affirmation Forms. Bidders must provide a 5% bid bond and, upon award, a performance and payment bond equal to 100% of the estimate. Required documentation includes a variety of compliance forms, such as a court-ordered child support affidavit, certificates of insurance naming the City of Toledo as an additional insurer, and EEO certifications. Bids must be submitted electronically via the PlanetBids portal by the deadline of December 8, 2026. This solicitation has no specified set-aside status.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS