Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

DFCM Construction - Prequalified Site Civil Stage II - Department of Natural Resources – State Parks- Gunlock State Park Campground Improvements - Project #22225510

Active
CR27006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Only contractors prequalified under Stage I and currently listed on the DFCM Prequalified Contractors list are eligible to submit bids for this project. The State of Utah, through the Division of Facilities Construction and Management, is seeking bids for comprehensive civil work at Gunlock State Park Campground, including earthwork and site preparation such as clearing, mass grading, and exposed rock face cutting; construction of an asphalt roadway with UTBC shoulders and pull-out areas, along with striping, signage, and guardrails; building a bridge structure with riprap and protective fencing on wing walls; and installing a full drainage system comprising culverts, catch basins, swales, and check dams, followed by environmental restoration efforts like erosion control, native plantings, retaining walls, and bank stabilization. The estimated construction cost for the project is $4,494,536.00. The solicitation, identified as CR27006, was posted on July 28, 2026, with a response deadline of September 1, 2026. Primary point of contact is Scott Jensen, reachable at sgjensen@utah.gov.

General Info

Prequalified contractors only; civil work at Gunlock State Park, $4.49M, bid due Sept 1, 2026.

Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(8)

Subcontractors List Form Instructions

DOCXinstructions

1-CR27006-22225510 Solicitation.pdf

PDF

DFCM General Conditions August 2020

PDFgeneral-conditions

2-CR27006-22225510 Approved Plans & Specifications.pdf

PDF

5-CR27006-22225510 Mandatory Meeting Location Screenshot Map.pdf

PDF

Health Insurance Statement of Compliance Form Revised 7.28.25

DOCXcompliance-form

4-CR27006-22225510 BLM Environmental Commitments.pdf

PDF

3-CR27006-22225510 Geotechnical Report.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / Agency
Utah
View Agency Profile
Office AddressUT, USA
Contacts

Full Description

Show more
**Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.**
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:
**Project Description: Earthwork & Site Prep: Perform clearing, mass grading, and exposed rock face cutting. Roadway & Safety Infrastructure: Construct asphalt roadway with UTBC shoulders and pull-out areas; install roadway striping, signage, and guardrails. Bridge Construction: Build bridge structure, install bridge riprap, and construct protective fencing on wing walls. Drainage & Environmental Restoration: Install comprehensive drainage systems (culverts, catch basins, swales, check dams) and execute site restoration (erosion control, seed mix, retaining walls, bank stabilization, and native plantings).**
**Construction Cost Estimate:$4,494,536.00**

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will upgrade the entry and exit drives along 19th Ave W, demolish the remaining slab of the Downie Building (C-14), and redevelop the area into a mix of new parking, green space, and pollinator habitat with integrated stormwater treatment features. Existing pavement in degraded condition will be milled and overlaid, while stormwater infrastructure will be replaced and expanded to divert runoff away from combined sewers into dedicated storm lines, including water quality treatment on qualifying surfaces. A new irrigation system will support the green areas, and landscaping will be added to the median within the entry drive. Electric vehicle charging stations will be installed in the new parking zone to support sustainable transportation. The project will enhance active transportation by adding a protected two-way bike lane linking the terminal entry to the West Wall bike path and improving pedestrian access to the intersection at 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be upgraded throughout the new parking area and connecting pathways, and new wayfinding elements will guide pedestrian and bicycle traffic. These improvements aim to increase safety, accessibility, and environmental sustainability at the terminal. The work is being managed by the Port of Seattle through its Waterfront Project Management team, with a forecasted posting date of July 29, 2026, under NAICS code 237310 for heavy and civil engineering construction.
Waterfront Project Management

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
International
Transportation Planning & Design-Surfacing - Preliminary Design for Truck Rest AreasThe Saskatchewan Ministry of Highways is seeking a qualified consultant to perform preliminary design work for four proposed truck rest areas along Highway 1, specifically at C.S. 1-22 near the Alberta border, C.S. 1-21 in Maple Creek, C.S. 1-19 at Gull Lake, and C.S. 1-15 at Ernfold. Two of these sites are existing rest areas requiring upgrades, while the other two are greenfield locations that need full design from inception. The consultant will determine the optimal configuration, layout, and functionality of each site, including access control measures, to meet the needs of commercial vehicle operators. The scope focuses exclusively on preliminary design and does not include detailed engineering or construction documentation. However, the financial rates submitted by the consultant will be applied if the Ministry proceeds with a second phase of work, which could involve detailed design and tender package preparation for one of the four locations. All participating consultants must be prequalified, and those under probationary status at the time of competition closure must adhere to the guidelines outlined in the Professional Services Procurement Manual PSPM 100-04 to maintain eligibility. The solicitation is open for responses until August 13, 2026, with proposals submitted through the Saskatchewan tenders portal. The work falls under the Transportation Planning & Design-Surfacing category, and all site locations are within Saskatchewan. The primary point of contact for submissions is SBP Consultants, reachable via submission@gov.sk.ca. The project is part of the Ministry’s broader efforts to enhance safety and service for long-haul trucking along key provincial corridors, with potential for future contract expansion based on preliminary design outcomes.
Highways

POSTED

about 15 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237310
New
International
Roadwork-SUPPLY&INSTALL 2 CORRUGATED STEEL PIPE CULVERTS open excavation TOTAL LENGTH 50 m CS:5-05The Ministry of Highways in Saskatchewan is issuing an advance notice for the procurement of a contractor to replace two existing culverts on Highway 5, approximately 15.47 kilometers northwest of its intersection with Highway 35. The project involves the supply and installation of two 1,800 mm diameter polymer laminated corrugated steel pipe culverts, each 25 meters long and constructed with 125 mm x 25 mm corrugations and a 2.0 mm wall thickness, totaling 50 meters in length. The culverts will be installed using open excavation on the roadway, and the Ministry will supply all materials. The project also includes the removal and disposal of a deteriorated wood pile bridge measuring 1.83 meters in rise, 3.05 meters in span, and 22.8 meters in length, along with associated earthworks such as granular base course, asphalt concrete, riprap, backfill, erosion control measures, silt fencing, and seeding. The contractor is responsible for all labor and installation, while the Ministry provides materials and components including couplers and end stiffeners. The work is anticipated to commence as early as August 2026, with a mandatory completion date no later than October 31, 2026, and the solicitation will have a shortened advertising period. Bidders must submit a deposit equal to 5 percent of their total bid amount. All quantities specified are preliminary estimates and subject to revision in the official tender documents. Questions regarding the project may be directed to a designated email address with a specific subject line, and the tender documents will be posted when available. A debriefing opportunity is provided to bidders within 30 days of award notification to review performance and identify areas for improvement in future bids. The Ministry retains the right to cancel or not proceed with the procurement at any time prior to award.
Highways

POSTED

about 15 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
SLED
P83_2026 ON-CALL GUARDRAIL HITS REPAIRThe Virginia Department of Transportation is soliciting bids for an on-call contract to perform repairs following guardrail hits across various locations in Northern Virginia, specifically within Prince William, Manassas, and Manassas Park counties. This contract, identified as P83_2026 and solicited under IFB-125222, requires prequalification before bidding and is open to contractors who can respond swiftly to incident-related damages on state-maintained roadways. All inquiries must be submitted through the CABB platform, and bids are due by August 26, 2026, at 3:00 PM. The work will involve rapid deployment and execution of repairs to ensure public safety and compliance with transportation standards after vehicle collisions with guardrails. Contractors must be prepared to operate on an as-needed basis, with no guaranteed volume of work but the expectation of frequent and often time-sensitive assignments. The contract is managed by the Virginia Department of Transportation, with point of contact Mark Taylor available for questions via email or phone. There is no set-aside classification listed, and performance will occur exclusively within the specified Virginia counties. Contractors are advised to review the full solicitation details via the provided VDOT vendor portal link to understand specific technical requirements, reporting obligations, and performance metrics tied to response times and work quality.
Virginia Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
2026 Retaining Wall ProjectThe project involves the replacement and new construction of storm drain systems, sidewalks, curb and gutter, and related infrastructure at multiple locations in Bountiful, Utah, with a specific focus on installing a gabion retaining wall, excavating, and restoring asphalt pavement and landscaping. Work includes the removal and replacement of deteriorated storm drain components such as pipes, manholes, and inlets, alongside the construction of new 12-inch and 15-inch reinforced concrete pipe systems, ADA-compliant ramps, transition structures, and waterways. The retaining wall component, identified in Schedule 4, requires installation of a 55-square-foot reinforced concrete wall in compliance with Bountiful City standards for exposed surfaces, which must have a rubbed finish. All construction must adhere to the 2025 Edition of the Manual of Standard Specifications and Manual of Standard Plans published by the Utah Chapter of the American Public Works Association, including specific requirements for subgrade compaction at 95% minimum modified Proctor, use of epoxy-coated rebar, concrete class 4000, proper curing, and sawcutting procedures. The project is governed by strict compliance with Utah state laws, and bidders must submit a 5% bid security, along with performance and payment bonds equal to 100% of the contract award, issued by sureties authorized in Utah with an A.M. Best rating of A- or better. The estimated total project cost is over $1 million, and the work must be substantially completed by October 15, 2026, with a anticipated notice to proceed on August 3, 2026. All excavation activities require a 2-day advance notice to the Blue Stakes Center of Utah, and the contractor is responsible for all testing, retesting, and remediation of non-compliant materials, including core sampling for concrete if defective within 35 days of placement, as allowed by city protocols. Retainage of 5% is held on each monthly payment and released only after final acceptance of record documents and successful completion of the engineer’s punch list within seven days of its issuance. The contractor must maintain comprehensive records for three years post-completion and provide proof of compliance with Utah licensing requirements, workers’ compensation coverage of at least $1 million, and automobile liability limits of $3 million per accident. All bid submissions must be sealed, clearly marked, and delivered by the deadline, with no consideration given for oral, telephonic, or modified bids. The
Utah

POSTED

about 19 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Utah

Same awarding agency

NAICS: 541620
New
SLED
AS27-5 Natural Capital ManagementThe State of Utah Division of Purchasing, in coordination with the Division of Wildlife Resources, is seeking a contractor to deliver professional services aimed at assessing, quantifying, enhancing, and monitoring wildlife habitats across state Wildlife Management Areas, while also facilitating the verification and transaction of natural capital assets. The selected vendor will play a critical role in translating ecological improvements into financial opportunities by promoting qualified natural capital assets to generate additional revenue streams that directly support ongoing management and enhancement activities on these areas. This contract requires a comprehensive understanding of ecological valuation, market mechanisms for natural capital, and the ability to align conservation outcomes with economic incentives. The contract term is initially set for ten years, with the possibility of two additional ten-year renewal periods, creating a potential 30-year engagement. Vendors must guarantee their pricing for the entire duration of the contract, ensuring cost stability and predictability for the state. The solicitation, titled AS27-5 Natural Capital Management, was posted on July 28, 2026, with proposals due by August 11, 2026. Award will be made to the most qualified and responsive vendor based on a scoring system compliant with state procurement code, and all work will be performed within the state of Utah. Ann Schliep serves as the primary point of contact for inquiries regarding this procurement.
Environmental Consulting Services

POSTED

about 17 hours ago

DEADLINE

in 13 days
View Details
NAICS: 238340
New
SLED
SNOC26271009 - Swimming Pool Replacement of FlooringSnow College is soliciting bids for the removal and installation of a new non-slip flooring system around the swimming pool walking areas at the Horne Activity Center in Ephraim, Utah. The project requires complete demolition of the existing tile surface, removal of all debris from campus, and installation of a new non-slip surface that includes coving along all walls adjacent to the pool. All diving boards, handrails, pole holes, starting blocks, and drain grates must be removed prior to installation and reinstalled afterward, with new safety inspections and documentation required for the diving boards and handrails. The area to be resurfaced is approximately 3,259 square feet, though vendors are responsible for verifying measurements during a mandatory site walkthrough on August 10, 2026, at 1:00 PM. Bids must include an itemized quote covering all materials, labor, tools, equipment, travel, and associated costs, with no additional charges permitted after award. Vendors must provide a minimum one-year warranty on both workmanship and materials, proof of insurance naming Snow College as additionally insured, valid licenses, and a signed contract. Only one bid per vendor is accepted; multiple or alternate proposals will be disqualified. The bid submission deadline is August 14, 2026, and work must commence as soon as possible with a specified completion date included in the proposal. All bids will be evaluated for compliance with specifications under the Utah Procurement Code, with the lowest responsive and responsible bid selected.
Tile and Terrazzo Contractors

POSTED

about 17 hours ago

DEADLINE

in 17 days
View Details