Connecting Lafayette Downtown Pathways and School
Forecast
forecast_ac80965c-d5b2-4d72-9dd0-e5305563af0fState & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → City of Lafayette
Place of Performance
School St., Topper Ln., and St. Mary's Rd., Lafayette, CASet-Aside
NONE
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownGet what you need to respond
No documents were posted with this contract.
- Buyer contactEmail and phone
- Original solicitationLink to the source posting
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
PhaseForecast
Posted
forecast
Organization & Contact Information
Show more
AgencyCalifornia → City of Lafayette
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Lafayette
Office AddressN/A
Contacts
Laurie SucgangSenior Civil Engineer
Full Description
Show more
The project will construct concrete curb, gutter, and asphalt concrete pathways on School Street (10-feet wide) and Topper Lane (6-feet wide, except where pathway narrows around fire hydrants and utilities, etc.) between Moraga Road and St. Mary's Road with direct connections to the Lafayette-Moraga Regional Trail; and a concrete curb, gutter, and sidewalk on the north side of St. Mary's Road between Topper Lane and Birdhaven Court.
To construct the features above, excavation would occur on average at 1.5 feet and at a maximum depth of five feet. Utility poles, signages, fire hydrants, and storm drain inlets would be relocated, removed and/or replaced as well. ADA curb ramps would be upgraded for all street crossings. Stormwater treatment bioretention areas would be installed along School Street, and landscaping and irrigation would be installed along School Street and Topper Lane. School Street and Topper Lane will be repaved.
Similar Contracts
Same NAICS industry code
Research this forecast and prepare for the solicitation
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 750+ contractors already using CLEATUS
