Construct a Modification/Repair to Exisiting Wastewater System at Historic Grossi "M" Ranch, Point Reyes National Seashore, CA

Awarded
N8536100750Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bid issued by the Isle of Wight County Parks and Recreation department for the Phase 1 construction of Henry H. Bradby Park in Smithfield, Virginia. The project involves the development of approximately 6.63 acres of a 51.67-acre county-owned parcel, with the remaining land designated as undisturbed open space. The scope of work includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management facilities. Key public amenities to be constructed include a gravel parking lot, playground, picnic shelter, basketball court, walking trails, site furnishings, and landscaping. All work must be substantially complete within 300 days of the notice to proceed, with final completion due 45 days thereafter. The project is funded through the National Park Service Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with various federal and state civil rights and disability acts. Bidders must provide a bid bond equal to five percent of the total bid value for projects exceeding 500,000 dollars. Award will be granted to the lowest responsive and responsible bidder, with evaluation factors including quality, qualifications, and conformity to specifications. Technical compliance is required under the 2018 Virginia Statewide Building Code, VDOT Road and Bridge Standards, and the Virginia Stormwater Management Handbook. Bids must be submitted via the designated Procurement Portal by November 16, 2026, at 3:00 pm.
Parks & Recreation

POSTED

about 6 hours ago

DEADLINE

in 17 days
NAICS: 237990
New
Federal
Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Solicitation # PANNWD26P0000030936
The U.S. Army Corps of Engineers, Kansas City District, is conducting market research for the Bank Stabilization and Navigation Program to identify qualified contractors capable of performing complex riverine construction work along the Missouri River, from River Mile 0 near St. Louis, Missouri, to River Mile 553 near Nebraska City, Nebraska. The work involves constructing, modifying, or repairing stone dikes, revetments, bank paving, revetment overlays, and excavation of notches, all of which must be executed using floating equipment due to the absence of land access. Operations require mobilization of barges to transport graded stone from quarries and placement via track-hoe from work barges, with equipment needing to operate in water depths of four feet or more. The Government plans to establish a Multiple-Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract with a combined ceiling of $50 million, consisting of a three-year base period and a two-year optional ordering period. The North American Industry Classification System code is 237990, with a small business size standard of $45 million, and businesses of all sizes are encouraged to respond, though small, 8(a), HUBZone, service-disabled veteran-owned, and women-owned businesses are specifically encouraged to participate, as responses will inform potential set-asides. Respondents must submit a ten-page capability statement detailing their business size, UEI and CAGE codes, bonding capacity, experience with similar projects completed in the last five years, subcontracting arrangements, and joint venture structure, along with organizational contact information. All submissions must be provided electronically in Word or PDF format by the deadline of 12 p.m. CDT on June 1, 2026, to the designated contract specialist and contracting officer. This is a sources sought notice only, not a solicitation, and no funds are available for response preparation or reimbursement. Responses are voluntary, non-binding, and will be used solely for market research to shape future procurement decisions, with proprietary information protected from disclosure.
W071 Endist Kansas City

POSTED

about 7 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract involves the construction of a modification or repair to the existing wastewater system at the historic Grossi "M" Ranch located within Point Reyes National Seashore, California. Issued by the Department of the Interior through the Dsc Contracting Services Division based in Denver, Colorado, this solicitation was initially posted on December 22, 2009, as a presolicitation notice. Due to technical difficulties caused by an erroneous link between the Federal Business Opportunities (FBO) website and the National Business Center (NBC), contractors were initially provided with a canceled 'N' document. As a remedy, interested parties are advised to reference the 'Q' document (Q8536100750) directly on the NBC's IDEAS-EC website to access the original solicitation and any amendments. Because of these ongoing technical issues, the associated documents remain accessible on the NBC platform, and a technical fix is underway to restore proper linkage from FBO to NBC. Additionally, an amendment will soon be issued to extend the due date for quotes, allowing contractors additional time to respond. This contract emphasizes the importance of monitoring updates on the NBC website and adhering to the new document routing procedures to ensure successful participation in the solicitation process.

General Info

Construction contract for wastewater system repair at Grossi Ranch, Point Reyes; monitor NBC site updates.

Contract Value

$26,374

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The response deadline was removed. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
This modification of a previously announced procurement action corrects the following: the correct Classification code is "Y", the correct NAICS code is "237110", and the references to RFP have been replaced with "RFQ." Below is the corrected announcement language for this requirement. ******** CONSTRUCT A MODIFICATION/REPAIR TO EXISTING WASTEWATER SYSTEM AT THE HISTORIC GROSSI "M" RANCH, POINT REYES NATIONAL SEASHORE The National Park Service (NPS) has a requirement for the construction of a modification/repair to an existing wastewater system located at the Historic Grossi "M" Ranch within Point Reyes National Seashore. The work of this project consists of installing a new 1,200 gallon septic tank for a three-bedroom house, tie-in a septic tank from another neighboring 3-bedroom house to the new septic tank, connect waste lines from both houses to the new tank, test for water tightness, and construct an effluent waste disposal field and other related tasks per the project Specifications. The Contractor will be responsible for obtaining all permits, and approval of design drawings, from the County of Marin Environmental Health Services. All work will be performed under a single lump sum contract. The project performance period will not to exceed 180 days after receipt of a notice to proceed. The Request for Quotation (RFQ) will be available via electronic commerce only and can be accessed on or after Friday, December 11, 2009 at either http://www.fbo.gov or directly through the DOI National Business Center site at http://ideasec.nbc.gov. Due to the urgency of the repair, the due date for receipt of quotations will be Tuesday, December 29, 2009 by 5:00PM. The contractor is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFQ. A SITE TOUR has been formally scheduled for Thursday, December 17, 2009 at 1:00PM. Interested parties shall meet Project Manager Kirsten Hardin in the parking lot area of Point Reyes National Seashore Headquarters, located at 1 Bear Valley Road, Point Reyes Station, CA 94956. This project work is identified under NAICS 237110 with the magnitude of construction estimated between $25,000 and $100,000. This acquisition is unrestricted. All responsible sources may submit a quotation which, if timely received, will be considered. The NPS welcomes the participation of small, minority, women, and disabled veteran owned business enterprises. Interested parties may explore the Point Reyes National Seashore website (if desired) to acquaint themselves with the general area or view park maps at http://www.nps.gov/PORE. The point of contact for this RFQ is: Alanna R. Gardner, Contract Specialist, Point Reyes National Seashore, telephone: +1 (555) 000-0000, email: contact@example.gov, fax: +1 (555) 000-0000.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237110
New
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming. The project scope involves extensive structural, utility, and preservation work on one lodge, eight cabins, one garage, two outbuildings, and a water well structure to convert them into employee housing. Key technical requirements include the installation of a new sanitary sewer collection system, lift station, and water distribution for domestic and fire service, as well as the expansion of the parking lot to include ADA spaces. The project is estimated to have a construction magnitude exceeding 10 million dollars, with a base performance period of 303 calendar days, potentially extending to 669 days depending on the selected CLINs. The government will award the contract using the Best Value Continuum Tradeoff Process, evaluating proposals based on technical approach, project experience, schedule, and past performance, with non-price factors being equally important to price. Contractors must adhere to strict environmental and safety regulations, including potential seasonal closures from February 1 to August 15 for bald eagle nesting and protections for roosting bats. Additionally, the project requires the management of hazardous materials, as surveys have identified potential asbestos and lead-based paint across the facilities. Proposals must be submitted electronically to the Contracting Officer, Tony Jasper, by the specified deadline, and the successful bidder will be required to provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 14 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

14 days ago

DEADLINE

in 4 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

17 days ago

DEADLINE

in 7 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

17 days ago

DEADLINE

in about 1 hour
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS