Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Consolidation of Muller Mutual Water Company with Tuolumne Utilities District

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Consolidation of Muller Mutual Water Company with Tuolumne Utilities District project, identified by solicitation number 5510002-001C, is managed by the State Water Resources Control Board Division of Financial Assistance. The project is funded through the Drinking Water State Revolving Fund Program and is led by the Tuolumne Utilities District. The primary scope of work involves the consolidation of the Muller Mutual Water Company into the Tuolumne Utilities District, alongside the replacement of 1.97 miles of potable water lines along Mira Monte Road, Sunrise Drive, and Canyon Drive in Sonora, California. This infrastructure work includes the installation of new meters, meter vaults, and fire hydrants. The project is classified under NAICS code 237110 and is designated as a Class 2 categorical exemption under California Code of Regulations section 15302, as it involves the reconstruction of utility facilities with negligible or no expansion of capacity. Consequently, the project is exempt from the California Environmental Quality Act and is expected to have no significant impact on water quality. Key administrative contacts include District Engineer Erik Johnson and Environmental Scientist Robyn Mendoza.

General Info

Tuolumne Utilities District will consolidate Muller Mutual Water and replace 1.97 miles of piping.

Agency

California → SWRCB, Division of Financial Assistance

Place of Performance

Mira Monte Road, Sunrise Drive and Canyon Drive, Sonora, CA, 95379

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Financial Assistance
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Financial Assistance
Office AddressN/A
Contacts
Robyn MendozaEnvironmental Scientist
Erik JohnsonDistrict Engineer

Full Description

Show more
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project referred to internally as Muller Mutual Water Company Consolidation with Tuolumne Utility District Project. The Project includes consolidation of Muller Mutual Water Company with Tuolumne Utilities District and replacement of existing potable water lines along 1.97 miles of roadway with new fire hydrants, meters and meter vaults.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with full HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, as well as specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary contact for this opportunity is Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS