Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Connecting Lafayette Downtown Pathways and School

Forecast
forecast_ac80965c-d5b2-4d72-9dd0-e5305563af0fState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Lafayette

Place of Performance

School St., Topper Ln., and St. Mary's Rd., Lafayette, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lafayette
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Lafayette
Office AddressN/A

Full Description

Show more
The project will construct concrete curb, gutter, and asphalt concrete pathways on School Street (10-feet wide) and Topper Lane (6-feet wide, except where pathway narrows around fire hydrants and utilities, etc.) between Moraga Road and St. Mary's Road with direct connections to the Lafayette-Moraga Regional Trail; and a concrete curb, gutter, and sidewalk on the north side of St. Mary's Road between Topper Lane and Birdhaven Court. To construct the features above, excavation would occur on average at 1.5 feet and at a maximum depth of five feet. Utility poles, signages, fire hydrants, and storm drain inlets would be relocated, removed and/or replaced as well. ADA curb ramps would be upgraded for all street crossings. Stormwater treatment bioretention areas would be installed along School Street, and landscaping and irrigation would be installed along School Street and Topper Lane. School Street and Topper Lane will be repaved.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is seeking competitive subcontractor quotes for asphalt repairs associated with the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This solicitation is for bidding purposes to assist the prime contractor in preparing their project bid and is not a formal subcontract agreement. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt work necessary for project completion. Interested contractors must submit their proposals by November 27, 2026, via email to Shane Phillips. Submissions must include company contact information, itemized pricing, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all qualified contractors are encouraged to apply, there is a specific emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included for the selected contractor.
D.R. Phillips, LLC

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additionally, the project requires surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services like storm water pollution prevention. Required materials range from ready mix and precast concrete to manhole materials and various valves and gaskets. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and interested parties should coordinate through Lead Estimator Ken Johnston via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
International
Labelle Avenue Reconstruction RFP
Solicitation # 2027-PW-0018
The City of Terrace is soliciting proposals for the Labelle Avenue Reconstruction project in British Columbia, specifically covering the area between Munroe Street and Caledonia Drive. The scope of work involves the replacement and upgrading of municipal infrastructure, including water, sanitary sewer, and storm sewer systems, as well as roadway reconstruction, concrete curb and gutter installation, sidewalk facilities, and asphalt pavement restoration. The project also requires comprehensive support services such as traffic management, environmental protection, and utility coordination, with all work adhering to the Master Municipal Construction Documents 2019 Edition. The expected project start date is March 15, 2027, with substantial performance targeted for August 15, 2027. Proposals must be submitted electronically to [email hidden] by December 11, 2026, at 2:00 pm. The selection of the Preferred Proponent will be based on the highest aggregate score, weighted by price (50%), methodology and work plan (20%), experience and expertise (15%), and past performance (15). Successful bidders must provide a Performance Bond and a Labour and Material Payment Bond, each for 50% of the contract price, along with a WorkSafeBC clearance letter and specified insurance policies. Key operational requirements include identifying all electrical and fiber optic lines two working days prior to construction and adhering to specific municipal health and safety amendments.
City of Terrace

POSTED

about 3 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
RFB 27-54218 Burruss Park Bridge Construction
Solicitation # RFB 27-54218
The City of Marietta is soliciting bids for the Burruss Park Bridge Construction project, RFB 27-54218, to replace an existing triple 42-inch culvert drain under the Burriss Park main trail with a 60-foot prefabricated, vehicular rated bridge. The scope of work includes the removal of existing culverts, headwalls, trail surfaces, and trees, as well as the construction of bridge abutments and stream bank improvements. While the city will furnish the bridge to the site, the general contractor is responsible for installation and coordination. The project excludes roadway paving and improvements, with a required completion timeline of 90 calendar days and a 12-month guarantee period following final acceptance. The contract will be awarded to the lowest responsive and responsible bidder based on a single lump-sum base bid. Bidders must submit proposals electronically via BidNetDirect.com by December 4, 2026, including a bid bond or certified check of at least 5 percent of the bid. Successful bidders must provide a performance bond for 100 percent of the contract value and a labor and material payment bond for 110 percent. Mandatory requirements include compliance with the Georgia Security and Immigration Compliance Act, the submission of a Contractor Affidavit and Agreement, and adherence to Georgia DOT and Marietta Power and Water System specifications. Payment is issued 30 days after completion and acceptance of the work.
City of Marietta

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS