Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Conn Valley Road Bridge over Conn Creek Replacement Project Request for Proposals

Closed
BRLO 5921 (094)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes for asphalt repairs and paving services associated with the Laura Street Sewer Improvements project in Robbinsville, North Carolina. The scope of work includes asphalt pavement replacement, milling, removal, surface and binder course placement, pavement patching, trench restoration, hauling, compaction, and the application of tack coat. This solicitation is intended for bidding purposes to obtain competitive subcontractor pricing for the prime contractor's project bid. Any subsequent award is contingent upon D.R. Phillips, LLC securing the prime contract and the successful negotiation of a separate subcontract agreement. The opportunity is set aside for SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), and SAM.gov designated Small Disadvantaged businesses. Interested contractors must submit proposals by November 27, 2026, including company contact information, certification status, itemized pricing, equipment and workforce availability, and relevant experience with municipal sewer and roadway restoration. A quick payment agreement will be included, and project plans and specifications are available upon request.
D.R. Phillips, LLC

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 16 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
DAS Procurement

POSTED

about 18 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Conn Valley Road Bridge over Conn Creek Replacement Project involves the proposed replacement of an aging two-lane bridge, originally built in 1920 and later widened in 1946, located approximately 4.1 miles east of Silverado Trail near Lake Hennessey in Napa County. The existing structure has a sufficiency rating of 31.6 and presents limitations such as inadequate inspection access and non-compliant bridge barriers. Conn Valley Road serves as a critical rural connector with limited alternate routes, necessitating careful construction staging to minimize traffic disruptions. Funded through the Federal Highway Administration's Highway Bridge Program with a local match, the project is administered by Caltrans with Napa County as the CEQA lead agency and project advocate. The project entails evaluating options to either widen the existing bridge or replace it with a new structure designed according to current AASHTO and Caltrans standards. Right-of-way acquisition may be necessary if a new alignment is chosen, which could involve temporary easements for detours and construction access. The estimated construction cost is around $6 million. Consultants responding to the request for proposals are expected to conduct thorough site inspections, review provided documentation including multiple bridge inspection reports and environmental studies, and develop design recommendations while considering staging options to limit full road closures. The project has no DBE goal and is coordinated through the County of Napa Public Works, with interested parties directed to contact the associated engineer, James Reese.

General Info

Replacement of aging Conn Valley Road Bridge near Lake Hennessey, Napa County, costing $6 million.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

6
PDF, High priority: read this first33 pages · rfp
High
PDF, High priority: read this first24 pages · contract-document
High
PDF, High priority: read this first2 pages · sow
High
PDF, High priority: read this first24 pages · contract-document
High
PDF, Low priority63 pages · inspection-report
Low
PDF, Low priority14 pages · other
Low

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 5 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeNapa, CA, 94503, USA

Full Description

Show more
Project Location The County, in cooperation with Caltrans, is proposing to replace the Conn Valley Road over Conn Creek Bridge, an existing two-lane bridge with a new two-lane bridge; however, Caltrans wants Napa County to evaluate widening the existing bridge. The County will be the project advocate and lead CEQA agency. Caltrans will be the lead agency for NEPA. Funding for the project will be provided through the FHWA Highway Bridge Program (HBP) with a local County match. The proposed project is located approximately 4.1 miles east of Silverado Trail on Conn Valley Road near the Northwest corner of Lake Hennessey, in an unincorporated portion of the County. The existing roadway is to rural residents, wineries, and Moore Creek Park. Project Need and Purpose The existing bridge (Bridge No. 21C0077) was originally constructed in 1920 and was widened in 1946 and holds a sufficiency rating of 31.6. Review the Bridge inspection reports for current condition. Present Condition Conn Valley Road is a two-lane, 18-foot wide, minor collector rural road that serves two-way traffic with a posted speed limit of 35 mph. The last recorded ADT was 740 in 2005 with a projected ADT of 1220 in 2040. The RC T-girder superstructure (1946) was built on top of an older steel girder (encased in concrete) superstructure (1920). The original steel girder bridge was used as falsework and it was assumed that both the older and the newer superstructures carry live loads. However, the safe load-carrying capacity of the structure was calculated based on the newer superstructure (1946 RC T-girder). Due to the current configuration, portions of the bridge could not be inspected, including the open concrete T-girders and the underside of the concrete deck. The existing bridge does not have bridge barriers that meet current standards. It should be noted that Conn Valley Road does not have a reasonable alternate/ detour route in the vicinity. Full roadway closure will need to be very limited; therefore, the consultant will need to consider construction staging in its design alternatives for either installing a temporary bridge or a new bridge on nearby alignment and removal of the old bridge. The County's consultant is expected to scope the Project based on the project descriptions provided, as well as its team's site inspection and observations prior to the proposal. The following documents for Project are attached for review in Attachment 3 : Vicinity & Location Map 1946 Widening As-Built Bridge Inspection Report dated June 25 th , 2020 Bridge Inspection Report, dated May 26 th 2021 Bridge Inspection Report, dated May 9 th , 2023 LAPM Exhibit 6-A: Preliminary Environmental Study (PES) Caltrans Memorandum regarding Section 106 Review of the Preliminary Studies Form dated October 16, 2024 LAPM Exhibit 7-B: Field Review Form LAPM Exhibit 7-C: Roadway Data LAPM Exhibit 7-D: Major Structure Data This Project has no DBE Goal. Design Information The proposed project will replace the existing bridge over Conn Creek with a new structure, based on recommendation from the design team. The bridge will be designed to meet current AASHTO and Caltrans bridge standards. The consultant team will provide a type selection report comparing the widening of the existing bridge with the replacement of the existing bridge. RIGHT OF WAY Information Permanent right of way acquisition may be necessary if the new bridge is placed on an alternate alignment. Temporary construction easements may be required from adjacent parcels to allow for a local detour crossing, to provide access to the creek, and as construction storage and staging areas. The site is surrounded by one parcel owned by the City of Napa. Final determination of right-of-way needs will be made comparing boundary survey information to the project temporary and permanent footprint. The project is Federally funded by the Federal Highway Administrations Highway Bridge Program and is being administered by Caltrans Local Assistance Division. The total project construction cost is currently estimated to be approximately $6,000,000.

More opportunities from California → Public Works

Same awarding agency

NAICS: 561612
New
SLED
Security Guard Services
Solicitation # PM112601
Napa County is seeking a professional security firm to provide unarmed uniformed security guards for various county-owned and operated facilities, including community centers, professional offices, and industrial locations. The contractor will be responsible for maintaining a highly visible public safety presence through posted, ambulatory, and mobile patrols, responding to safety incidents, and acting as a liaison for visitors. Key requirements include the use of an electronic guard tour system for task verification, the ability to issue parking citations, and a staffing capacity of at least 5.5 FTE. All guards must be drug-free, possess a valid Class C California Driver License and a Guard Card, have at least twelve months of experience, and undergo background screening to ensure they are devoid of felonies. The contract is anticipated to begin on July 1, 2027, with an initial three-year term and two optional one-year extensions. Award selection is based on a best-value determination using a points-based scoring method, with 30% of the evaluation weighted toward experience and qualifications. Proposers must submit their responses via the Napa County e-Procurement portal by January 14, 2027. There is no set-aside status for this solicitation. The selected vendor must comply with the California Business and Professions Code and ensure all digital deliverables meet WCAG 2.1 Level AA accessibility standards.
Security Guards and Patrol Services

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 238320
New
SLED
Graffiti Abatement Services
Solicitation # 2526-RFP-014
The City of Fullerton is soliciting proposals for professional graffiti abatement services to manage the removal of unauthorized inscriptions from public and private property. The selected contractor will be responsible for providing all labor, materials, tools, and equipment to perform removal services five times per week, with a requirement to be available 24 hours a day, seven days a week. Additionally, the contractor must develop and implement an anti-graffiti campaign focusing on public education, community engagement, and prevention initiatives. The contract features an initial base term of 36 months, with the City holding the option to extend the agreement for up to two additional one-year terms. To qualify, contractors must possess valid California Contractors State License Board classifications C-33 or C-61/D-38 and maintain a City of Fullerton Business License. Compliance with OSHA regulations and California Prevailing Wage Laws is mandatory. Insurance requirements include workers' compensation, a minimum of $1,000,000 in employers' liability, $2,000,000 in professional liability, and an employee/officer fidelity bond. Invoicing is conducted monthly in arrears, with payments issued within 45 days of receipt. Proposals must be submitted electronically via the OpenGov portal by January 11, 2027, and must include a technical proposal, a separate fee proposal, and a detailed contractor questionnaire. There is no specified set-aside status for this solicitation.
Painting and Wall Covering Contractors

POSTED

2 days ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS