Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Conditional Use Permit to allow a trade/vocational school, (The Southern California Health Institute) in the General Industrial (M-2) Zone

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Southern California Health Institute, operating as the SOCHI vocational school, will occupy a vacant three-story office building in Burbank, California, with approximately 66,120 square feet of space, under a conditional use permit allowing educational use within the General Industrial M-2 zone. The interior renovations will reconfigure the north-west wing by dividing the large open areas into classrooms, laboratories, and academic facilities while preserving the existing perimeter offices. The north-east section will undergo upgrades to accommodate faculty and student lounges, conference rooms, and administrative offices without major structural changes. Minor exterior work includes façade repairs and maintenance to address damaged elements. Site improvements will enhance accessibility and security, including restriping the parking lot to provide a total of 79 spaces with added ADA-compliant stalls, installing new ADA-compliant pedestrian pathways, adding ten bicycle parking spaces, and constructing an eight-foot tall perimeter fence along Winona Avenue while upgrading the adjacent three-foot block wall and adding a metal fence component. Vehicular access remains unchanged, and the facility will serve as a trade and vocational training center with no expansion of the building footprint or changes to the existing zoning envelope. The project is governed by the City of Burbank, with Silvia Sulis as the primary point of contact for planning inquiries.

General Info

SOCHI vocational school to occupy 66,120 sq ft Burbank building with renovations, ADA upgrades, parking, and perimeter fence for trade training.

Agency

California → City of Burbank

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Winona Avenue, North San Fernando Boulevard, North Naomi Street, Burbank, CA, 91504

Set-Aside

NONE

Documents

(1)

CEQA Notice of Exemption for Southern California Health Institute Vocational School

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Burbank
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Burbank
Office AddressN/A
Contacts
Silvia SulisPlanning Technincia

Full Description

Show more
The SOCHI vocational school will be occupying the existing, vacant, three-story office building, with a floor area of approximately 66,120 square feet. The proposed tenant improvements include partitioning the large central open space on the two floors of the north-west wing to create classrooms, labs, and other academic and student spaces, while keeping the existing private office spaces around the perimeter. The north-east section will be upgraded but not fully reconfigured and will include office space as well as student and faculty lounges, conference rooms, and offices. The scope of work includes some minor exterior improvements, such as façade maintenance and repairs of damaged building elements. Site improvements will include the following: parking restriping (including the addition of several ADA stalls) bringing the total parking spaces available to 79; new ADA compliant pathways; the addition of bicycle parking (8 long term spaces, 2 short-term spaces); and a new 8-foot tall perimeter fencing along Winona Avenue, including improvements to an existing 3-foot tall block wall and the addition of a metal fence. No changes are proposed to the vehicular access.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Enlisted Unaccompanied Personnel Housing at Eglin AFB, FL
Solicitation # enlisted-unaccompanied-personnel-housing-eglin-afb-fl
The Enlisted Unaccompanied Personnel Housing project at Eglin Air Force Base in Florida involves the construction of two two-story barracks buildings. Each building will provide 120 beds across 32 units, with each unit featuring a kitchen, dining area, living area, and laundry room. Common building facilities include a lobby, elevator, entrance vestibule, exercise room, day room, lounge, and dedicated mechanical, electrical, and communications rooms. The project also encompasses extensive site amenities, including a large open pavilion, basketball and volleyball courts, and parking areas for vehicles and motorcycles. Comprehensive sitework is required, covering roadways, concrete sidewalks, grading, storm sewer systems, utilities, and landscaping. Managed by Roy Anderson Corp under NAICS code 236220, this solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB entities. The scope of work is broad, spanning commissioning, demolition, masonry, steel, roofing, HVAC, fire protection, and electrical systems. Bidders must comply with equal opportunity regulations, including Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans Readjustment Act of 1974. Proposals for labor, materials, supervision, and equipment must be submitted by August 18, 2026, at 1:00 PM CT.
Roy Anderson Corp

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT
Solicitation # windsor-secondary-treatment-system-upgrades-project-0
The Windsor Secondary Treatment System Upgrades Project involves extensive infrastructure improvements at a Water Reclamation Facility in California. The scope of work includes dewatering the aeration basin, excavating and installing a new concrete aeration basin facility with a flow splitting structure, air lines, diffusers, a mixing system, and pumping systems for surface wasting and high flow return. Additionally, the project requires the construction of a new blower building, an electrical control building, and a carbon feed building equipped with internal tanks and chemical metering pumps. Further requirements include a below grade secondary clarifier weir flow splitting structure and the relocation of a concrete sand filter high flow diversion structure. The project has a duration of 482 working days and includes intermediate milestones. Funding may be provided through the EPA Water Infrastructure Finance Innovation Act, which imposes specific requirements for contractors and subcontractors. Participation from disadvantaged, minority, and women-owned business enterprises is encouraged. The solicitation is managed by C. Overaa & Co., with a response deadline of September 3, 2026. All contract documents, plans, and specifications are available electronically through the Town of Windsor website and BuildingConnected.
C. Overaa & Co.

POSTED

about 12 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
The Northlands Job Corps Center in Vergennes, Vermont, is soliciting bids for a fee-for-service subcontract to perform complete bathroom renovations in two dormitory buildings. The project involves renovating four distinct areas in Building 17, totaling approximately 944 square feet, and five distinct areas in Building 18, totaling approximately 1,260 square feet. These areas include multi-stall student showers, toilets, and vanity spaces across various floors. All work must adhere to ADA, OSHA, the National Electrical Code, and NFPA Standard No. 101 Life Safety Code. To maintain center operations, contractors must renovate the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Required submission materials include a completed bid sheet with an itemized cost breakdown separating labor and materials, a proposed project schedule, current Vermont state professional licenses, and standard vendor paperwork such as Form W-9 and a Vendor Acknowledgement Form. Evaluation is conducted by ETR, and the lowest bid does not guarantee an award. Payment terms are net 30 days upon receipt of a proper invoice and proof of goods. The contract is a small business set-aside and requires a current certificate of liability. All purchases for the center are exempt from sales tax.
Northlands Job Corps Center /ETR

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details