Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Missouri was posted on June 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Concrete Supply (Ready-Mix)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 327320
New
SLED
Ready Mix Concrete Supply and Delivery
Solicitation # 27-P-00035
Solicitation 27-P-00035 is a request for quotes from the City of Tampa Parks and Recreation department for the supply and delivery of ready-mix concrete for various city-wide projects. The scope of work includes the provision of 3000 PSI ready-mix concrete and 3000 PSI metered volumetric concrete, both requiring 1.5 pounds of fiber mesh per cubic yard with a 6 cubic yard minimum order. Additionally, the contract covers concrete pump services for lengths between 20 and 250 feet and hourly labor for forming and finishing. The City estimates a total annual requirement of approximately 100 cubic yards, with all deliveries required to be within the City of Tampa limits and completed within 24 hours of order receipt. The contract will be awarded to the lowest responsive and responsible bidder, with the City reserving the right to award by division, line item, or aggregate total. Bidders must be licensed in the State of Florida, provide proof of insurance prior to the award, and utilize the E-Verify system for employment eligibility. All shipments are FOB Destination, and payment is processed approximately 30 days after the receipt of itemized invoices and acceptance of materials, in accordance with the Florida Prompt Payment Act. Compliance with non-discrimination laws, the Civil Rights Act of 1964, and City of Tampa ordinances is mandatory, and failure to adhere to these standards is considered a material breach of the award.
Parks & Recreation

POSTED

about 20 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract entails the supply of ready-mix concrete for foundational footings, structural walls, and other load-bearing elements, with mandatory delivery via pump truck and performance of slump testing to ensure quality and consistency. All materials must meet specified engineering standards to support structural integrity throughout the project. The work is tied to a subcontract under the Missouri Office of Administration – Facilities Management, Design, and Construction – Chapter 8, with performance requirements aligned to the NAICS code 327320 for concrete product manufacturing. The solicitation was posted on June 10, 2024, and responses are due by July 23, 2024, with all deliveries and services expected to be conducted within the agency’s designated project locations across Missouri. Participants must comply with state procurement procedures and demonstrate capacity to fulfill volume and timing demands for construction activities.

General Info

Supply ready-mix concrete via pump truck with slump testing for Missouri state projects, compliant with NAICS 327320 and state procurement rules.

Documents

This scope was carved out of U2406-01.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construct New Columbarium Wall - Higginsville Veterans Cemetery

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri Office of Administration - Facilities Management, Design, and Construction - Chapter 8
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply ready-mix concrete for footings, walls, and structural elements, including pump truck delivery and slump testing.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS