Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Concrete Supply and Placement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the supply and placement of ready-mix concrete for foundational, slab, and structural components, encompassing all associated tasks such as formwork setup, pouring, curing, and surface finishing. Work must be executed to meet established construction standards with attention to quality, timing, and safety protocols throughout the entire process. The scope requires full responsibility for material delivery, on-site handling, and proper technical execution to ensure structural integrity and compliance with industry best practices. The opportunity is classified as a subcontract under NAICS code 327320, posted on July 28, 2026, with proposals due by September 1, 2026. It is managed by the Utah agency and performed within the state, though specific location details are not provided. Subcontractors interested in bidding must respond through the designated online portal prior to the deadline, and all work must align with Utah’s regulatory and construction requirements without additional set-aside designations applied.

General Info

Supply and placement of ready-mix concrete for structural components in Utah, due September 1, 2026.

Agency

NAICS

327320 - Ready-Mix Concrete ManufacturingView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / Agency
Utah
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and place ready-mix concrete for foundations, slabs, and structural elements, including formwork, pouring, curing, and finishing.

Similar Contracts

Same NAICS industry code

More opportunities from Utah

Same awarding agency

NAICS: 236220
New
SLED
DFCM Construction - VBS Construction Stage II - Invitation to Interview - Department of Veterans and Military Affairs - William E. Christofferson Salt Lake Veterans Home - 23383490This solicitation is Stage II of a two-phase selection process for the construction of a 105-bed skilled nursing facility in West Valley City, Utah, to be managed by the Utah Department of Veterans and Military Affairs. Only contractors who were shortlisted during Stage I, the Request for Proposals, are eligible to participate in this stage, which requires them to attend an interview and submit detailed cost proposals. The project has an estimated construction cost of seventy-three million dollars, and performance must occur at the designated work site, with all labor, materials, and services delivered as directed by the Division of Facilities Construction and Management (DFCM). Submission of proposals is due by September 10, 2026, and must be delivered via registered mail or email, with no online portal specified. While no formal solicitation number is provided, the reference number DA26055-Stage II is used internally. The award basis, evaluation factors, and specific technical criteria are not outlined in the available documentation, and no federal FAR clauses are applicable—instead, the contract follows state-level provisions with internal clause numbering such as Section 11.5 and 11.6, which mandate non-discrimination, compliance with applicable laws, and adherence to ethical standards. The contractor is responsible for all aspects of construction including adherence to approved contract documents, drawings, specifications, and amendments, and must comply with local and state regulations. Deliverables include timely submittals of shop drawings, product data, samples, as-built documentation, and compliance with a detailed Critical Path Method schedule to achieve Substantial Completion within the Contract Time. Inspection and acceptance occur at the project site and are conducted jointly by DFCM, the Contractor, and the Architect/Engineer, with the Contractor bearing all costs for re-inspections and corrections. The contract requires performance and payment bonds, mandatory insurance coverage, lien waivers, and affidavits of paid payrolls and bills as conditions of payment. A one-year warranty on materials and workmanship is stipulated, along with indemnification clauses to protect the state from claims arising from the Contractor’s operations. Subcontractors must be pre-approved and disclosed prior to award, with exceptions permitted under specified conditions. No information on FOB terms, specific accounting codes, electronic invoicing systems, COR/COTR contacts, or packaging and marking standards is included. The contract also imposes no requirement for Unique Entity ID, CAGE code, or socioeconomic certifications, and does not include options, key personnel designations, or security clearance
Commercial and Institutional Building Construction

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details