This Solicitation opportunity from Department Of Defense was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CONNECTING LINK, RIG
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract is for the procurement of 96 connecting links, rig, with NSN 3040-01-158-9660, under solicitation SPE7L2-26-T-0558, which is a total small business set-aside. The delivery timeline requires delivery within 743 days after award, and the contract includes strict quality assurance requirements. First article testing is mandatory for item 3040/11589660, requiring the contractor to test one unit and submit a full test report within 120 calendar days from contract award. The contractor must provide 14 days’ written notice prior to shipping the test unit for government final acceptance testing and must comply with all supplemental first article requirements detailed in Procurement Note H03. Upon receipt, the government will issue written approval, conditional approval, or disapproval within 60 days. Production lot testing is required after first article approval and must be priced into the CLIN to cover the cost of samples consumed during testing. The contractor must notify the contracting officer and quality assurance representative at least 14 days in advance of making the production lot available for sample selection. One random sample will be selected from the lot, with sample size subject to approval by the QAR if not otherwise defined in the technical data package. Samples must be shipped traceably to the Redstone Technical Test Center with specific labeling, documentation including signed DD Forms 1222 and 250, test results, certifications, drawings, and a prepaid return label. The Government will conduct testing within 180 days plus an additional 60-day administrative period. Fast Pay is not applicable and all disposition of tested units must follow FAR clauses 52.209-3 or 52.209-4. The contract is managed by the Department of Defense under the Land Supplier Ops Wheeled Vehicles organization, with Shaun Sehgal as the primary point of contact.
General Info
Agency
NAICS
Place of Performance
540 FIRST STREET SE BLDG 1846, CORPUS CHRISTI, TX, 78419-5255, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 3040 / 11589660 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 120 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 60 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or
SPE7L2-26-T-0558
SECTION A
applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 180 test plus 60 NSN/Part Number: 3040-01-158-9660 Quantity: 96 EA Purchase Request: 7010568882QTY: 96 Delivery: 743 days ADO
More opportunities from Department Of Defense → LAND SUPPLIER OPNS WHEELED VEHICLES
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
